energy efficiency program for business

advertisement
ENERGY EFFICIENCY
PROGRAM FOR BUSINESS
2016 Program Application
This Application is to be used for projects completed with a Final Application
submitted during the 2016 Program Year (Jan. 1, 2016 – Nov. 30, 2016).
Section 1 – Application
Incentive Application Checklist....................................... 2
Customer Information....................................................... 3
Contractor Information..................................................... 4
Third Party Payment Authorization............................... 4
Final Application Agreement........................................... 5
Incentive Summary, Final Agreement Information
and Account Holder Signature Page.............................. 6
Section 2 – Incentive Worksheets*
Lighting Incentive Worksheet.......................................... 7
HVAC Electric Incentive Worksheet...............................10
Miscellaneous Electric Incentive Worksheet................ 17
Process Electric Incentive Worksheet...........................18
Food Service – Electric and Refrigeration
Incentive Worksheet........................................................20
HVAC Gas Incentive Worksheet.....................................22
Hot Water and Laundry Incentive Worksheet.............23
Insulation Incentive Worksheet.....................................24
Process Gas Incentive Worksheet.................................24
Boiler/Furnace Tune-up Incentive Worksheet.............25
Food Service – Gas Incentive Worksheet.....................26
Custom Measures Worksheet Instructions..................27
Prescriptive or Custom Project?...................................28
Custom Incentive Worksheet ........................................29
Boiler/Furnace Tune-up Addendum..............................32
How to Submit Your Application...................................36
* Some Prescriptive incentives and all Custom incentives require a
Reservation Application prior to beginning your project.
A02
For New Construction and Major Renovation
projects, download our NC/MR Application at
dteenergy.com/savenow
If you have questions about other projects and
the appropriate Application to submit, contact us
at 866-796-0512 (press option 3) or email us at
saveenergy@dteenergy.com
V1:11/01/15
Checklist
Prescriptive and Custom Incentive Application Checklist
This form MUST be included with any Reservation and/or Final Application.
If this is a New Construction or Major Renovation project, please use that Application, which can be found
online at: dteenergy.com/savenow.
Submittal Date
Is this a revised Application?
Application Number (if known)
yes
no
DTE Energy Efficiency Program For Business
Email: saveenergy@dteenergy.com
Fax: 313.664.1950
Phone: 866.796.0512
Web: dteenergy.com/savenow
Mail: P
.O. Box 11289
Detroit MI 48211
Electronically submit, mail, fax
or email completed forms and
required documentation with
itemized invoices to:
Reservation Application
Final Application
Fill out this side when reserving incentives
Fill out this side when project is completed
Required Attachment
Required Attachments
Customer Information . . . . . . . . . . . . . . . . . . . . . . . . . 3
Customer Information . . . . . . . . . . . . . . . . . . . . . . . . . 3
Contractor Information . . . . . . . . . . . . . . . . . . . . . . . . 4
Contractor Information . . . . . . . . . . . . . . . . . . . . . . . . 4
W9 Tax Information Form (customer). . . . . . . . . . . . 3
W9 Tax Information Form (if different than customer). 4
Michigan-Made Affidavit(s)*
3rd Party Payment Authorization*. . . . . . . . . . . . . . . 4
NOTE: Some Prescriptive incentives and all Custom
incentives require a Reservation Application prior to
beginning your project.
Signed Final Application Agreement. . . . . . . . . . . . . 5
Manufacturers’ Specifications
Itemized Invoices
Michigan-Made Affidavit(s)*
Incentives Worksheets
Incentives Worksheets
Lighting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Lighting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
HVAC – Electric. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
HVAC – Electric. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Miscellaneous Electric. . . . . . . . . . . . . . . . . . . . . . . . 17
Miscellaneous Electric. . . . . . . . . . . . . . . . . . . . . . . . 17
Process Electric. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Process Electric. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Food Service – Electric. . . . . . . . . . . . . . . . . . . . . . . . 20
Food Service – Electric. . . . . . . . . . . . . . . . . . . . . . . . 20
HVAC – Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
HVAC – Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Hot Water & Laundry. . . . . . . . . . . . . . . . . . . . . . . . . 23
Hot Water & Laundry. . . . . . . . . . . . . . . . . . . . . . . . . 23
Insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Process Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Process Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Boiler/Furnace Tune-up . . . . . . . . . . . . . . . . . . . . . . 25
Boiler/Furnace Tune-up . . . . . . . . . . . . . . . . . . . . . . 25
Food Service – Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Food Service – Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Custom. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Custom. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Boiler/Furnace Tune-up Addendum. . . . . . . . . . . . 32
Boiler/Furnace Tune-up Addendum. . . . . . . . . . . . 32
* If applicable.
Reservation Application Date
Final Application Date
Expected Completion Date**
Actual Completion Date***
** Project funds will only be reserved to the date specified on the
Reservation Letter or Nov. 30, 2016, whichever comes first.
***Application must be submitted within 60 days of completion date
or by Nov. 30, 2016, whichever comes first.
This interactive Application will automatically calculate all incentive totals on each worksheet – which you can then submit
electronically to our office. You also can download this Application, print it out and complete it manually. You then can either
mail or fax it to our office.
You must complete all applicable pages before sending or submitting this Application to our office.
Go To Page 36 For Submission Instructions
dteenergy.com/savenow
2
V1:11/01/15
Important: Please read the terms and conditions on the Final Application Agreement before signing and submitting this Application.
You must complete ALL information requested below and provide the required additional documentation to avoid delays in reservation
or payment processing.
Customer
Who should we call with questions on the Application?
Mailing
How did you learn about this Incentive Program?
Bill Insert
Trade Ally/Contractor
Contractor
Meeting
Email
Print/TV Advertising
Customer Information
Primary Building Type (please select one)
Website
Other_____________
Account Manager_ Michigan Saves
Primary Industry (if not defined by building type)
Assembly
Fast Food Restaurant
Light Industry
Agriculture
Auto
Small Retail
Full Service Restaurant
Heavy Industry
Petro R/P
Government
Big Box Retail
Hospital
Warehouse
Steel Primary Metals
Real Estate
School (K-12)
Hotel
Miscellaneous
Mining/Construction
Services
College/University
Small Office
Trans./Comm./Utility
Wholesale
Grocery
Large Office
This Program is not available to DTE Energy business customers in multifamily buildings consisting of five or
more units per building. These customers may be eligible to participate in the Multifamily Program for energy saving
upgrades to both tenant and common areas.
Name of Applicant’s Business
Natural Gas Provider
Electricity Provider
DTE Energy
DTE Energy
Project or Building Name (If Applicable)
Consumers Energy
Consumers Energy
Other________________________
Other________________________
DTE Energy Gas Account Number (at Project location)
DTE Energy Electric Account Number (at Project location)
Name as it appears on DTE Energy bill
Name of Contact Person
Title of Contact Person
Contact Phone #
Contact Fax #
Contact Email Address
Mailing Address
City
State
ZIP
Installation Address
City
State
ZIP
Customer Tax Information (as entered on W9)
Tax Status:
Limited Liability Company
Corporation (Inc., PC, Etc.)
Tax-Exempt
Partnership
Individual
Other (may receive 1099)
Tax ID Number: Depending on tax status please provide EITHER your EIN/Federal Tax ID or Social Security Number below:
EIN/Federal Tax ID
–
dteenergy.com/savenow
OR
3
Social Security Number
–
–
V1:11/01/15
Customer
Information
Incentive Application
Incentive Application (continued)
Application
Primary Contractor/Distributor Information
Name of Company
Trade Ally #
Name of Contact Person
Title of Contact Person
Contact Phone #
Contact Fax #
Contact Email Address
Mailing Address
City
State
ZIP
Optional Third Party Payment Authorization
IMPORTANT NOTES:
1. Complete the section below ONLY if the incentive payment is to be paid to a SINGLE entity other than the DTE Account Holder.
2. Do NOT use the section below, if payments are to be made to MORE than a single third-party.
3. For payments being made to two or more third parties, please check this box , request a copy of the Third Party Addendum,
have it signed by the DTE Account Holder and attach it to this Final Application.
I am authorizing the payment of the incentive to the third party named below and I understand that I will not be receiving the incentive
payment. I also understand that my release of the payment to a third party does not exempt me from the Program requirements outlined
in the Measure Specifications, Final Application Agreement and Policies and Procedures Manual.
Authorized by (print name)
Title
Phone #
E-mail
DTE Account Holder Signature
Date
Check should be made payable to:
Payee: Company/Individual Name
Mailing Address
City
StateZIP
Contact Phone Number
Payee Tax Information (as entered on W9)
Tax Status:
Limited Liability Company
Corporation (Inc., PC, Etc.)
Tax-Exempt
Partnership
Individual
Other (may receive 1099)
Tax ID Number: Depending on tax status please provide EITHER your EIN/Federal Tax ID or Social Security Number below:
EIN/Federal Tax ID
–
dteenergy.com/savenow
Social Security Number
OR
4
–
–
V1:11/01/15
Final Application Agreement
I understand that in the event this Application received a reservation, that reservation is not a guarantee of payment. Incentive payment
will be based upon the Final Application meeting the Program terms and conditions, and the availability of funds.
Selected terms and conditions include:
1. Final Applications and all required documentation must be received within 60 days of project completion or by Nov. 30, 2016,
whichever comes first. Incomplete Applications, missing documents or Applications submitted after that date will result in the
project being cancelled.
2. The Program has a limited budget. Applications will be processed until allocated funds are reserved or spent.
3. All equipment must be purchased and installed prior to submitting the Final Application.
4. Applicant agrees to inspection and measurement activities by DTE Energy or its representative of both project payment and
equipment installation for up to five years from the date of equipment installation.
5. Incentives may be taxable and the Applicant is solely responsible for the payment of any resulting taxes. Incentives will be
reported to the IRS, unless the Applicant is exempt.
6. The Applicant may be required to refund some or all of the incentives if the measures do not remain (or were not) installed for a
period of five (5) years or the end of the product life, whichever is less.
7. Materials removed, including lamps and PCB ballasts, must be permanently taken out of service and disposed of in accordance
with federal and state laws or regulation and local codes and ordinances. The Applicant is responsible for being aware of any
applicable codes or ordinances. Information about hazardous waste disposal can be found at www.epa.gov/wastes.
8. For certain measures, the incentive amount will be determined based on the estimated energy savings. The Applicant may be
required to provide documentation on energy savings calculations and assumptions. DTE Energy will make the final determination
of the energy savings and thus the incentive amount to be paid.
9. DTE Energy has no obligations regarding and does not endorse or guarantee any claims, promises, work or equipment made,
performed or furnished by any contractors or equipment vendors that sell or install any energy efficiency measures.
10.Payment of incentives under the Program and/or evaluation of Applications for incentives shall not deem DTE Energy or any
of its affiliates, employees or agents (“DTE Energy Parties”) to be responsible for any work completed in connection herewith.
Applicant fully releases DTE Energy Parties from any and all claims it may have against DTE Energy Parties in connection with
this Application, the incentives or the work performed in connection with them. In addition, Applicant agrees to defend, indemnify
and hold DTE Energy Parties harmless from and against any and all claims, losses, demands or lawsuits by any third parties arising
in connection with this Application, the payment or nonpayment of incentives or any work performed in connection with them.
11.DTE Energy reserves the right to associate with your business and participation in the incentive Program for promotion and
advertising purposes. See the Policies and Procedures Manual for more on promotional co-branding
12.Applicant acknowledges that Federal Energy Regulatory Commission (FERC) Order issued on June 1, 2012, at Docket No. ER114081-000 (“FERC Order”) approves of the inclusion of energy efficiency resources as planning resources in a utility’s resource
adequacy plan (all italicized terms as defined in the FERC Order). Accordingly, Applicant and DTE Energy agree that all such
rights afforded with respect to energy efficiency resources, including but not limited to the right to identify them as a planning
resource so as to include them in a resource adequacy plan, shall inure exclusively and fully to DTE Energy. Applicant agrees that
it will not claim ownership in such energy efficiency resources for purposes of identifying them as a planning resource in accord
with the FERC Order or include them in a resource adequacy plan.
I have read and understand the measure specifications and Program Guidelines set forth in the Application and the Program Policy and
Procedures Manual and agree to abide by those requirements. Furthermore, I concur that I must meet all eligibility criteria in order to be
paid under this Program and not receive incentives from any other utility for the same project.
I certify that the information on this Application is true and accurate. I acknowledge and understand that it is necessary for DTE Energy
to store, use and share the information contained in this Application, as well as information collected in connection with this project,
including but not limited to my business name, address, account number and energy consumption data (“Customer Data”) for various
purposes. Therefore, I hereby authorize DTE Energy to collect, store and use the Customer Data for internal purposes and to present me
with other energy saving opportunities. I further authorize DTE Energy to share the Customer Data with third party vendors/contractors
who are doing work on DTE Energy’s behalf.
dteenergy.com/savenow
5
V1:11/01/15
Final
Application
The energy optimization measures listed within are being/have been installed in a qualifying time frame, at a qualifying facility and are not for
resale. Additional Program terms and conditions can be found in the Policy and Procedures Manual available at dteenergy.com/savenow.
Application
Incentive Summary, Final Agreement Information
and Account Holder Signature Page
Measure Category
Prescriptive Total
(A)
Custom Total
(B)
Michigan-Made
Total
Multi-Measure
Total (A + B )
Multi-Measure
Percentage
C1
D1
D1
D2
D2
Lighting
HVAC – Electric
Misc. Electric
Process Electric
Food Service – Electric
HVAC – Gas
Hot Water & Laundry
Insulation
Process Gas
Boiler/Furnace Tune-Ups
Food Service – Gas
Subtotals
20% Multi-Measure Bonus
15% Michigan-Made Bonus
C2
C2
Incentive Subtotal
Other Special Offers
Other Special Offer – Code:
Other Special Offer – Code:
Other Special Offer – Code:
Total Incentives Requested
2. Total all categories and enter in D1
3. Then, calculate the percentage of each category against the total
(divide each category by D1). If no single category is more than
75% of the total, proceed to Step 4; otherwise enter $0 in D2
4. Multiply D1 by .20 and enter into D2 and again in D2 at the far right.
The figures in this table will self-populate in the electronic version of this
Application. In a paper version, the values must be entered manually.
• For the Michigan-Made bonus:
1. By category, enter only those incentives that meet the
Michigan-Made criteria and total (C1)
2. Then, multiply the total by .15 and enter into C2 and again
in C2 at the far right
Total all incentives in D1, D2 and C2 and enter in Incentives Subtotal.
Enter any other Program Special Offer bonuses where indicated (you
must attach the worksheet from each offer) and manually enter the
incentive value in the space(s) provided.
•For the Multiple-Measure bonus:
1. Subtotal each category (A+B)
BEFORE YOU SUBMIT: Review the summary above to ensure all incentive areas reflect the worksheets you’ve completed in this
Application. If you find a blank area that should be filled in, review that worksheet page.
Final Agreement Information and Account Holder Signature
DTE Project Number
Total Project Cost
Actual Completion Date
DTE Account Holder Name (print)
DTE Account Holder Title
DTE Account Holder Signature
Date
For Final Applications, sign and submit only after all equipment has been installed. A customer signature is required for payment. Signed
Applications received by fax or email will be treated the same as original Applications received by mail. See Page 36 for submission instructions.
By signing this form, I agree to all terms and conditions listed on page 5.
dteenergy.com/savenow
6
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Lighting Incentive Worksheet
Compact Fluorescents and LEDs (Incandescent/Halogen to CFL or LED)
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Equipment Type
Incentive
Unit
LF–1
CFL – Screw–in (≤ 31 Watts)
$0.75
Lamp
LF–2
CFL – Screw–in (> 31 Watts)
$5.00
Lamp
LF–3
CFL Reflector Flood Lamps
$5.00
Lamp
LF–4
Compact Fluorescent Fixture
$10.00
Fixture
LF–5
42W 8 Lamp High Bay Compact Fluorescent Fixture
$20.00
Fixture
LL–1
LED A–Line Lamps <19 watts
$5.00
Lamp
LL–2
LED A–Line Lamps ≥ 19 watts
$8.00
Lamp
LL–3
LED Recessed Down Lights
$8.00
Lamp
LL–4
LED MR16 Lamps
$6.00
Lamp
LL–5
LED PAR/BR/R Lamps
$8.00
Lamp
LL–6
LED Candelabra Lamps replacing Incandescent Candelabra
$5.00
Lamp
LL–7
LED Globe Lamps replacing Incandescent Globe
$6.00
Lamp
LL–8
LED A–line Lamps replacing CFL A–line
$0.75
Lamp
LL–9
LED PAR/BR/R Lamps replacing CFL PAR/BR/R lamp
$1.00
Lamp
LL–10
LED Recessed Down Lights replacing CFL Recessed Down Lights
$2.00
Lamp
# of Units
Total Incentive
Lighting
Ref #
Interior High Performance (HP) and Low Wattage (LW) 4–foot Linear Fluorescents. All lamps are 4ft unless otherwise stated.
Ref #
Equipment Type
LF–6
LW T8 (Lamps Only, 4ft Linear or U–Lamp) NOTE: Reservation
Application is required for all LW T8 lamp only projects.
Incentive
Unit
$1.00
Lamp
LF–7
1 Lamp HP T8, replacing T8/T12
$2.00
Fixture
LF–8
2 Lamp HP T8, replacing T8/T12
$3.00
Fixture
LF–9
3 Lamp HP T8, replacing T8/T12
$4.00
Fixture
LF–10
4 Lamp HP T8, replacing T8/T12
$5.00
Fixture
LF–11
1 Lamp LW HP T8, replacing T8/T12
$3.00
Fixture
LF–12
2 Lamp LW HP T8, replacing T8/T12
$5.00
Fixture
LF–13
3 Lamp LW HP T8, replacing T8/T12
$7.00
Fixture
LF–14
4 Lamp LW HP T8, replacing T8/T12
$9.00
Fixture
# of Units
Total Incentive
Qualifying lamps and ballasts can be found at www.cee1.org.
Interior Linear LED (Reservation Application Required)
Ref #
Brief Description of
Pre– and Post–Fixtures
Annual Hours
of Operation
(A)
# of Fixtures
(B)
Pre–Upgrade
kW/Fixture
(C)
Post–Upgrade
kW/Fixture
(D)
Total kWh Reduced
(A x B x (C – D) ) = (E)
Incentive
$/kWh
(F)
LL–11
$0.07
LL–12
$0.07
LL–13
$0.07
LL–14
$0.07
LL–15
$0.07
LL–16
$0.07
Michigan-Made
Total Incentive
(E x F)
All Measures
Subtotal Lighting Incentives – Page 1
dteenergy.com/savenow
7
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Lighting Incentive Worksheet (continued)
Lighting
Interior High–Intensity Discharge (HID) to Fluorescent Fixtures
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Ref #
Equipment Type
Incentive
Unit
LF–15
3 Lamp T5 HO, replacing 250W HID
$30.00
Fixture
LF–16
4 Lamp T5 HO, replacing 400W HID
$60.00
Fixture
LF–17
6 Lamp T5 HO, replacing 400W HID
$25.00
Fixture
LF–18
12 Lamp T5 HO, replacing 1000W HID (any combination of 12 lamps permitted)*
$100.00
Fixture
LF–19
4 Lamp 32W T8, replacing 250W HID
$45.00
Fixture
LF–20
6 Lamp 32W T8, replacing 400W HID
$65.00
Fixture
LF–21
8 Lamp 32W T8, replacing 400W HID
$45.00
Fixture
LF–22
16 Lamp 32W T8, replacing 1000W HID (any combination of 16 lamps permitted)*
$140.00
Fixture
LF–23
≤ 499W (magnetic ballast), replacing 400 to 800W Probe Start
$25.00
Fixture
LF–24
≤ 499W (electronic ballast), replacing 400 to 800W Probe Start
$40.00
Fixture
500 to 750W (magnetic ballast), replacing > 800W Probe Start
$45.00
Fixture
500 to 750W (electronic ballast), replacing > 800W Probe Start
$60.00
Fixture
LF–25
Pulse Start
Metal Halide
LF–26
# of Units
Total Incentive
*Reservation Application required
Interior LED or Induction High Bay (Reservation Application Required)
Pre–Upgrade
Ref #
Brief Description of
Existing Fixture Model
and New Fixture Model
Post–Upgrade
# of
# of Lamps/
Watts/
# of
# of Lamps/
Watts/
Fixtures (A)
Fixture
Fixture (B) Fixtures (C)
Fixture
Fixture (D)
Total Watts
Reduced (E) = Incentive/
(A x B) – (C x D)
kW
/ 1000
Reduced (F)
LL–17
$250.00
LL–18
$250.00
LL–19
$250.00
Total
Incentive
(E x F)
Exterior or Garage HID to LED/Induction Lighting Retrofit (annual operating hours less than 8,760)
Ref #
Equipment Type
Incentive
Unit
LL–20
LED or Induction replacing ≤ 175W HID
$20.00
Fixture
LL–21
LED or Induction replacing 176W to 250W HID
$35.00
Fixture
LL–22
LED or Induction replacing 251W to 400W HID
$55.00
Fixture
# of Units
Total Incentive
Exterior or Garage HID to LED/Induction Lighting Retrofit (annual operating hours equal to 8,760)
Ref #
Equipment Type
LL–23
LED or Induction replacing ≤ 175W HID
Incentive
Unit
$50.00
Fixture
LL–24
LED or Induction replacing 176W to 250W HID
$75.00
Fixture
LL–25
LED or Induction replacing 251W to 400W HID
$120.00
Fixture
# of Units
Total Incentive
Exterior HID to Linear Fluorescent (Reservation Application Required)
Pre–Upgrade
Ref #
Brief Description of
Existing Fixture Model
and New Fixture Model
Post–Upgrade
# of
# of Lamps/
Watts/
# of
# of Lamps/
Watts/
Fixtures (A)
Fixture
Fixture (B) Fixtures (C)
Fixture
Fixture (D)
Total Watts
Reduced (E) = Incentive/
(A x B) – (C x D)
kW
/ 1000
Reduced (F)
LF–27
$200.00
LF–28
$200.00
LF–29
$200.00
Michigan-Made
Total
Incentive
(E x F)
All Measures
Subtotal Lighting Incentives – Page 2
dteenergy.com/savenow
8
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Lighting Incentive Worksheet (continued)
Exterior High–Intensity Discharge (HID) replacements with CFLs
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Ref #
Equipment Type
Incentive
Unit
LL–26
Exterior CFL replacing up to 175W HID
$15.00
Fixture
LL–27
Exterior CFL replacing 176W to 250W HID
$22.50
Fixture
LL–28
Exterior CFL replacing 251W to 400W HID
$42.50
Fixture
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
Exit Sign Conversion
Ref #
Equipment Type
LL–29
LED Exit Signs Electronic Fixtures Retrofit or Replacement
Incentive
Unit
$12.50
Fixture
Traffic Signal Conversion
Ref #
Equipment Type
Incentive
Unit
LL–30
LED Auto Traffic Signals
$20.00
Signal
LL–31
LED Pedestrian Signals
$15.00
Signal
Controls
Ref #
LO–1
LO–2
Equipment Type
Interior Occupancy Sensors
≤ 500 Watts Controlled
Unit
$20.00
Sensor
$50.00
Sensor
LO–3
Interior Central Lighting Control ($0.06 per Sq. Ft.)
$600.00
10,000 Sq. Ft.
LO–4
Interior Switching Controls for Multilevel Lighting ($0.05 per Sq. Ft.)
$500.00
10,000 Sq. Ft.
LO–5
Interior Daylight Sensor Controls ($0.09 per Sq. Ft.)
$900.00
10,000 Sq. Ft.
LO–6
Combination Occupancy and
Daylight Sensor Controls
≤ 500 Watts Controlled
$25.00
Sensor
> 500 Watts Controlled
$65.00
Sensor
LO–17
> 500 Watts Controlled
Incentive
LO–8
Stairwell Bi–Level Lighting Controls (Reservation required)
$0.30
Watt Controlled
LO–9
Exterior HID Lighting Bi–level Control w/Override, 150W to 1000W HID
$50.00
Fixture
LO–10
Exterior Multi–Step Dimming Timing Controls
$0.06
Watt Controlled
NOTE: Incentives are available for only one lighting control measure for a given space.
Daylighting
Ref #
Equipment Type
LO–11
Tubular Skylights (Light Tubes)
Incentive
Unit
$35.00
Tube
Food Service Lighting
Ref #
Equipment Type
Incentive
Unit
LL–32
LED Refrigerated Case Door Lighting
$30.00
Door
LL–33
Occupancy Sensors for LED Refrigerated Case Lighting
$15.00
Door
NOTE: The incentives for LL–32 and LL–33 cannot be combined with incentives for Refrigeration savings due to lighting wattage reductions. (See Page 21).
De–lamping (Note: a Reservation Application is required for all De–lamping projects)
Ref #
Equipment Type
LO–12
T12 or T8 4ft Lamp Removal (combined with HPT8 or LWHPT8 ballast retrofit)
Incentive
Unit
$2.50
Lamp Removed
# of Units
Michigan-Made
Total Incentive
All Measures
Subtotal Lighting Incentives – Page 3
Total Lighting Incentives
dteenergy.com/savenow
9
V1:11/01/15
Lighting
# of Units
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC – Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Air Conditioning Systems and Heat Pumps
Size Category
Qualifying
Efficiency
HE–1
≤ 65,000 Btu/hr (5.4 tons) – 1 Phase
14.0 SEER
$10
HE–2
≤ 65,000 Btu/hr (5.4 tons) – 3 Phase
14.0 SEER
$10
HE–3
> 65,000 Btu/hr (5.4 tons),
≤ 135,000 Btu/hr (11.3 tons)
12.0 EER
$15
> 135,000 Btu/hr (11.3 tons),
≤ 240,000 Btu/hr (20 tons)
12.0 EER
$15
HE–5
> 240,000 Btu/hr (20 tons),
≤ 760,000 Btu/hr (63.3 tons)
10.8 EER
$10
HE–6
> 760,000 Btu/hr (63.3 tons)
10.2 EER
$10
HE–7
≤ 65,000 Btu/hr (5.4 tons) – 1 Phase
14.0 SEER
$20
HE–8
≤ 65,000 Btu/hr (5.4 tons) – 3 Phase
14.0 SEER
$10
> 65,000 Btu/hr (5.4 tons),
≤ 135,000 Btu/hr (11.3 tons)
11.5 EER
$20
HE–10
> 135,000 Btu/hr (11.3 tons),
≤ 240,000 Btu/hr (20 tons)
11.5 EER
$25
HE–11
> 240,000 Btu/hr (20 tons)
10.5 EER
$30
HE–12
≤ 17,000 Btu/hr (1.4 tons)
11.5 EER
$10
HE–13
> 17,000 Btu/hr (1.4 tons),
≤ 65,000 Btu/hr (5.4 tons)
12.3 EER
$8
> 65,000 Btu/hr (5.4 tons),
≤ 135,000 Btu/hr (11.3 tons)
12.3 EER
$8
≤ 14,000 Btu/hr (1.17 tons)
9.5 EER
N/A*
$10
> 14,000 Btu/hr (1.17 tons)
9.2 EER
N/A*
$25
Ref #
HVAC
Electric
HE–4
HE–9
Equipment Type
Unitary and Split
Air Conditioning Systems
Air Source Heat Pumps
Closed Loop Heat Pump
HE–14
HE–15
HE–16
Room Air Conditioners
Installed
Efficiency
Unit Size
(tons) (A)
Quantity (B)
Incentive
per unit (C )
HE–17
Package Terminal Air Conditioner
ALL
9.3 EER
$5
HE–18
Package Terminal Heat Pump
ALL
9.1 EER
$10
17 EER
$22.50
HE–19
HE–20
HE–21
HE–22
Ground-Source Heat Pump
Ground-Source Heat Pump (replacing
Air Source Heat Pump)
≤ 135,000 Btu/hr (11.3 tons)
≤ 135,000 Btu/hr (11.3 tons)
19 EER
$30
17 EER
$150
19 EER
$175
Incentive
(A*B*C)
* Incentive is per Unit
Select the HVAC system in operation at the project site (ask your contractor for assistance)
AC with gas heat
CV reheat no econ with Gas Engine Chiller
PTAC-HP
Air source heat pump
CV reheat no econ with Water Cooled Chiller
Refrigeration
CV reheat econ with Air Cooled Chiller
Gas heat only
VAV reheat econ with Air Cooled Chiller
CV reheat econ with Gas Engine Chiller
Ground source heat pump
VAV reheat econ with Gas Engine Chiller
CV reheat econ with Water Cooled Chiller
MZS no econ with Air Cooled Chiller
VAV reheat econ with Water Cooled Chiller
CV reheat no econ with Air Cooled Chiller
PTAC
Water loop heat pump
Michigan-Made
All Measures
Subtotal HVAC – Electric Incentives – Page 1
dteenergy.com/savenow
10
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC – Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
HVAC Controls
Ref #
Measure Name
Size
Incentive
HE–23
Programmable Thermostat (Air Conditioning)
ALL
$20.00
Thermostat
HE–24
Chilled Water Reset with Pump on/off Control
ALL
$5.00
1,000 Sq. Ft.
HE–25
Setback-Setup Controls (Air Conditioning)
HE–26
Unit
ALL
$18.00
1,000 Sq. Ft.
Air Conditioning, Electric Heat
ALL
$30.00
Room
Air Conditioning, Gas Heat
ALL
$15.00
Room
ALL
$25.00
1,000 Sq. Ft.
HE–27
Hotel Guestroom Energy
Management Control
HE–28
Web enabled EMS (Electric) (Reservation required)
≤ 100 tons
$1.00
Ton
HE–30
> 100 tons, ≤ 200 tons
$1.00
Ton
HE–31
> 200 tons, ≤ 300 tons
$1.00
Ton
HE–32
> 300 tons, ≤ 400 tons
$1.00
Ton
HE–33
> 400 tons, ≤ 500 tons
$1.00
Ton
HE–34
≤ 1,000 tons
$1.00
Ton
> 1,000 tons, ≤ 2,000 tons
$0.50
Ton
> 2,000 tons, ≤ 3,000 tons
$0.50
Ton
HE–35
Chilled Water Reset – Air Cooled
Chilled Water Reset – Water Cooled
HE–36
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
HVAC
Electric
HE–29
# of Units
HVAC Occupancy Sensor for Large Office Building
Ref #
Measure Name
Size
Incentive
Unit
HE–37
With CV Chilled Water System
ALL
$30.00
1,000 Sq. Ft.
HE–38
With VAV Chilled Water System
ALL
$5.00
1,000 Sq. Ft.
Other HVAC
Ref #
Measure Name
Size
Incentive
Unit
HE–39
Variable Frequency Drive – VAV Supply or Return Air Fan
ALL
$50.00
Fan HP
HE–40
Variable Frequency Drive – Secondary Chilled Water Pump
ALL
$50.00
Pump HP
HE–41
Economizer
ALL
$8.00
Ton
HE–42
Cool Roof ($0.02 per Sq. Ft.)
ALL
$20.00
1,000 Sq. Ft. Roof Area
HE–43
High Performance Glazing in Windows ($0.30 per Sq.Ft.)
ALL
$30.00
100 Sq.Ft. of Glazing
HE–44
Window Film ($0.30 per Sq. Ft.)
ALL
$30.00
100 Sq. Ft. of Film
HE–45
EC Motors on Small Commercial Furnaces replacing non–EC Motors
ALL
$90.00
HP
HE–46
Efficient Chilled Water Pump
ALL
$35.00
HP
HE–47
Efficient Hot Water Pump
ALL
$35.00
HP
Reference numbers highlighted in orange denote measures that appear in both the Gas and Electric section of the Program, which means they may qualify for the Multi-Measure Bonus.
To receive the bonus, submit both the Electric and Gas measure on the same Application.
Michigan-Made
All Measures
Subtotal HVAC – Electric Incentives – Page 2
dteenergy.com/savenow
11
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC – Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
HVAC
Electric
Tune-up Checklist
Site Name
Date of Tune-up
Manufacturer
Type (Ref. Charge/DX coil/Chiller)
Model Number
Annual Hours of Operation
Serial Number
Unit Size (Tons)
Company Performing Tune-up
Technician Performing Tune-up
Refrigerant Charging Correction on RTU AC
Unit must meet minimum efficiency per ASHRAE 90.1 2007, Table 6.8.1a (see appendix in Program Catalog)
Unit rated charge
(psig)
Efficiency of unit
(EER/SEER)
Charge unit adjusted
to (psig +/- 20% of
rated charge)
Unit existing charge
(psig)
DX Condenser Coil Cleaning
Airflow Readings Before Cleaning (CFM)
Airflow Readings After Cleaning (CFM)
Average of all readings: __________________
Average of all readings: __________________
Chiller Tune-Up (check one)
Space Cooling Process Cooling
Inspect and correct oil level and pressure at
full load operation
Clean the air-cooled condenser coil
Check and adjust the system pressure
Inspect and/or replace filter
Inspect and/or replace belt
Check and repair the electrical contactors
Check refrigerant temperature and pressure
Validate high pressure controls
Clean water cooled chiller condenser tubes
Check and repair economizer operation
Check suction pressure and temp
Validate suction temperature and pressure
Validate low-pressure controls
Patch and wash coat as required
Validate crankcase heater operation
Check for proper venting
Clean water cooled chiller evaporator tubes
(If performance warrants)
Check and repair evaporator condition
Validate sub-cooling and superheat
Validate compressor amp draw
Inspect all refractory
Validate supply motor amp draw
Check safety controls
Validate condenser fan(s) amp draw
Lubricate all motors and Check coupling
alignment
Check liquid line temperature
HVAC Tune–ups
Ref #
Equipment Type
Incentive
Unit
HE–48
HE–49
Refrigerant charging correction on RTU AC
$3.00
Ton
DX Condenser Coil Cleaning
$3.00
Ton
HE–50
Chiller Tuneup
$3.00
Ton
# of Units
Total Incentive
Michigan-Made
All Measures
Subtotal HVAC – Electric Incentives – Page 3
dteenergy.com/savenow
12
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC – Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Air-Cooled Chillers
Ref #
Equipment Type
Qualifying
Full Load
Efficiency
(kW/ton)
Input
Full Load
Efficiency
(kW/ton)
CH–1
Qualifying
IPLV
(kW/ton)
Installed IPLV
(kW/ton)
Unit Size
(tons) (A)
Quantity (B)
Incentive
(per ton) (C )
$25
0.90
$25
CH–3
0.83
$25
CH–4
1.05
$25
0.94
$25
0.82
$25
CH–7
0.75
$25
CH–8
0.96
$25
1.26
CH–5
CH–6
Reciprocating Chiller
CH–9
1.14
0.86
$25
0.75
$25
CH–11
0.69
$25
CH–12
1.02
$25
1.05
CH–10
CH–13
0.97
$25
CH–14
0.74
$25
CH–15
1.05
$25
CH–16
0.93
$25
CH–17
1.26
Screw or Scroll Chiller
1.14
0.88
$25
CH–18
0.67
$25
CH–19
0.96
$25
CH–20
0.85
$25
0.80
$25
0.62
$25
CH–21
1.05
CH–22
HVAC
Electric
1.03
CH–2
Incentive
(A*B*C)
NOTE: NOTE: kW/ton = 12 ÷ EER, kW/ton = 3.517 ÷ COP.
Michigan-Made
All Measures
Subtotal HVAC – Electric Incentives – Page 4
dteenergy.com/savenow
13
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC – Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Water-Cooled Chillers – Centrifugal Chiller
Ref #
Capacity (A)
Qualifying Full
Load Efficiency
(kW/ton)
Installed Full
Load Efficiency
(kW/ton)
CH–23
CH–24
Installed IPLV
(kW/ton)
Unit Size (tons)
(A)
Quantity (B)
Incentive
(per ton) (C )
0.34
$45
0.4
$40
0.43
$35
CH–26
0.46
$30
CH–27
0.53
$25
CH–28
0.38
$30
CH–29
0.45
$25
0.48
$20
CH–31
0.51
$15
CH–32
0.6
$10
CH–33
0.42
$20
0.5
$15
0.53
$10
0.56
CH–25
HVAC
Electric
Qualifying
IPLV (kW/
ton)
CH–30
< 150 tons
CH–34
0.63
0.7
CH–35
CH–36
0.57
$5
CH–37
0.3
$45
0.36
$40
0.39
$35
CH–40
0.41
$30
CH–41
0.48
$25
CH–42
0.34
$30
CH–43
0.4
$25
0.43
$20
CH–45
0.46
$15
CH–46
0.54
$10
CH–47
0.38
$20
0.45
$15
0.48
$10
CH–38
0.51
CH–39
CH–44
150 – 300 tons
CH–48
0.57
0.63
CH–49
CH–50
0.51
$5
CH–51
0.28
$45
0.33
$40
0.35
$35
CH–54
0.37
$30
CH–55
0.44
$25
CH–56
0.31
$30
CH–57
0.37
$25
0.39
$20
CH–59
0.42
$15
CH–60
0.49
$10
CH–61
0.35
$20
0.41
$15
0.44
$10
0.47
$5
CH–52
0.46
CH–53
CH–58
> 300 tons
CH–62
CH–63
0.52
0.58
CH–64
NOTE: NOTE: kW/ton = 12 ÷ EER, kW/ton = 3.517 ÷ COP.
Michigan-Made
Incentive
(A*B*C)
All Measures
Subtotal HVAC – Electric Incentives – Page 5
dteenergy.com/savenow
14
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC – Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Water-Cooled Chillers – Screw or Scroll Chiller
Ref #
Capacity (A)
Qualifying Full
Load Efficiency
(kW/ton)
Installed Full
Load Efficiency
(kW/ton)
Qualifying
IPLV (kW/
ton)
Installed IPLV
(kW/ton)
Unit Size (tons)
(A)
Quantity (B)
Incentive
(per ton) (C )
CH–65
0.38
$50
CH–66
0.41
$45
CH–67
0.44
$40
0.63
CH–68
$35
0.5
$30
CH–70
0.56
$25
CH–71
0.43
$40
CH–72
0.46
$35
CH–73
< 150 tons
0.5
$30
0.53
$25
CH–75
0.56
$20
CH–76
0.63
$15
CH–77
0.47
$30
0.51
$25
0.55
$20
CH–80
0.59
$15
CH–81
0.62
$10
CH–82
0.34
$50
CH–83
0.37
$45
CH–84
0.4
$40
CH–74
0.71
CH–78
0.79
CH–79
0.57
CH–85
0.43
$35
CH–86
0.45
$30
CH–87
0.51
$25
CH–88
0.39
$40
CH–89
0.42
$35
0.45
$30
0.48
$25
CH–92
0.51
$20
CH–93
0.57
$15
CH–94
0.43
$30
0.47
$25
0.5
$20
CH–97
0.54
$15
CH–98
0.57
$10
CH–90
150 – 300 tons
CH–91
0.65
CH–95
CH–96
0.72
HVAC
Electric
0.47
CH–69
Incentive
(A*B*C)
NOTE: NOTE: kW/ton = 12 ÷ EER, kW/ton = 3.517 ÷ COP.
Michigan-Made
All Measures
Subtotal HVAC – Electric Incentives – Page 6
dteenergy.com/savenow
15
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC – Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Water-Cooled Chillers – Screw or Scroll Chiller (Continued)
Ref #
Capacity (A)
Qualifying Full
Load Efficiency
(kW/ton)
Qualifying
IPLV (kW/
ton)
Installed IPLV
(kW/ton)
Unit Size (tons)
(A)
Quantity (B)
Incentive
(per ton) (C )
CH–99
0.31
$50
CH–100
0.33
$45
0.36
$40
CH–101
0.51
CH–102
HVAC
Electric
Installed Full
Load Efficiency
(kW/ton)
0.38
$35
CH–103
0.4
$30
CH–104
0.46
$25
CH–105
0.35
$40
CH–106
0.37
$35
0.4
$30
0.43
$25
CH–109
0.45
$20
CH–110
0.51
$15
CH–111
0.38
$30
CH–112
0.42
$25
0.45
$20
CH–114
0.48
$15
CH–115
0.51
$10
CH–107
> 300 tons
CH–108
CH–113
0.58
0.64
Incentive
(A*B*C)
NOTE: NOTE: kW/ton = 12 ÷ EER, kW/ton = 3.517 ÷ COP.
Michigan-Made
All Measures
Subtotal HVAC – Electric Incentives – Page 7
Total HVAC – Electric Incentives
dteenergy.com/savenow
16
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Miscellaneous Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Sensors and Controls
Ref #
Equipment Type
Incentive
Unit
ME–1
Intelligent Multi-Socket Surge Protector
$5.00
Protector
ME–2
PC Network Energy Management Controls
$5.00
PC
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
Clothes Washers
Ref #
ME–3
ME–4
Equipment Type
High Efficiency Clothes Washer
Incentive
Unit
Electric Water Heat, Electric Dryer
$50.00
Washer
Electric Water Heat, Gas Dryer
$50.00
Washer
Miscellaneous Electric
Equipment Type
Heat Pump Storage Water Heater
Incentive
Unit
$350.00
Heater
Michigan-Made
All Measures
Total Miscellaneous Electric Incentives
dteenergy.com/savenow
17
V1:11/01/15
Misc.
Electric
Ref #
ME–5
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Process Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
High Efficiency Pumps
Ref #
Equipment Type (A)
Incentive (B)
Incentive Unit
PE–1
PE–2
1.5 HP
$20.00
HP
2 HP
$20.00
HP
PE–3
3 HP
$20.00
HP
PE–4
5 HP
$20.00
HP
PE–5
7.5 HP
$20.00
HP
PE–6
10 HP
$20.00
HP
PE–7
15 HP
$20.00
HP
PE–8
20 HP
$20.00
HP
# of Pumps (C)
Total HP (A x C)
Total Incentive
(A x B x C)
# of Pumps (C)
Total HP (A x C)
Total Incentive
(A x B x C)
# of Units
Total Incentive
Variable Frequency Drive for Process
Process
Electric
Ref #
Equipment Type
Size (A)
Incentive (B)
Incentive Unit
PE–9
1.5 HP
$50.00
HP
PE–10
2 HP
$50.00
HP
PE–11
3 HP
$50.00
HP
PE–12
5 HP
$50.00
HP
PE–13
7.5 HP
$50.00
HP
PE–14
10 HP
$50.00
HP
PE–15
Process Pumps
15 HP
$50.00
HP
PE–16
20 HP
$50.00
HP
PE–17
25 HP
$50.00
HP
PE–18
30 HP
$50.00
HP
PE–19
40 HP
$50.00
HP
PE–20
50 HP
$50.00
HP
PE–21
Process Fans (≤ 50 HP)
$30.00
HP
PE–22
VFD on Computer Room
AC Supply Fans
$150.00
HP
Compressed Air
Ref #
Equipment Type
Incentive
Unit
CA–23
CA–24
Compressed Air Engineered Nozzle
$50.00
Nozzle
Compressed Air Pressure Flow Controller – Reservation Application Required
$4.00
HP
CA–25
Compressed Air Audit with Leak Repair – Reservation Application Required
prior to leak repair
$35.00
SCFM
CA–26
VSD Air Compressor
$80.00
HP
CA–27
CA–28
Efficient Compressed Air Dryers
CA–29
Refrigerated Cycling Thermal Mass
$0.30
SCFM
Refrigerated Variable Speed Compressor
$1.00
SCFM
$1.00
SCFM
CA–30
Refrigerated Air Dryer replacing Desiccant Air Dryer
Refrigerated Digital Scroll
$30.00
SCFM
CA–31
No–Loss Condensate Drains on Air Compressors
$140.00
Drain
CA–32
Compressed Air Storage Tank
$25.00
HP
Michigan-Made
All Measures
Subtotal Process Electric Incentives – Page 1
dteenergy.com/savenow
18
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Process Electric Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Miscellaneous Process
Ref #
Equipment Type
PE–23
PE–24
Industrial 3-Phase HF Battery Charger
PE–25
PE–26
PE–27
Electrically Commutated Plug Fans
Incentive
Unit
1-shift operation
$85.00
Charger
2-shift operation
$160.00
Charger
3-shift operation
$220.00
Charger
In-Cabinet
$65.00
Fan
Under-Cabinet
$110.00
Fan
PE-28
PE-29
Computer Room Air Conditioning
(CRAC) Units
<65 MBH
SCOP: 2.86
$10.00
Output MBH
65-240 MBH
SCOP: 2.73
$11.00
Output MBH
>240 MBH
SCOP: 2.47
PE-30
Output MBH
Square Foot
3" diameter
$10.00
Linear foot
4" diameter
$15.00
Linear foot
5" diameter
$20.00
Linear foot
PE–35
6" diameter
$25.00
Linear foot
PE–36
8" diameter
$30.00
Linear foot
Low Temp (120°F – 170°F)
$1.00
Square foot
High Temp (> 170°F)
$1.50
Square foot
Low Temp (120°F – 170°F)
$1.00
Square foot
High Temp (> 170°F)
$2.00
Square foot
Barrel Wraps for Injection Molders & Extruders
PE–32
PE–33
PE–34
PE–37
PE–38
PE–39
PE–40
Insulated Pellet Dryer Ducts
Tank Insulation – 1”
Tank Insulation – 2”
PE–41
Electric Motors replacing Pneumatic (Air) Motors
$90.00
HP
PE–42
High Efficiency Welders (Reservation required)
$50.00
Welder
Total Incentive
Process
Electric
$12.00
$25.00
PE–31
# of Units
Michigan-Made
All Measures
Subtotal Process Electric Incentives – Page 2
Total Process Electric Incentives
dteenergy.com/savenow
19
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Food Service – Electric and Refrigeration
Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
ENERGY STAR® Commercial Solid Door Refrigerators and Freezers
Ref #
Equipment Type
Size
Incentive
Unit
< 15 cu ft
$75.00
Refrigerator
15 – 30 cu ft
$100.00
Refrigerator
31 – 50 cu ft
$150.00
Refrigerator
FE–4
> 50 cu ft
$200.00
Refrigerator
FE–5
< 15 cu ft
$75.00
Freezer
15 – 30 cu ft
$100.00
Freezer
31 – 50 cu ft
$150.00
Freezer
> 50 cu ft
$200.00
Freezer
FE–1
FE–2
FE–3
FE–6
FE–7
Refrigerators
Freezers
FE–8
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
ENERGY STAR® Steam Cookers and Hot Holding Cabinets
Ref #
Equipment Type
Type
Incentive
Unit
3 Pan
$450.00
Cooker
4 Pan
$600.00
Cooker
5 Pan
$750.00
Cooker
FE–12
6 Pan
$900.00
Cooker
FE–13
Half Size
$300.00
Cabinet
Three Quarter Size
$400.00
Cabinet
Full Size
$600.00
Cabinet
Incentive
Unit
FE–9
FE–10
Food Service
– Electric
FE–11
FE–14
Steam Cookers
Hot Holding Cabinets
FE–15
Controls
Ref #
Equipment Type
FE–16
Beverage Vending Machine Controllers
$50.00
Controller
FE–17
Anti-Sweat Heater Controls
$50.00
Door
FE–18
Floating Head Pressure Controls
$20.00
Ton
Energy Efficient Ice Machines
Ref #
Equipment Type
Incentive
Unit
FE–19
< 500 lbs
$150.00
Machine
FE–20
500 to 1,000 lbs
$250.00
Machine
FE–21
> 1,000 lbs
$500.00
Machine
Michigan-Made
All Measures
Subtotal Food Service – Electric and Refrigeration Incentives – Page 1
dteenergy.com/savenow
20
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Food Service – Electric and Refrigeration
Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Refrigeration
Ref #
Equipment Type
Incentive
Unit
FE–22
Efficient Refrigeration Condenser
$100.00
Ton
FE–23
ECM Motor for Reach-in Refrigerated Display Case
$60.00
Motor
FE–24
ECM Motor for Walk-in Cooler and Freezer
$80.00
Motor
FE–25
Evaporator Fan Motor Control on ECM Motors for Walk-in Coolers and Freezers
$30.00
Controller
FE–26
Evaporator Fan Motor Control on PSC Motors for Walk-in Coolers and Freezers
$30.00
Controller
FE–27
Walk–in Cooler/Freezer Evaporator Fan Motor Reduction (Reservation required)
$100.00
Motor Removed
FE–28
Night Covers (Vertical)*
$1.25
Linear Foot x Hrs/Day
FE–29
Strip Curtains on Walk-in Cooler Doors
$3.00
Square Foot
FE–30
Strip Curtains on Walk-in Freezer Doors
$15.00
Square Foot
FE–31
Door Gaskets on Coolers and Freezers
$2.50
Linear Foot
FE–32
Automatic Door Closers for Refrigerated Walk–in Coolers/Freezers Doors
(Reservation required)
$50.00
Door
Medium Temp
$40.00
Linear Foot
Low Temp
$100.00
Linear Foot
FE–33
FE–34
Reach–in Refrigerated Display Case Door Retrofit
(Reservation required)
# of Units
Ft.
Total Incentive
Hrs.
Food Service
– Electric
* To calculate night cover incentive, multiply incentive x linear ft x hrs that night cover is used per day
Food Service Lighting
Ref #
Equipment Type
FE–35
FE–36
Refrigerated Savings due to Lighting Savings
FE–37
Incentive
Unit
-20°F to 0°F
$0.15
Lighting watt reduced
0°F to 20°F
$0.10
Lighting watt reduced
20°F to 40°F
$0.07
Lighting watt reduced
# of Units
Total Incentive
NOTE: These food service lighting incentives due to wattage reductions cannot be combined with incentives for Food Service Lighting on Page 9.
These lighting measures can be found on Page 9:
Ref #
Equipment Type
Incentive
Unit
LO–15
LO–16
LED Refrigerated Door Case Lighting
$30.00
Door
Occupancy Sensors for LED Refrigerated Case Lighting
$15.00
Door
Reference numbers highlighted in orange denote measures that appear in both the Gas and Electric section of the Program, which means they may qualify for the Multi-Measure Bonus.
To receive the bonus, submit both the Electric and Gas measure on the same Application.
Michigan-Made
All Measures
Subtotal Food Service – Electric and Refrigeration Incentives – Page 2
Total Food Service – Electric and Refrigeration Incentives
dteenergy.com/savenow
21
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
HVAC Gas Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Boilers and Furnaces
Ref #
Equipment Size
Output MBH
Equipment Type
HG–1
Boiler Modulating Burner Control Retrofit
HG–2
Boiler Water Reset Control Retrofit
HG–3
HG–4
High Efficiency Furnace/ Unit
Heater
HG–5
High Efficiency Boilers (Space Heating)
HG–6
Leaking Steam Trap Repair or Replacement
Incentive
Unit
$1,250.00
Boiler
$0.50
Input MBH
95% Efficient
$350.00
Furnace
92% Efficient
$250.00
Furnace
$1.00
Input MBH
$100.00
Trap
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
Other HVAC
Ref #
Equipment Type
Incentive
Unit
HG–7
Infrared Heaters
$4.00
Input MBH
HG–8
Variable Frequency Drive on Secondary Chilled Water Pump
$2.00
Pump HP
HG–9
Destratification Fans (Reservation Application Required)
$35.00
1,000 Sq. Ft.
HG–10
Direct Fired Make-Up Air Units
$1.00
Input MBH
HG–11
Outside Air Ventilation Reduction (Reservation Application Required)
$1.00
CFM Reduced
Incentive
Unit
HVAC
Gas
HVAC Controls
Ref #
Equipment Type
HG–12
Programmable Thermostat (Gas Heat)
$50.00
Thermostat
HG–13
Chilled Water Reset with Pump on/off Control ($0.005 per Sq. Ft.)
$5.00
1,000 Sq. Ft.
HG–14
Setback/Setup Controls (Gas Heat)
$45.00
1,000 Sq. Ft.
HG–15
Demand Controlled Ventilation CO2 Sensor-based ($0.012 per Sq. Ft.)
$12.00
1,000 Sq. Ft.
HG–16
HG–17
HVAC Occupancy Sensor, Large Office Building
w/CV Chilled Water System
$20.00
1,000 Sq. Ft.
w/VAV Chilled Water System
$10.00
1,000 Sq. Ft.
HG–18
Hotel Guestroom Energy Management Control (Gas Heat)
$35.00
Room
HG–29
Web-enabled EMS (gas)
$100.00
1,000 Sq. Ft.
HG–20
Optimized Snow and Ice Melting Controls
$0.10
Square Foot
Reference numbers highlighted in orange denote measures that appear in both the Gas and Electric section of the Program, which means they may qualify for the Multi-Measure Bonus.
To receive the bonus, submit both the Electric and Gas measure on the same Application.
Select the HVAC system in operation at the project site (ask your contractor for assistance)
AC with gas heat
CV reheat no econ with Gas Engine Chiller
PTAC-HP
Air source heat pump
CV reheat no econ with Water Cooled Chiller
Refrigeration
CV reheat econ with Air Cooled Chiller
Gas heat only
VAV reheat econ with Air Cooled Chiller
CV reheat econ with Gas Engine Chiller
Ground source heat pump
VAV reheat econ with Gas Engine Chiller
CV reheat econ with Water Cooled Chiller
MZS no econ with Air Cooled Chiller
VAV reheat econ with Water Cooled Chiller
CV reheat no econ with Air Cooled Chiller
PTAC
Water loop heat pump
Michigan-Made
All Measures
Total HVAC – Gas Incentives
dteenergy.com/savenow
22
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Hot Water & Laundry Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Hot Water
Ref #
Equipment Type
WG–1
High Efficiency Indirect Domestic Hot Water Heating System 90% Efficient
WG–2
Mid Efficiency Indirect Domestic Hot Water Heating System 84% Efficient
WG–3
Gas Tankless Water Heater
WG–4
WG–5
WG–6
Incentive
Unit
$1.25
Input MBH
$0.75
Input MBH
$150.00
Heater
High Efficiency Pool Heater (gas heat)
$2.00
Input MBH
Low-Flow Sink Aerators (≤ 1.0 GPM on a gas hot water system)
$4.00
Aerator
Low-Flow Showerheads
$7.00
Showerhead
Incentive
Unit
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
Gas Storage Water Heater (≤55 Gallons)
Ref #
Equipment Type
WG–7
≤ 75,000 Btu/hr, Mid-Efficiency (≥ 0.67 EF)
$35.00
Heater
WG–8
≤ 75,000 Btu/hr, High-Efficiency (≥ 0.80 EF)
$45.00
Heater
Incentive
Unit
Gas Storage Water Heater (> 55 Gallons)
Ref #
Equipment Type
WG–9
≤ 75,000 Btu/hr, High-Efficiency (≥ 0.80 EF)
$85.00
Heater
$150.00
Heater
Incentive
Unit
Gas Water Heat, Electric Dryer
$25.00
Washer
Gas Water Heat, Gas Dryer
$50.00
Washer
$40.00
lb. Wash Capacity
WG–10 > 75,000 Btu/hr, High-Efficiency (≥ 0.94 Thermal Efficiency)
Laundry
Ref #
WG–11
WG–12
Equipment Type
High Efficiency Clothes Washer
WG–13 Ozone Laundry
Hot Water
& Laundry
Michigan-Made
All Measures
Total Hot Water & Laundry Incentives
dteenergy.com/savenow
23
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Insulation Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Pipe Wrap
Ref #
Equipment Type
Incentive
Unit
IG–1
Steam Boiler
$5.00
Linear Foot
IG–2
Steam Boiler Condensate Return
$2.00
Linear Foot
IG–3
Hot Water Boiler
$3.00
Linear Foot
IG–4
Domestic Hot Water
$1.00
Linear Foot
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
Greenhouse
Ref #
Equipment Type
Incentive
Unit
IG–5
Greenhouse Heat Curtain
$0.20
Square Foot
IG–6
Greenhouse Infrared Film
$0.10
Square Foot
Incentive
Unit
Loading Dock Seals
Ref #
Equipment Type
IG–7
Truck Loading Dock Seals (New Installation) (Reservation Application Required)
$200.00
Door
IG–8
Truck Loading Dock Seals (Replacement)
$100.00
Door
IG–9
Truck Loading Dock Leveler Ramp Air Pit Seals (New Installation)
$100.00
Ramp
Miscellaneous Gas
Ref #
Equipment Type
IG–10
Flat Roof Insulation ($ 0.05 per Sq. Ft.)
Incentive
Unit
$50.00
1,000 Sq. Ft.
IG–11
Attic Roof Insulation ($ 0.06 per Sq. Ft.)
$60.00
1,000 Sq. Ft.
IG–12
Wall Insulation (Reservation Application Required)
$450.00
1,000 Sq. Ft.
IG–13
Pool Covers
$0.50
Square Foot
Insulation
Process Gas
Process Gas Incentive Worksheet
Process Gas
Ref #
Equipment Type
PG–14
Furnace Tube Inserts
PG–15
PG–16
PG–17
PG–18
PG–19
PG–20
PG–21
High Efficiency Process Boiler
Tank Insulation – 1”
Tank Insulation – 2”
Incentive
Unit
$30.00
Insert
Water
$1.00
Input MBH
Steam
$1.00
Input MBH
Low Temp (120°F – 170°F)
$5.00
Square Foot
High Temp (> 170°F)
$9.00
Square Foot
Low Temp (120°F – 170°F)
$6.00
Square Foot
High Temp (> 170°F)
$10.00
Square Foot
$20.00
HP
Air Compressor Exhaust Heat Recovery (Reservation Application Required)
# of Units
Total Incentive
Michigan-Made
All Measures
Michigan-Made
All Measures
Total Insulation Incentives
Total Process Gas Incentives
dteenergy.com/savenow
24
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Boiler/Furnace Tune-Up Incentive Worksheet
Tune-up Checklist
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Check for proper venting
Adjust burner and gas input, manual or motorized draft controls
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Include a copy of the combustion analyzer post test (boilers only)
To enter additional Boiler/Furnace Tune-up information, enter the quantity(ies) below,
and then enter the information on the addendum, beginning on Page 32.
Boiler Tune-Up
Ref #
Space Heating Boiler Tune-Up
Incentive
Unit
HG–21
110 – 500 Input MBH
$100.00
Boiler
HG–22
501 – 1,200 Input MBH
$200.00
Boiler
HG–23
> 1,200 Input MBH
$350.00
Boiler
Ref #
Process Boiler Tune-Up
Incentive
Unit
HG–24
≤ 3,000 Input MBH
$350.00
Boiler
HG–25
>3,000 – <6,000 Input MBH
$1,000
Boiler
HG–26
≥6,000 – <10,000 Input MBH
$1,500
Boiler
HG–27
≥10,000 Input MBH
$2,000
Boiler
Ref #
Domestic Hot Water Tune-Up
Incentive
Unit
HG–28
≥ 199 Input MBH
$75.00
Boiler
Total Incentives
# of Units
Total Incentives
# of Units
Total Incentives
# of Units
Total Incentives
Furnace/RTU Tune-Up
Ref #
Equipment Size
Incentive
Unit
HG–29
40 – 300 Output MBH
$50
Furnace/RTU
HG–30
301 – 500 Output MBH
$100
Furnace/RTU
HG–31
> 500 Output MBH
$150
Furnace/RTU
All Measures
Total Boiler/Furnace Tune-up Incentives
dteenergy.com/savenow
25
V1:11/01/15
Boiler/Furnace
Tune-Up
# of Units
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Food Service – Gas Incentive Worksheet
Check the Michigan-Made box
only if the piece of equipment is for a full unit
replacement and not a retrofit for which you are seeking an incentive, meets the
Michigan-Made bonus specifications and you can provide the manufacturer affidavit.
Steam Cookers
Ref #
Equipment Type
Incentive
Unit
FG–1
ENERGY STAR® Steam Cookers (5 Pan)
$750.00
Cooker
FG–2
ENERGY STAR® Steam Cookers (6 Pan)
$900.00
Cooker
Incentive
Unit
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
# of Units
Total Incentive
Ovens
Ref #
Equipment Type
FG–3
ENERGY STAR® Convection Ovens
$300.00
Oven
FG–4
Combination Ovens
$500.00
Oven
FG–5
Rack Oven Single
$400.00
Oven
FG–6
Rack Oven Double
$800.00
Oven
Incentive
Unit
Fryers/Griddles
Ref #
Equipment Type
FG–7
ENERGY STAR® Fryers
$225.00
Fryer
FG–8
Large Vat Fryer
$300.00
Fryer
FG–9
ENERGY STAR® Griddles
$100.00
Griddle
Miscellaneous
Ref #
Equipment Type
Incentive
Unit
FG–10
Pre-Rinse Sprayers (Gas Water Heat)
$30.00
Sprayer
FG–11
Night Covers (Vertical)*
$0.75
Linear Foot x Hrs/Day
FG–12
Refrigeration Condenser
Waste Heat Recovery
Domestic Water Heating
$35.00
Ton
Space Heating
$75.00
Ton
Reach-in Refrigerated
Display Case Door Retrofit
Medium Temp
$20.00
Linear Foot
Low Temp
$25.00
Linear Foot
FG–13
FG–14
FG–15
Ft.
Hrs.
* To calculate night cover incentive, multiply incentive x linear ft x hrs that night cover is used per day. May also be eligible for electric incentives for DTE Energy electric customers.
Controls
Equipment Type
FG–16
Commercial Kitchen Ventilation Hood with Demand Control
Incentive
Unit
$0.25
CFM Reduced
# of Units
Total Incentive
Food Service
– Gas
Ref #
Michigan-Made
All Measures
Total Food Service – Gas Incentives
dteenergy.com/savenow
26
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Custom Measures Worksheet Instructions – Reservation Application Required
Use this information to help you complete your Custom Incentive Worksheet on the following page(s).
1. For each individual type of equipment, use a separate “Item” box. For example: Do not combine different types of lighting under one item.
2. If you have a lighting project: Before you begin the Custom portion of your Application, use our “Prescriptive or Custom?” worksheet
(Page 28) to determine whether your project qualifies for a custom Application or should be submitted as a Prescriptive measure. Also,
contact us if you have questions about how to calculate your “Before” and After” retrofit operating hours; or how to calculate your gas
savings, which must be entered manually on the custom page (in the electronic version, the Application will calculate electric savings).
3. Under Before Retrofit and After Retrofit: Be as specific as possible with your description and quantities. This includes, but is not limited to: quantity, name, manufacturer, model number, size (ex: hp or kW or Btu/hr) for the existing and new equipment, as well as any
other information that can help calculate the energy used by the equipment. Write the “Reference Number” for each item on
all specification sheets and invoices related to that specific item and attach to your Final Application.
4. Under “Hours of Operation” for both “Before” and “After” retrofit, provide a documented method for arriving at these figures. Submit
your method of calculation with this Application.
5. Insert the KW for the equipment for both “Before” and “After” retrofit.
6. Under Your Current Energy Cost ($ per
Sum of 12 consecutive monthly utility bills for electricity ($)
Your Current
unit), enter your average costs for the energy
=
Electricity Costs
Sum of electricity used during the same 12 consecutive months as above (kWh)
source – electricity, natural gas or both – that
your measure will be saving. To determine your
Your Current
Sum of 12 consecutive monthly utility bills for natural gas ($)
current annual cost for each energy source, use
Natural Gas
=
Sum of natural gas used during the same 12 consecutive months as above (Ccf) X 1 Mcf/10 Ccf
the formulae at right: NOTE: Your natural gas
Costs
bill is calculated in units of Ccf and must be
converted to Mcf. The conversion formula is 10 Ccf = 1 Mcf and has been incorporated into the above equation for you.
7. Next, separately calculate your Annual Electric Savings by using the following process. If you are using the electronic version, this
will be calculated for you):
a) Enter the “Before” hours
b) Enter the “Before” KW
c) Multiply A x B
d) do the same for “After”
e) Subtract the new from the old.
This is the Annual Electric Savings to be entered on the form. For complex projects, provide a separate analysis showing how you
determined the energy savings or contact us for assistance.
8. Next, separately calculate your Annual Natural Gas Savings by Mcf (if applicable). Methods for calculating natural gas savings may
vary. If possible, use the following process:
a) Show the Mcf used by the existing piece of equipment by providing 12 months of natural gas bills, metered data or a calculation, then:
b) Provide a calculation of the expected Mcf of the new equipment, then:
c) Subtract the new from the old.
This is the Annual Natural Gas Savings to be entered on the form.
9. If you’re using the interactive version of this Application, the Calculated Incentive will be entered for you. If you are using a paper
version, determine your Calculated Incentive for each measure by multiplying the Annual Electric Savings by $0.07/kWh and
the Annual Natural Gas Savings by $4.00/Mcf.
10. Next, enter the Measure Cost. This is the cost of implementing a measure less any costs incurred to achieve non-energy related
project benefits. Only costs associated with the rebated energy savings measure should be included in the Measure Cost (this cannot
include internal labor cost), which is the basis for determining the simple payback period for custom measures, and is defined as either:
a) For end-of-life equipment replacement measures: the cost difference between equipment meeting Program efficiency criteria
and equipment meeting the minimum efficiency allowable by code or industry standard; or
b) For retrofit, early replacement and new technology measures: the cost of new equipment, components or materials added to
existing equipment for the purpose of improving its energy efficiency.
11. If you’re using the interactive version of this Application, the
Simple Payback Period for each fuel type will be entered for
you. If you are using a paper version, use the formulae shown
on the worksheet pages to determine the payback by fuel type.
Simple
Payback
Period
=
Aggregate Measure Cost
(Annual kWh Saved x Electricity Cost) + (Annual Mcf Saved x Natural Gas Cost)
13. Total Awarded Incentives are calculated at no more than 50% of the respective Measure Costs for electric and gas items.
IMPORTANT: Check the appropriate Category box (Lighting, HVAC-Gas, Process-Electric, etc.) for each item you list on the Custom worksheet(s).
dteenergy.com/savenow
27
V1:11/01/15
Custom
12. If you’re using the interactive version of this Application, the Total Calculated Incentives at the bottom of the form will be
entered for you. If you’re using the paper version, first total the Measure Cost for all measures and enter that value in Aggregate
Measures Cost. Then total all the individual measure Calculated Incentives and enter that in Total Calculated Incentives.
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
Prescriptive or Custom Incentive Worksheet
Prescriptive or Custom?
Where does your lighting project fall?
Does your lighting project call for a Custom calculation — or does it fall within our Prescriptive measures?
To answer that question, follow these instructions:
Step 1:
Do the type of fixtures in your project match a Prescriptive measure in our Application?
No: Submit it as a Custom measure
Yes: Continue to Step 2.
Step 2:
a. Enter your fixture “Before Retrofit” quantity (the existing condition) in the box below.
b. Enter your fixture “After Retrofit” quantity (the new condition) in the box below.
c. Follow the instructions in the orange box.
Enter “Before Retrofit” fixture quantity:
Enter “After Retrofit” fixture quantity:
Custom
Follow these instructions:
dteenergy.com/savenow
28
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
IMPORTANT: If you fail to complete each section, check the appropriate category or enter all
required information, the worksheet will not calculate your incentive and carry the value to Page 6.
Custom Incentive Worksheet
Reservation Application must be submitted BEFORE project begins
See Instructions on Page 27. Complete every blank box for each item you submit.
Please attach all equipment specifications to your Reservation Application before you submit for review.
Ref# CU–1
Location (department, area, etc.) ______________________________
Description
Elec.Category Gas
Before Retrofit
After Retrofit
“Before” hours of operation calculation for this specific equipment
Hours/week
Non-work
days/year
Weeks/year
Hours used per year (a)
“After” hours of operation calculation for this specific equipment
Hours/week
kW (b)
Annual Savings*
(Units/Year) (A)
Will the “After Retrofit” specific
piece of equipment listed here
be in operation during the hours
of 3–6 p.m. on Monday–Thursday
in the month of July?
Yes No
Non-work
days/year
Weeks/year
Hours used per year (c)
Current Energy Cost
($ per Unit)
Lighting
HVAC
Miscellaneous
Process
Food Service
Hot Water/Laundry
Insulation
kW (d)
Incentive Rate
($ per Unit) (B)
Calculated
Incentive (A x B)
Service
Unit
Electric
kWh
$0.07
Measure Cost
Capped Measure Incentive
Natural Gas
Mcf
$4.00
(from Total Awarded Incentive below)
* For Electric projects use the following formula: (a x b) – (c x d). For natural gas projects, you must enter your own calculated Annual Savings and provide documentation.
Ref# CU–2
Location (department, area, etc.) ______________________________
Description
Elec.Category Gas
Before Retrofit
After Retrofit
“Before” hours of operation calculation for this specific equipment
Hours/week
Non-work
days/year
Weeks/year
Hours used per year (a)
“After” hours of operation calculation for this specific equipment
Hours/week
kW (b)
Annual Savings*
(Units/Year) (A)
Will the “After Retrofit” specific
piece of equipment listed here
be in operation during the hours
of 3–6 p.m. on Monday–Thursday
in the month of July?
Yes No
Non-work
days/year
Weeks/year
Hours used per year (c)
Current Energy Cost
($ per Unit)
Lighting
HVAC
Miscellaneous
Process
Food Service
Hot Water/Laundry
Insulation
kW (d)
Incentive Rate
($ per Unit) (B)
Calculated
Incentive (A x B)
Service
Unit
Measure Cost
Electric
kWh
$0.07
Capped Measure Incentive
Natural Gas
Mcf
$4.00
(from Total Awarded Incentive below)
* For Electric projects use the following formula: (a x b) – (c x d). For natural gas projects, you must enter your own calculated Annual Savings and provide documentation.
Electric Simple Payback
Period
=
must be ≥1 to ≤8 years
Electric Aggregate Measure Cost
Aggregate Annual kWh Saved x Current Energy Cost
Aggregate
Measure Cost
Total Custom Incentives
(Includes values entered on pages 29-31)
Gas Simple
Payback Period
must be ≥1 year
Aggregate
Annual Savings
Gas Aggregate Measure Cost
Aggregate Annual Mcf Saved x Current Energy Cost
Current
Energy Cost
Simple
Payback Period*
Total Calculated
Incentive
Total Awarded
Incentive**
Electric
Natural Gas
Total Measure Cost
Total Custom Incentive
If you require assistance completing this section, contact our office.
29
V1:11/01/15
Custom
** T
otal Awarded Incentives for each utility are capped at no more than
50% of the Total Measure Cost. If one utility does not qualify for an incentive, the other utility is capped at no more than 50% of the Aggregate
Measure Cost for that utility
IMPORTANT NOTES:
* The Simple Payback Period must fall within the electric or gas parameters to qualify for an incentive (see formulae above) If the Total Awarded
Incentive for either electric or gas displays DNQ (does not qualify), then the
payback period fell outside of required parameters or the measure cost(s) or
energy savings were missing.
dteenergy.com/savenow
=
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
IMPORTANT: If you fail to complete each section, check the appropriate category or enter all
required information, the worksheet will not calculate your incentive and carry the value to Page 6.
Custom Incentive Worksheet
Reservation Application must be submitted BEFORE project begins
See Instructions on Page 27. Complete every blank box for each item you submit.
Please attach all equipment specifications to your Reservation Application before you submit for review.
Ref# CU–3
Location (department, area, etc.) ______________________________
Description
Elec.Category Gas
Before Retrofit
After Retrofit
“Before” hours of operation calculation for this specific equipment
Hours/week
Non-work
days/year
Weeks/year
Hours used per year (a)
“After” hours of operation calculation for this specific equipment
Hours/week
kW (b)
Annual Savings*
(Units/Year) (A)
Will the “After Retrofit” specific
piece of equipment listed here
be in operation during the hours
of 3–6 p.m. on Monday–Thursday
in the month of July?
Yes No
Non-work
days/year
Weeks/year
Hours used per year (c)
Current Energy Cost
($ per Unit)
Lighting
HVAC
Miscellaneous
Process
Food Service
Hot Water/Laundry
Insulation
kW (d)
Incentive Rate
($ per Unit) (B)
Calculated
Incentive (A x B)
Service
Unit
Measure Cost
Electric
kWh
$0.07
Capped Measure Incentive
Natural Gas
Mcf
$4.00
(from Total Awarded Incentive below)
* For Electric projects use the following formula: (a x b) – (c x d). For natural gas projects, you must enter your own calculated Annual Savings and provide documentation.
Ref# CU–4
Location (department, area, etc.) ______________________________
Description
Elec.Category Gas
Before Retrofit
After Retrofit
“Before” hours of operation calculation for this specific equipment
Hours/week
Non-work
days/year
Weeks/year
Hours used per year (a)
“After” hours of operation calculation for this specific equipment
Hours/week
kW (b)
Annual Savings*
(Units/Year) (A)
Will the “After Retrofit” specific
piece of equipment listed here
be in operation during the hours
of 3–6 p.m. on Monday–Thursday
in the month of July?
Yes No
Non-work
days/year
Weeks/year
Hours used per year (c)
Current Energy Cost
($ per Unit)
Lighting
HVAC
Miscellaneous
Process
Food Service
Hot Water/Laundry
Insulation
kW (d)
Incentive Rate
($ per Unit) (B)
Calculated
Incentive (A x B)
Service
Unit
Electric
kWh
$0.07
Measure Cost
Capped Measure Incentive
Natural Gas
Mcf
$4.00
(from Total Awarded Incentive below)
* For Electric projects use the following formula: (a x b) – (c x d). For natural gas projects, you must enter your own calculated Annual Savings and provide documentation.
Electric Simple Payback
Period
=
must be ≥1 to ≤8 years
Aggregate Annual kWh Saved x Current Energy Cost
Gas Simple
Payback Period
must be ≥1 year
Aggregate
Measure Cost
Aggregate
Annual Savings
Electric Aggregate Measure Cost
Total Custom Incentives
(Includes values entered on pages 29-31)
Custom
Gas Aggregate Measure Cost
Aggregate Annual Mcf Saved x Current Energy Cost
Current
Energy Cost
Simple
Payback Period*
Total Calculated
Incentive
Total Awarded
Incentive**
Electric
Natural Gas
Total Measure Cost
Total Custom Incentive
** Total Awarded Incentives for each utility are capped at no more than
50% of the Total Measure Cost. If one utility does not qualify for an incentive, the other utility is capped at no more than 50% of the Aggregate
Measure Cost for that utility
IMPORTANT NOTES:
* The Simple Payback Period must fall within the electric or gas parameters to qualify for an incentive (see formulae above) If the Total Awarded
Incentive for either electric or gas displays DNQ (does not qualify), then the
payback period fell outside of required parameters or the measure cost(s) or
energy savings were missing.
dteenergy.com/savenow
=
If you require assistance completing this section, contact our office.
30
V1:11/01/15
IMPORTANT NOTE: Use the reference numbers in the left column to
identify and mark all related invoices, specification sheets and other
documents related to that measure and submitted with this Application.
IMPORTANT: If you fail to complete each section, check the appropriate category or enter all
required information, the worksheet will not calculate your incentive and carry the value to Page 6.
Custom Incentive Worksheet
Reservation Application must be submitted BEFORE project begins
See Instructions on Page 27. Complete every blank box for each item you submit.
Please attach all equipment specifications to your Reservation Application before you submit for review.
Ref# CU–5
Location (department, area, etc.) ______________________________
Description
Elec.Category Gas
Before Retrofit
After Retrofit
“Before” hours of operation calculation for this specific equipment
Hours/week
Non-work
days/year
Weeks/year
Hours used per year (a)
“After” hours of operation calculation for this specific equipment
Hours/week
kW (b)
Annual Savings*
(Units/Year) (A)
Will the “After Retrofit” specific
piece of equipment listed here
be in operation during the hours
of 3–6 p.m. on Monday–Thursday
in the month of July?
Yes No
Non-work
days/year
Weeks/year
Hours used per year (c)
Current Energy Cost
($ per Unit)
Lighting
HVAC
Miscellaneous
Process
Food Service
Hot Water/Laundry
Insulation
kW (d)
Incentive Rate
($ per Unit) (B)
Calculated
Incentive (A x B)
Service
Unit
Measure Cost
Electric
kWh
$0.07
Capped Measure Incentive
Natural Gas
Mcf
$4.00
(from Total Awarded Incentive below)
* For Electric projects use the following formula: (a x b) – (c x d). For natural gas projects, you must enter your own calculated Annual Savings and provide documentation.
Ref# CU–6
Location (department, area, etc.) ______________________________
Description
Elec.Category Gas
Before Retrofit
After Retrofit
“Before” hours of operation calculation for this specific equipment
Hours/week
Non-work
days/year
Weeks/year
Hours used per year (a)
“After” hours of operation calculation for this specific equipment
Hours/week
kW (b)
Annual Savings*
(Units/Year) (A)
Will the “After Retrofit” specific
piece of equipment listed here
be in operation during the hours
of 3–6 p.m. on Monday–Thursday
in the month of July?
Yes No
Non-work
days/year
Weeks/year
Hours used per year (c)
Current Energy Cost
($ per Unit)
Lighting
HVAC
Miscellaneous
Process
Food Service
Hot Water/Laundry
Insulation
kW (d)
Incentive Rate
($ per Unit) (B)
Calculated
Incentive (A x B)
Service
Unit
Electric
kWh
$0.07
Measure Cost
Capped Measure Incentive
Natural Gas
Mcf
$4.00
(from Total Awarded Incentive below)
* For Electric projects use the following formula: (a x b) – (c x d). For natural gas projects, you must enter your own calculated Annual Savings and provide documentation.
Electric Simple Payback
Period
=
must be ≥1 to ≤8 years
Electric Aggregate Measure Cost
Aggregate Annual kWh Saved x Current Energy Cost
Aggregate
Measure Cost
Total Custom Incentives
(Includes values entered on pages 29-31)
Gas Simple
Payback Period
must be ≥1 year
Aggregate
Annual Savings
Gas Aggregate Measure Cost
Aggregate Annual Mcf Saved x Current Energy Cost
Current
Energy Cost
Simple
Payback Period*
Total Calculated
Incentive
Total Awarded
Incentive**
Electric
Natural Gas
Total Measure Cost
Total Custom Incentive
If you require assistance completing this section, contact our office.
31
V1:11/01/15
Custom
** T
otal Awarded Incentives for each utility are capped at no more than
50% of the Total Measure Cost. If one utility does not qualify for an incentive, the other utility is capped at no more than 50% of the Aggregate
Measure Cost for that utility
IMPORTANT NOTES:
* The Simple Payback Period must fall within the electric or gas parameters to qualify for an incentive (see formulae above) If the Total Awarded
Incentive for either electric or gas displays DNQ (does not qualify), then the
payback period fell outside of required parameters or the measure cost(s) or
energy savings were missing.
dteenergy.com/savenow
=
Boiler/Furnace Tune-Up Incentive Addendum
Tune-up Checklist – Furnace/Boiler #1
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Check for proper venting
Adjust burner and gas input, manual or motorized draft controls
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Include a copy of the combustion analyzer test (boilers only)
Tune-up Checklist – Furnace/Boiler #2
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Adjust burner and gas input, manual or motorized draft controls
Check for proper venting
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Boiler/Furnace
Tune-Up
Include a copy of the combustion analyzer test (boilers only)
Use this addendum for any additional boiler/furnace tune-ups you perform at the same site. Use additional copies as needed.
On Page 25 you must enter the total number of boilers/furnaces by type and size (at the same site) so the total incentives can be correctly calculated and entered.
dteenergy.com/savenow
32
V1:11/01/15
Boiler/Furnace Tune-Up Incentive Addendum
Tune-up Checklist – Furnace/Boiler #3
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Check for proper venting
Adjust burner and gas input, manual or motorized draft controls
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Include a copy of the combustion analyzer test (boilers only)
Tune-up Checklist – Furnace/Boiler #4
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Adjust burner and gas input, manual or motorized draft controls
Check for proper venting
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Include a copy of the combustion analyzer test (boilers only)
Boiler/Furnace
Tune-Up
Use this addendum for any additional boiler/furnace tune-ups you perform at the same site. Use additional copies as needed.
On Page 25 you must enter the total number of boilers/furnaces by type and size (at the same site) so the total incentives can be correctly calculated and entered.
dteenergy.com/savenow
33
V1:11/01/15
Boiler/Furnace Tune-Up Incentive Addendum
Tune-up Checklist – Furnace/Boiler #5
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Check for proper venting
Adjust burner and gas input, manual or motorized draft controls
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Include a copy of the combustion analyzer test (boilers only)
Tune-up Checklist – Furnace/Boiler #6
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Adjust burner and gas input, manual or motorized draft controls
Check for proper venting
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Boiler/Furnace
Tune-Up
Include a copy of the combustion analyzer test (boilers only)
Use this addendum for any additional boiler/furnace tune-ups you perform at the same site. Use additional copies as needed.
On Page 25 you must enter the total number of boilers/furnaces by type and size (at the same site) so the total incentives can be correctly calculated and entered.
dteenergy.com/savenow
34
V1:11/01/15
Boiler/Furnace Tune-Up Incentive Addendum
Tune-up Checklist – Furnace/Boiler #7
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Check for proper venting
Adjust burner and gas input, manual or motorized draft controls
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Include a copy of the combustion analyzer test (boilers only)
Tune-up Checklist – Furnace/Boiler #8
Site Name
Date of Tune-up
ManufacturerType (Hot Water Boiler, High/Low Pressure Steam Boiler, Furnace, RTU)
Model Number
Annual Hours of Operation
Serial Number
Unit Input Capacity (MBH)
Company Performing Tune-up
Technician Performing Tune-up
Measure pre/post combustion efficiency using electronic flue gas analyzer
Check safety controls
Adjust combustion air flow and air intake as needed, reduce excessive
stack temperatures
Check adequacy of combustion air intake
Adjust burner and gas input, manual or motorized draft controls
Check for proper venting
Check Draft Control Dampers
Clean burners, combustion chamber and heat exchanger surfaces
Clean and inspect burner nozzles
Complete visual inspection of system piping and installation
Include a copy of the combustion analyzer test (boilers only)
Boiler/Furnace
Tune-Up
Use this addendum for any additional boiler/furnace tune-ups you perform at the same site. Use additional copies as needed.
On Page 25 you must enter the total number of boilers/furnaces by type and size (at the same site) so the total incentives can be correctly calculated and entered.
dteenergy.com/savenow
35
V1:11/01/15
Submission
Checklist
To submit your Reservation Application*
1. Complete the Application (Pages 2-4).
a. Ensure that you have completed the Reservation Application checklist (Page 2).
b. Ensure that you have completed the Customer information (Page 3).
c. Ensure that you have completed the Contractor and, if applicable,
Third Party Payment information (Page 4).
2. Complete all relevant worksheets for your project.
Total Incentives Requested
BEFORE YOU SUBMIT: If the figure at right does not match the
incentives you expected to request, please review your
worksheets and the summary page (Page 6).
3.
Submit your Reservation Application electronically by clicking here
or
Fax to: 313.664.1950
or
Print and mail to:
DTE Energy Efficiency Program for Business
P.O. Box 11289
Detroit, MI 48211
SUBMIT
* A Reservation Application may not be required for your project, but is strongly encouraged to set
aside funds. Submission of a Reservation Application does not guarantee that funds will be available.
To submit your FINAL Application
1. Complete or confirm all information on Pages 2-4.
2. Complete and have account holder sign Final Application Agreement (Page 6)
3. Complete or confirm all relevant worksheets for your project.
BEFORE YOU SUBMIT: If the figure at right does not match the
Total Incentives Requested
incentives you expected to request, please review your worksheets
and the summary page (Page 6).
3.
Submit your Final Application electronically by clicking here
or
Fax to: 313.664.1950
or
Print and mail to:
DTE Energy Efficiency Program for Business
P.O. Box 11289
Detroit, MI 48211
SUBMIT
There are values entered
on a Custom Item without
a Category selected. You
MUST select a Category
to receive an incentive
Mail, fax or email all manufacturers’ specifications, detailed invoices and other supporting
documents to our office. In your mailing, on your cover sheet or in your subject line, please
include the customer name and project number: DTE-(year)(5-digit number). If you don’t
have a project number, make sure you enter your customer name.
dteenergy.com/savenow
36
V1:11/01/15
Download