11-ITB-002-SS, HVAC Modifications, Ft. Lauderdale, Fl Technical Questions and Answers No. 1 B.12, D. 11, B. 37.1 2(a) 2. e. 24 2 24, 25 Is a bid bond required in this Yes, In accordance with Section B.37.1 (2)(a) 4.(b) 1. b., c., B.38, B.39 of the bid document. package? We can’t really do that until we get numbers for bid due. 17, 32 What else beside license is required – Please refer to Section B.12 Solicitation Requirements, Section C Scope of Work and Contract Conditions for the mandatory requirements. the directions are not explicit. 4 37.1 2(a) 4. 1.b., c., B.38, B.39, B.12, Section C B.9 5 B.7 15 6 B.6 14 and Addendum #1 3 15 Can I attached our financial statement No, follow instructions in Section B 37.1 2 (a) 2. e., it is mandatory on Levels Four and Five projects the bidder must provide a completed from 2009 – 2010 is not yet experience questionnaire and financial statement on the form entitled “Experience Questionnaire and Contractor’s Financial Statement”, form complete? number DBC-5085, revised 1/98, incorporated herein by reference. Form number DBC-5085 may be obtained from the Department of Management Services, Division of Building Construction, 4050 Esplanade Way, Suite 335, Tallahassee, Florida 32399-0950,website: http://www.dms.myflorida.com/business_operations/real_estate_development_management/building_construction/forms_and_documents. The Contractor’s financial condition must demonstrate that adequate liquid assets and equipment are available to properly perform this project as follows: The value of liquid assets must be no less than one-twentieth of the amount of the base bid. Liquid assets shall include cash, stocks, bonds, pre-paid expenses and receivables, but shall not include the value of equipment. Can the package be emailed or faxed or do we need to Fed-Ex? We would like to have another walk through with our subcontractors? Preferably before the due date for questions. This would give us enough time to submit questions after the walk through. Is it possible to extend the technical question due date? No, see Section B.9 Submission of Responses. The Mandatory Pre-Site Visit was held per the date and time specified in Section B.6 Calendar of Events. Only prequalified contractors may schedule additional site visit by contacting the building manager Derrick Smith at 954-677-5628 or mobile 954-290-3871 with their subcontractors. The due date for technical questions was already amended in Addendum No. 1 Section B.6 Calendar of Events. Page 1 of 2 11-ITB-002-SS, HVAC Modifications, Ft. Lauderdale, Fl Technical Questions and Answers No. 7 Section Page # B.6 14 B.7 15 8 9 B.6 15 10 B.7 15 11 B.7 15 12 B.40 27 Questions Is an extension of the Project's Bid Due date possible? Please advice. Is a second job site visit possible? If so, please advise how to proceed. Is an extension for the submitting of Technical Questions due date possible? Please advise. Specifications 10950-1 set that the Test and Balance (TAB) Contractor must be AABC (Associated Air Balance Council) Certified. Is a TAB Contractor NEBB (National Environmental Balancing Bureau) Certified also accepted? Please clarify. Are the Building Structural Plans available? If so, please advise how to obtain them. The contractor will be responsible for the appropriate disposal of the existing equipment to be demolished? Please advise. Answers The bid due date was already amended in Addendum No. 1 Section B.6 Calendar of Events. Please see the Agency’s response to question number 5. Please see the Agency’s response to question number 6. We do not take exception to a NEBB qualified T&B Agent bidding the project. No, the Agency does not have structural plans and it is encumbered of the contractor to conduct its own investigation or have its own structural engineer provide what is needed to bid on the project. The Owner has first right of refusal for demolished equipment. Upon Owner's direction, the Contractor is responsible for disposal of demolished equipment in accordance with the authority having jurisdiction. Refer to general note #27 on sheet M0.1. Page 2 of 2