Los Angeles World Airports
LAX Landside Access Modernization Program
1
LAX Landside Access Modernization Program Goals
• Improve the passenger
experience
• Relive traffic from
Central Terminal Area
and surrounding
streets
• Continue to modernize
LAX
• Connect LAX to public
transit
2
3
Comprehensive Solution
New fully automated people mover system
will unlock new ways to access LAX
4
LAX Landside Access Modernization Program
Intermodal Transportation Facility (West)
96th St. Metro Station Connection to LAX
Consolidated Rent-a-Car Center
Lincoln Blvd
Airport Blvd
Sepulveda Blvd
Arbor Vitae St
96th St
98th St
Aviation Blvd
La Cienega Blvd
Century Blvd
Automated People Mover System
Intermodal Transportation Facility (East)
5
Rental Car Operators
Today
Non-chain
Larger Chain
6
Future LAWA Consolidated Rent-A-Car Center
Consolidation of rental car facilities into a single location will remove
roughly 17% of traffic congestion currently traveling into the CTA
7
Consolidated Rent-A-Car Center (ConRAC)
Arbor Vitae St.
Century Blvd
Concepts
8
Automated People
Mover System
9
APM – Central Terminal Area Alignment
10
Intermodal Transportation Facilities
Arbor Vitae St.
96th St.
98th St.
Century Blvd
11
Intermodal Transportation Facilities
Planned Features
•
Private vehicle parking
•
Connections to shuttles
•
Passenger pick-up/drop-off area
•
Potential collateral development
opportunities
12
Intermodal Transportation Facilities
Planned Features
•
Private vehicle parking
•
Connections to shuttles
•
Passenger pick-up/drop-off area
•
Potential collateral development
opportunities
13
Existing Routes into the Central Terminal Area
Limited roadways prone to congestion
14
Potential Roadway Improvements
Sepulveda Blvd.
Arbor Vitae St.
Aviation Blvd.
Century Blvd
15
Airport Metro Connector Project
96th Street Metro Transit Station
• Metro selection of locally
preferred alternative requires
additional APM station
• LAWA will provide adjacent
commercial transit center with
pick-up and drop-off, and parking
facilities
• LAWA continues to collaborate
with Metro on station design and
delivery strategies
16
Airport Metro Connector Project
Conceptual Rendering of Metro’s Proposed
96th Street Transit Station
17
LAWA Milestones Completed to Date & Next Steps
2014
•
•
•
•
May: LAWA updated BOAC on the preferred vision for APM alignment east of the CTA.
June: BOAC released RFP for CEQA/NEPA environmental consultant team (awarded September).
September: LAWA updated BOAC on the preferred vision for APM alignment within the CTA.
December: LAWA will provide staff recommended alternative to BOAC.
20152016
•
January: LAWA will release Notice of Preparation for LAX Landside Access Modernization Program
EIR.
LAWA will conduct environmental analyses, planning, design, stakeholder coordination and public
outreach.
LAWA will develop preliminary engineering designs and release RFP for APM Design-Builder.
LAWA will secure CEQA/NEPA clearances and related entitlements.
LAWA will procure and award RFP contract to APM Design-Builder for final design.
•
•
•
•
20172018
•
Begin construction on the LAX Landside Access Modernization Program (estimated 5-7 years of APM
construction).
18
www.ConnectingLAX.com
For more
information,
please visit:
Website: www.connectinglax.com
Email: transportationplanning@lawa.org
19
Thank you!!
Questions and Answers