NEW CONSTRUCTION SERVICE SUPPORTING YOUR BUILDING DESIGN PROJECT The ComEd Smart Ideas® New Construction Service team supports your project’s goals while offering the opportunity to explore energy-saving ideas and strategies. These strategies can offer long-term energy and cost savings for your project. Financial incentives and expert technical assistance are offered to encourage design teams and building owners to surpass standard practices and exceed current Illinois Energy Conservation Code requirements. The program includes comprehensive energy modeling services which describe the relationships between building systems and energy-efficient technologies to help building owners and design teams with the decision-making process long before design documents are complete. IS THIS PROGRAM A GOOD FIT FOR YOUR PROJECT? T O PA R T ICIPAT E YOUR P RO JE C T S HOUL D BE: •New construction or major renovation of an existing space • Early in project planning (concept development or schematic design is best) • A project that includes significant beyond-code upgrades in the final scope, improving at least two of the following four building systems: envelope, primary HVAC equipment, lighting, and qualified refrigeration systems • Designed to be more energy efficient than current International Energy Conservation Code (IECC) for commercial buildings •Commercial, industrial, or multifamily building greater than 5,000 square feet in area • Private or nonprofit facility • Located in ComEd service territory HOW T O PA R T ICIPAT E 1. C ontact us to verify eligibility, and apply for technical assistance early in the project planning process. Projects submitted too late may receive a reduced incentive rate, or may be ineligible for new construction technical assistance and incentives. 2. Submit the technical assistance application and any preliminary design documents as soon as possible. 3. C ollaborate with our team throughout the duration of the project. Xavier Apartments, Photo By Mark Ballogg BENEFITS •Access technical experts and energy modeling services at no cost to optimize building performance •Save energy annually and lower operating expenses through implementation of recommended measures •Owners: receive financial incentives to offset first costs for beyond-code equipment •Lead design firms: receive financial incentives for active engagement in the program INCEN T I V E R AT E GUIDEL INE S PROJECT ENGAGEMENT INCEN T I V E R AT E ngage prior to design team $0.14/kWh up to 5 million kWh* E selection and include energy Accelerate Performance performance requirement (pilot offer) ngage between concept E planning and 50 percent design development $0.10/kWh up to 5 million kWh* rojects engaging after 50 $0.07/kWh up to 5 million kWh* P percent design development Expedited Assistance and at least six weeks prior (pilot offer) to bid issuance or purchase of equipment C ON TAC T U S ENGAGED DESIGNER INCENTIVES E-mail: SmartIdeasBiz@ComEd.com Call: 855-433-2700 Visit our Website: ComEd.com/NewConstruction ully engaged through F 10 percent of measure incentive technical assistance process © Commonwealth Edison Company, 2016 *Incentive rate for savings above 5 million kWh are provided at a reduced rate. This program is funded by ComEd, Nicor Gas, Peoples Gas, and North Shore Gas customers in compliance with Illinois law.