World Class Expertise Control Room and Improved Operations Safety and Automation Systems (SAS) Telecommunication and Industrial IT Remote Operations in the context of IO: is onshore control room the ultimate IO scenario? IO14 Conference, 1 October 2014 , Trondheim – Norway Ove Heitmann Hansen – Managing Director Eldor AS – (+47 91787024) – ohh@eldor.no 2 The context of IO request put forward to us…. ”One Onshore Operation, Control and Monitoring Centre…., please!” Copyright. Eldor AS. deeper into details 3 Topics – for todays presentation • Remote operations is very often linked to establishing/moving the control room from offshore to onshore in the Norwegian context. Is that all? • The technology available gives us the possibilities to remotely operate, maintain and monitor many of the offshore O&G field safely from shore. • This presentation will highlight what Remote Operations can be, and highlight some of the challenges of implementing Remote Operations in an IO context. Copyright. Eldor AS. deeper into details 4 A step against generation 2 24/7 Integrated onshore operation centers and control rooms IO = ”Real time data onshore for offshore fields and new integrated work processes” (Norwegian oil and gas association) IO = ”Use of Information Technology to change work processes to achieve better decisions, to remote control equipment and processes and to move functions and personnel to onshore” (White paper 38 (2003-2004) IO = ”Use of information teknology to change work processes to achieve better decisions. The technology eneables remote control of equipment nd processes. Functions and personel can be moved from offshore to onshore.” (White Paper 28 (2010-2011) Copyright. Eldor AS. deeper into details 5 Generation 1 case – BP Valhall Offshore and Onshore control room with shared control responsibilities Lista Valhall London Copyright. Eldor AS. deeper into details 6 Generation 1 case – BP Valhall BP – Valhall Re-development project has delivered control rooms both onshore and offshore, which gives Valhall the ability to have: collaborative working within and between the onshore and offshore teams and other locations 24/7 onshore monitoring and control training and simulation offshore/onshore via the operator training simulator integrated emergency response This shall support the Integrated Operation vision of “one team independent of where people are located” BP levels of Remote Control: Level 1 (offshore control): - Control in the field, with remote monitoring and support – ie an offshore control room connected to a remote onshore support centre Level 2 (Partial Onshore Control) – Shared control from a remote location – at Valhall this means an offshore and onshore control room with shared responsibilities for operations and surveillance between offshore and onshore The Strategy for Valhall is to progress to Level 3 (Onshore Control) - Full remote control from Valhall onshore control room, but maintaining a local field crew to provide surveillance and to Copyright. Eldor AS. intervene when needed deeper into details 7 Generation 2 case – Total Martin Linge Copyright. Eldor AS. deeper into details 8 Generation 2 case – Total Martin Linge The main objective for Martin Linge IO is to make quicker and better informed decisions in a distributed organization, based on right time information which is commonly available to the different disciplines independent of location throughout the field lifetime. The aim for Martin Linge is to work closer and more integrated together with selected vendors and service contractors (ref. the OLF IO Generation 2 model). For Martin Linge, IO is an integrated and natural part of the operation and maintenance (O&M). All field data needed to achieve full condition monitoring and performance of equipment and systems, as well as data needed for production optimization and drilling performance, will be gathered. The mindset will be that IO is not a separate system or element; it is an integration of people, process, technology and organisation IO will also influence on the architect work, in order to create working arenas suited for integrated operations. Copyright. Eldor AS. deeper into details 9 Integrated Operations and remote control in the “PPTO”- perspective IO = ”Use of Information Technology to change work processes to achieve better decisions, to remote control equipment and processes and to move functions and personnel to onshore” (White paper 38 – about the Petroleum sector (2003-2004) Integrated Operations: PPTO perspective – Seamless and improved collaboration Organisations People Processes Technology Copyright. Eldor AS. deeper into details 10 The development of control rooms towards remote control • Specialized local and hardwired equipment with simple software • No/limited infrastructure/network connections between offshore and onshore • Fiber possibilities, IT equipment and windows control system • Onshore nodes, redundancy of network, high availability and reliability Copyright. Eldor AS. deeper into details The development of control rooms 11 (Early stages) Copyright. Eldor AS. deeper into details Different generations of control rooms 12 (The development until presents) Copyright. Eldor AS. deeper into details Next generation control room 13 (The future – “in the cloud”??) Copyright. Eldor AS. deeper into details 14 Martin Linge Control Centre according to ISO 11064 definition Martin Linge Control Centre Onshore Operation Centre (OOC) Onshore Control Suite 5 12 TASC Platform Control Suite 5 6 6 7 7 4 - CCR 4 - LCR 13 Logistic 8 8 11 11 10 FSO Control Suite 5 10 9 14 – CER KPS Control Suite 6 5 9 4 - BCR 8 9 Copyright. Eldor AS. 15 Control Console 10 8 9 Use of CRIOP to verify and validate deeper into details How advanced is it to establish an onshore control room to 15 remotely control an offshore installation 24/7? The physical control room; architectural layout and functionalities is very standardized Some adaptions to onshore regulations, laws and standards The working environment act, TEK10, NORSOK, ISO 11064, TIA-942, etc Most companies have incorporated Integrated Operations and some remote monitoring/control in their Operating Philosophy, but the Operating Philosophy needs to be developed into Functional requirements covering: Supporting infrastructure, networks, utility systems and other technology to achieve availability/uptime and redundancy for a secure and reliable data transmission between onshore and offshore. Copyright. Eldor AS. deeper into details 16 The political and cultural game around remote control Within the PPTO-perspective the most challenging area is the people…: Employees Offshore and onshore management Labor unions Safety delegates The authorities NPD, PSA, The Labor Inspection authority, The data inspectorate, etc Partners What is the business case?? Competition Others The human beings – are they willing to change?? Copyright. Eldor AS. deeper into details 17 is onshore control room the ultimate IO scenario? The control room itself onshore is not enough, will quickly became a “show-room” with no content Need to incorporate all elements of the PPTO-perspective Needs to educate and train “champions” to keep focus and maintain goals of IO and Operating Philosophy Don´t forget; Most of us will claim that we are adaptable and open for changes, but in reality we are as human beings very resistance to changes…… Copyright. Eldor AS. deeper into details Thank you Ove Heitmann Hansen Managing Director Eldor AS +47 91787024 ohh@eldor.no Copyright. Eldor AS. deeper into details