DFA Draft Reference Offer - CP Technical Documentation 010916

advertisement
DFA Draft Reference Offer –
CP Technical Documentation
1st September 2016
Issue: DRAFT 1.0
The content of the following document is provided for information purposes
only. All information provided in this document is draft and is subject to variation
and final commercial agreement with Industry.
Draft 1.0 – 1st September 2016
Issued by Openreach
© British Telecommunication plc 2016
Page 1 of 5
1.
Introduction
3
2.
Schema alignment between EAD and DFA and version control
4
3.
Document History
5
Draft 1.0 – 1st September 2016
Issued by Openreach
© British Telecommunication plc 2016
Page 2 of 5
1. Introduction
The following technical documentation will be produced for CPs to enable them to consume
the Dark Fibre Access (DFA) Product. Documentation will be published in line with agreed
industry timescales.
Openreach releases R3300 and R3350 will build the initial E2E common capability. No
technical documentation will be issued until EIP 3 for R3400 on 16th Dec ’16, which delivers
a stable schema and product model.
A more detailed view of the publication plan for CP documentation will accompany the Full
Reference Offer.
Title
Overview
Location
Audience
EMP B2B
Specifications
A single zipped file for EMP
that will contain the following
DFA documentation.
DFA Release
Documentation area
on the Openreach
website
B2B CPs
Complete set of .xsd schema
files for EMP including Dialogue
Services
/Schemas folder
Documentation and example
XMLs for the Dialogue Services
that support DFA
/Dialogue Services
folder
Documentation and example
.xml files for DFA fulfilment
journey
/DFA Fulfilment folder
XML Definition Document for
EMP DFA Fulfilment
This document describes the
format and content of the data
within the XML elements for the
submission of Gateway
transactions
/DFA
Fulfilment/Documents
folder
DFA Product Features
Also known as the DFA Product
Model, this document describes
the structure of the DFA Product.
Attached to the XML
Definition for EMP
DFA Fulfilment
document
Documentation and example
.xml files for DFA assurance
journey
/DFA Assurance folder
XML Definition Document for
EMP DFA Assurance
This document describes the
format and content of the data
within the XML elements for the
/DFA
Assurance/Documents
folder
Draft 1.0 – 1st September 2016
Issued by Openreach
© British Telecommunication plc 2016
Page 3 of 5
submission of Gateway
transactions
EMP Response This document lists all the
Codes List
Response Codes that we may
send to you when responding
to your order.
Customer IT Zone on B2B CPs
Openreach Website
It includes codes that inform
you of order progress as well
as codes sent if we encounter
a problems or your order is
incorrect or incomplete.
DFA
Orchestration
Matrix
This document details the
DFA Business
business rules for DFA orders. Process area on the
Openreach website
B2B CPs
CPs will find this document
useful when building their
B2B gateway and also when
designing their internal
process flows.
Portal User
Guides
Screen by screen guide to the
Portal order journeys for DFA
on EMP.
DFA Process
Process flows for the
Documentation Fulfilment and Assurance
journeys.
DFA Release
Documentation area
on the Openreach
website
Portal
and B2B
CPs
DFA Business
Process area on the
Openreach website
Portal
and B2B
CPs
2. Schema Alignment between EAD and DFA and Version
Control
The DFA Schema will be based on V30 of the EAD schema. This is the version that current
B2B CPs are consuming against, and is the schema that introduced the new informational
Named Value Pair structure to reduce the volume of Response Codes sent to CPs.
In future releases if we upgrade either Schema this will apply equally to both EAD & DFA.
To keep schema changes to a minimum, where possible, all changes are implemented in
the underlying Product Models for the respective products.
Draft 1.0 – 1st September 2016
Issued by Openreach
© British Telecommunication plc 2016
Page 4 of 5
3. Document History
Status
Date
Details of Change
Draft 1.0
1st September 2016
Initial Publication
END OF DOCUMENT
Draft 1.0 – 1st September 2016
Issued by Openreach
© British Telecommunication plc 2016
Page 5 of 5
Download