Aluminum Frame Installation Instructions IMPORTANT: Thoroughly read all instructions before beginning installation. Frame must be set on a solid, level surface. Installer must follow good installation practices to maintain warranty. LOCATE FRAME ANCHORING HOLES UNDER STOP Inspect Frame Components 1. Unpackage all frame pieces and check for correct size and condition of components. Measure the new frame and door to make sure every thing is the correct size. Contact distributor if you have any questions. 2. Check the rough opening to confirm the frame will fit the opening. 3. Check rough opening for square in corners using a framing square. A Mark Frame Pieces CAULK ALL FOUR SIDES WHERE BRACKET MEETS JAMB REV DATE DESCRIPTION DR: TITLE: TOLERANCE: UNLESS OTHERWISE SPECIFIED DEC ANG FRAC SH SZ: SCALE: 1. Frame anchor holes should be drilled beneath the door stops or glass stops. Mark location of applied door stops on each frame piece before removing. Glass stops are taped to frame piece, not screw applied, so ThilgeAD ThilgeAD customer can locate them as desired. Mark which frame piece each ELEVATION stop is matched with. (Fig. A) LOCATE ANCHOR HOLES CK .031 UNDER STOP .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_A 1:2 DATE: 01-14-14 2. Remove stops from frames. Set aside, they will be (re)applied later. Assemble Frame and Mark Anchor Locations B WIPE OFF EXCESS CHAULK DR CK: 1. Instructions are general guidelines; adapt as needed to fit your frame configuration. SLIDE HEADER OVER JAMB BRACKET 2. Remove screws from corner brackets and set aside. Do not remove ThilgeAD ThilgeAD MISC brackets from jambs (screws can be loosened to adjust brackets). REV DATE DESCRIPTION DR: TITLE: DR CK CK: MISCELLANEOUS 3. .031 Before assembly of frame, caulk all four sides of each corner bracket CORNER CAULKING .5 1/32 where it is attached to the jamb. (Fig. B) TOLERANCE: UNLESS OTHERWISE SPECIFIED DEC ANG FRAC SH SZ: A SH.NO. 1 OF 1 DWG NO. 4. Slide header/mullion FIG_D over jamb corner brackets and reinstall screws; 01-15-14 1:2 hand tighten. Do not over tighten. (Fig. C) SCALE: C DATE: 5. Remove excess caulk. 6. Repeat Steps 5 and 6 until elevation is complete. 3.000 MIN REV DATE 3.000 MIN TOLERANCE: UNLESS OTHERWISE SPECIFIED 4.000 DEC MAXANG FRAC SH SZ: SCALE: 7. Chalk a line on floor for faces of jambs, and attach mullion bracket(s) to DRfloor as needed. DESCRIPTION CK DR: ThilgeAD CK: TITLE: CORNER CAULKING .031 .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_E 1:2 DATE: 01-15-14 FLOOR MULLION BRACKET TOLERANCE: UNLESS OTHERWISE SPECIFIED D 9. Mark anchor hole locations. Recommend jamb locations to be within 4” of jamb ends, 24” maximum spacing between anchor points. Avoid door stop screw locations. (Fig. E) 10.Recommend using a minimum of 2 anchors in the header, located 3” from the end to avoid corner bracket with a maximum spacing of 24”. Avoid door stop screw locations. (Fig. E) Drill Mounting Holes 1. Clamp frame to opening, or remove from opening. REV CHALK LINE FOR ALIGNMENT MISC 8. Slide or tip frame into rough opening, with vertical mullions seated MISCELLANEOUS over mullion brackets. (Fig. D) LOCATE FRAME ANCHORING HOLES UNDER STOP E ThilgeAD 24.000 MAX 2. Drill through holesDATE for anchors, making sureDRdrill is perpendicular to DESCRIPTION CK REV the frame. Through holes be 1/16” diameter than screw DR: should ThilgeAD CK: ThilgeADlarger TITLE: shank. (Fig. F) TOLERANCE: UNLESS OTHERWISE SPECIFIED 4.000 MAX. ELEVATION 3. Enlarge hole under door MARK stops and glass stops to allow access for ANCHOR HOLE LOCATIONS DEC .031 screw head and ANG screw .5 driver at all anchor locations. 1/32 A SH.NO. 1 OF 1 DWG NO. SCALE: 15:128 DATE: FIG_B 01-14-14 FRAC SH SZ: Install Frame Into Wall 5/16" MIN. 1. Determine location of frame in opening width. Reference architectural drawings for required placement. Set frame in determined location and snap a chalk line along the door hinge side to help determine the frame location on the face side. NOTE: MULLION BRACKETS WERE SET EARLIER. ACCESS HOLE FOR FASTENER 2. Locate frame in opening. 3. Install setting spreader bar (set at correct width) at the bottom of the door opening using wood spreader bar or PLS (Plumb – Level – Square) tool. (Fig. G) F 4. SPREADER BAR REV SH SZ: SCALE: SHIM A 06-01-16 REV DATE TT TT DESCRIPTION DR CK ThilgeAD DEC ANG FRAC SH SZ: SCALE: H TT DR CK ThilgeAD - TOLERANCE: UNLESS OTHERWISE SPECIFIED DEC ANG FRAC SPREADER BAR .031 .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_F_SL 1:16 DATE: 05-11-16 DRSCALE: CK ThilgeAD - 7. Align hinge jamb to the chalk line and confirm hinge jamb is level and plumb. (Fig. J) Anchor hinge jamb to wall. Drill appropriate size and depth holes (per fastener manufacturer’s instructions) for one-piece anchor bolts. Drilling and anchoring each anchor one at a time is recommended. Insert anchor bolt into hinge jamb starting with the bottom bolt and tighten securely following bolt manufacturer’s recommended torque. Install top bolt in the hinge jamb next, checking frame alignment before installing. Install balance of bolts on the hinge side, checking for frame alignment as each bolt is secured. REV TOLERANCE: UNLESS OTHERWISE SPECIFIED STRIKE SIDE OF ELEVATION TT DESCRIPTION 6. Level the header, if not level, by shimming under bottom of vertical frame members as needed. (Fig. I) RUN TOP HORIZONTAL RAIL THRU. DR: ThilgeAD CK: TITLE: STRIKE SIDE OF ELEVATION RUN TOP HORIZONTAL RAIL THRU. ENLARGE ANCHOR HOLES .031 .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_C 1:2 DATE: 01-14-14 LEVEL SHIM DATE DR: ThilgeAD CK: TITLE: DESCRIPTION DR: ThilgeAD CK: TITLE: TOLERANCE: UNLESS OTHERWISE SPECIFIED FRAC 06-01-16 SH SZ: DATE ANG A REV 5. Tip: Use tapered shims between frame and wall (above the holes for bolts) and spreader bar to maintain squareness and alignment of frame, and to maintain door opening sizes. ELEVATION G DEC Shim bottom of frame on the lock side to keep hinge side tight to wall. If gap is greater than 1/4”, add shims to opposite (hinge) jamb to reduce gap. Use shims to tighten frame to spreader bar width, make sure frame is snug against the spreader bar. This prevents twist in the frame. (Fig. H) SHIM STRIKE SIDE .031 .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_G_SL 1:16 DATE: 05-11-16 I DATE DESCRIPTION DR: ThilgeAD CK: TITLE: DR ThilgeAD CK - TOLERANCE: UNLESS OTHERWISE SPECIFIED 8. Tape string (tape string to face of frame in opposite corners running diagonally) to check alignment of frame. Keep in mind you may need to move one string from inside to the outside to ensure correct alignment. Helpful Hint: keep strings on frame until the frame is completely anchored. (Fig. K) DEC ANG FRAC SH SZ: SCALE: LEVEL .031 .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_H_SL 1:16 DATE: 05-11-16 9. Check alignment of frame with cross strings. 10.Plumb and square the other jamb, and shim if necessary. Shims used should be located immediately above the anchor points. 11. Anchor second jamb to wall, installing bolts in the same sequence as previous jamb. Check center of frame for correct width before installing center bolts. Shim as necessary to maintain correct opening width. LEVEL 12.Check to see if shims are required between header and wall. Remember to place shims near anchor points. A 06-01-16 REV DATE RUN TOP HORIZONTAL RAIL THRU. TT TT DESCRIPTION DR CK DR: ThilgeAD CK: TITLE: HINGE SIDE OF ELEVATION J 101 Ashbridge Circle Woodbridge, Ontario Canada L4L 3R5 Tel: 416.749.2111 Toll Free: 800.263.7515 Fax: 905.851.8346 www.flemingdoor.com TOLERANCE: UNLESS OTHERWISE SPECIFIED DEC ANG FRAC SH SZ: SCALE: ThilgeAD - A 06-01-16 REV DATE .031 .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_I_SL 1:16 DATE: 05-11-16 K DESCRIPTION DR: ThilgeAD CK: TITLE: TT DR ThilgeAD TT CK - 14.Reapply door stops that were removed in step 2 of “Mark frame pieces.” TOLERANCE: UNLESS OTHERWISE SPECIFIED DEC ANG LEVEL HINGE SIDE RUN TOP HORIZONTAL RAIL THRU. 13.Anchor head in the same way as jambs. FRAC SH SZ: SCALE: ALIGNMENT CHECK .031 .5 1/32 A SH.NO. 1 OF 1 DWG NO. FIG_K_SL 1:16 DATE: 05-11-16 15.Apply glass stops using screws provided, by predrilling into frame with 1/8” bit. Seal Frame 1. Apply caulk along frame edges and stops in exterior applications. 2. If threshold is required, set threshold in caulk to prevent leakage. Shim threshold if necessary. Fleming is a brand associated with ASSA ABLOY Door Group Inc., an ASSA ABLOY Group company. Copyright© 2016, ASSA ABLOY Door Group Inc. All rights reserved. Reproduction in whole or in part without the express written permission of ASSA ABLOY Door Group Inc. is prohibited. FLE-501-06/16