foundation foundation base mounted traffic signal controller cabinet

advertisement
36"
1
6
"
1
6
"
30"
Vented aluminum cabinet
Vented aluminum cabinet
with base mounting
with base mounting
shall be Type M-36
49" to 52"
49" to 52"
shall be Type M-30
A
A
Base Adapter
Base Adapter
(spacer if required)
A
(spacer if required)
A
See "Section A-A"
See "Section A-A"
Sheet 3 of 4
15"
15"
Sheet 3 of 4
BASE MOUNTED TRAFFIC SIGNAL CONTROLLER CABINET
BASE MOUNTED TRAFFIC SIGNAL CONTROLLER CABINET
Bushings required on all conduits
Bushings required on all conduits
3" spacing between conduits (typ)
3" spacing between conduits (typ)
Refer to contract documents for the
Cap any unused conduit (s)
Ground wire
Refer to contract documents for the
Cap any unused conduit (s)
finished concrete surface requirement
finished concrete surface requirement
Ground wire
for foundations.
for foundations.
NOTE:
NOTE:
Bolt pattern to manufacturer's
Bolt pattern to manufacturer's specifications
24"
22"
min
min
(2) required.
24"
22"
min
min
specifications (2) required.
(4) 3" schedule 80 PVC conduits (min)
(4) 3" schedule 80 PVC conduits (min)
or as shown on the plans
40" MIN
1 1/2" schedule 80 PVC
1 1/2" schedule 80 PVC
42" MIN
42" MIN
rigid metal conduit
rigid metal conduit
#6 or larger stranded copper
PLAN
PLAN
ground wire with 18" slack above
Grade level
foundation.
#6 or larger stranded copper
Grade level
1 1/2" schedule 80
3/4"x 42" galvanized foundation
PVC conduit
bolts, nuts & washers (2 required)
Handhole
or as shown on the plans
40" MIN
ground wire with 18" slack above
foundation.
1 1/2" schedule 80
3/4"x 42" galvanized foundation
PVC conduit
3"
bolts, nuts & washers (2 required)
3 1/2"
Handhole
3"
3 1/2"
36"
42"
36"
42"
Use non-solder
type connection
Ground wire
ELEVATION
Gravel
3/4" x 10'-0" copper clad
Use non-solder
Grounding system shall measure 10 ohm
type connection
or less to ground, with a 10' (min)
ground rod(s) a variable distance
from foundation as directed
NOTE:
FOUNDATION
by Engineer and in accordance
Ground wire
spacing between ground rods.
ELEVATION
Gravel
3/4" x 10'-0" copper clad
Grounding system shall measure 10 ohm
ground rod(s) a variable distance
with the current N.E.C.
or less to ground, with a 10' (min)
from foundation as directed
File:PW:RD/TR/Signals/WC SD/Final
NOT TO SCALE
FOUNDATION
by Engineer and in accordance
Rev. 10/21/14
NOTE:
spacing between ground rods.
with the current N.E.C.
MICHIGAN DEPARTMENT OF TRANSPORTATION
BUREAU OF HIGHWAYS DELIVERY STANDARD PLAN FOR
ENGINEER OF DELIVERY
Michigan Department of Transportation
PREPARED BY
BASE MOUNTED T.S.
CONTROLLER CABINET/FOUNDATIONS
TRAFFIC AND SAFETY
ENGINEER OF DEVELOPMENT
(SPECIAL DETAIL)
DRAWN BY:
FHWA APPROVAL DATE
CHECKED BY:
WC-045-A
PLAN DATE
SHEET
1 of4
AS-LET PLAN REVISIONS
NO.
DATE
AUTH
DESCRIPTION
NO.
DATE
NOT TO SCALE
MICHIGAN DEPARTMENT OF TRANSPORTATION
BUREAU OF HIGHWAYS DELIVERY STANDARD PLAN
File: PW:RD/TR/Signals/WC SD/Final
DATE:
AUTH
DESCRIPTION
FILE:
TSC:
FHWA APPROVAL DATE
Rev. 10/21/14
CS:
DESIGN UNIT:
Michigan Department of Transportation
(SPECIAL DETAIL)
JN:
WC-045-A
PLAN DATE
SHEET
2 of4
DRAWING
SHEET
2
6
"
Vented aluminum cabinet
with base mounting
30"
24" to 30"
shall be Type NEMA 6
48"
55" TO 58"
2
5
.
5
"
t
o
44"
Controller
Controller
Foundation
Pad
3/4" x 2 1/2" galvanized
bolts, nuts & washers
(4 required)
Washer
A
A
Base Adapter
(spacer if required)
A
A
r
Doo
30"
Lock washer
15"
TOP VIEW
ted
oun
e M
Bas
ler
rol
t
n
Co
t
ine
Cab
Nut
SECTION A-A
3" above
Grade Level
"
48
BASE MOUNTED TRAFFIC SIGNAL CONTROLLER CABINET
er
roll
Cont
Pad
Bushings required on all conduits
Top of pad
Refer to contract documents for the
3" spacing between conduits (typ)
Cap any unused conduit (s)
1"
Grade Level
Controller Pad
4"
3"
finished concrete surface requirement
3"
for foundations.
Ground wire
4"
NOTE:
Bolt pattern to manufactures
30"
28"
min
min
specifications (4) required.
(4) 3" schedule 80 PVC conduits
46" MIN
1 1/2" schedule 80 PVC
48" MIN
rigid metal conduit
Controller
#6 or larger stranded copper
PLAN
SIDE VIEW
Foundation
ground wire with 18" slack above
Grade level
foundation.
1 1/2" schedule 80
3/4"x 42" galvanized foundation (4) bolts,
PVC conduit
(8) nuts & (8) washers (required)
Handhole
BASE MOUNTED CONTROLLER PAD
3"
3 1/2"
NOTE:
Payment for controller pad to be included in controller
36"
42"
foundation pay item.
Controller cabinet door to open toward pad.
NOTE:
Use non-solder
Grounding system shall measure 10 ohm
type connection
or less to ground, with a 10' (min)
Ground wire
spacing between ground rods.
ELEVATION
Gravel
3/4" x 10'-0" copper clad
ground rod(s) a variable distance
from foundation as directed
FOUNDATION
by Engineer and in accordance
with the current N.E.C.
NOT TO SCALE
NOT TO SCALE
MICHIGAN DEPARTMENT OF TRANSPORTATION
BUREAU OF HIGHWAYS DELIVERY STANDARD PLAN
File: PW:RD/TR/Signals/WC SD/Final
(SPECIAL DETAIL)
MICHIGAN DEPARTMENT OF TRANSPORTATION
FHWA APPROVAL DATE
Rev. 10/21/14
WC-045-A
PLAN DATE
SHEET
3 of4
AS-LET PLAN REVISIONS
NO.
DATE
AUTH
DESCRIPTION
NO.
DATE
BUREAU OF HIGHWAYS DELIVERY STANDARD PLAN
File: PW:RD/TR/Signals/WC SD/Final
DATE:
AUTH
DESCRIPTION
FILE:
TSC:
FHWA APPROVAL DATE
Rev. 10/21/14
CS:
DESIGN UNIT:
Michigan Department of Transportation
(SPECIAL DETAIL)
JN:
WC-045-A
PLAN DATE
SHEET
4 of4
DRAWING
SHEET
Download