Nama Matapelajaran: Makmal Tahun 4
Kod Matapelajaran : SEE 4722
:1
: 2003
: 2009
: PK-UTM-FKE-(0)-10
SEE 4722
FAKULTI KEJURUTERAAN ELEKTRIK
UNIVERSITI TEKNOLOGI MALAYSIA
KAMPUS SKUDAI
JOHOR
ADVANCED POWER LABORATORY
STUDENT PACK
Open Circuited Distribution Line
Disediakan oleh :
Nama
: PM. Dr Azhar Khairuddin
Disahkan oleh : Ketua Jabatan
: Prof. Madya Dr. Mohd Wazir
Nama
b. Mustafa
Prof. Ir. Dr. Abdullah
Asuhaimi Mohd Zin
Tandatangan
Cop
:
:
Tandatangan
Cop
:
:
Tarikh
: 6 Julai 2009
Tarikh
: 15 Julai 2009
1.
Problem/Project Guide:
- The students have to study three phase systems.
-
Understand balanced and unbalanced loads.
-
Simulate the distribution system using suitable software and justify your answer with experimental results.
The student have to accomplish their task within four weeks time. As guide, students may follow the problem
solving time-line as given in table below.
(a) Problem-solving Time-line
Activities
Week 1 Week 2 Week 3 Week 4
1. Understand/Identify/Brainstorming
2. Design/Modeling
3. Experiments/Testing/Measurement
4. Demo/Report Writing
Assessment criteria are standardized for all laboratories and will generally be the same for all laboratories. Fof
further understanding about the assessment criteria, please refer to PBL Fourth-year Laboratory Assessment
document.
(b) Report Writing
Other than the general guide specified by the Laboratory Coordinator, the report must include:
ƒ
ƒ
ƒ
ƒ
ƒ
Experimental Procedures
Experimental Data
Photographs of the actual circuit construction
Circuit diagram
Photographs of your group members
Part of the student assessment will include reporting of their weekly activities and the log book.
(c) Questions That Can Help You Tackle The Problem
1.
What is three phase four wire feeder?
2.
When this type of feeder is important and why?
3.
Why a three phase load becomes unbalanced?
2
2.
Equipments list:
(a) The Distribution Trainer NE9202 which is located in Advanced Power Laboratory. Manual for the
Distribution Trainer is available at the laboratory.
(b) Other resource:
http://www.tq.com
3.
Components List:
(a) Cable connected
4.
Software:
(a) Power World
5.
Additional resources:
6.
References:
Power World Introduction Manual