Hydro One’s LDC DG Connection Review • Toll Free Dial In Number: 1-855-353-9183 • Toronto Dial In Number: 416-623-0333 • Participant Pass Code: 41364# August 16, 2012 1 Agenda for Today 1. Overview of Hydro One’s LDC DG approval process using examples 2. Review of Tx Capacity limitations 3. Review of DAT coordination with LDC’s 4. Review of the DG connection authorization process 5. Q & A Session 2 LDC Feeder Supply Types LDC owned • • • • Owned by the LDC up to the TS Billed by the IESO Listed in TCA Schedule A Monitoring for > 500 kW Shared • • • • Hydro One owned to LDC boundary Supplies other H1 customers Listed in DCA Schedule D Monitoring for > 250 kW Express • • • • Hydro One owns a section from the TS (usually outside LDC) Only serves one LDC (no other load) Listed in DCA Schedule D Monitoring for > 500 kW 3 LDC CIA Example #1 • 200 kW Small FIT (CAE) • Solar (Inverter based) • Connecting to an LDC owned feeder • No H1 DAT required 4 Tx Constraints and Upgrades Presented by: Bing Young, Director of System Development 5 Transmission Constraints & Upgrades • Transmission Constraints Overview 1) Transformer station constraints 2) 115kV short circuit constrained areas 3) Other upstream transmission constraints a. Local limitations b. Area limitations • Update on Transformer Station upgrades • Update on other transmission upgrades 6 Threshold CIA Option Presented by: Stan Dafoe, Senior Account Executive 7 Threshold CIA Option At Hydro One discretion: • Allocates1 MW (min) of capacity per TS bus • Available for LDC owned & express feeders • One Small FIT project required for TCIA • LDC may connect one or more inverter based Small FIT’s • 6 month, renewable term • 2 MW capacity must remain at the TS • Connection authorization required for each project 8 LDC CIA Example #1 • 200 kW Small FIT (CAE) • Solar (Inverter based) • Connecting to an LDC owned feeder • No H1 DAT required • Qualifies for Threshold CIA (LDC owned feeder) 9 Threshold CIA (TCIA) Process • LDC applies for TCIA for an entire TS bus • No Charge for TCIA • LDC provides P. Eng. stamped LDC Form B • LDC allocated 1 MW+ on one TS bus • No monitoring required (<500 kW, LDC feeder) • Coordinate with OGCC as project connects • Sign Letter of Equivalency post connection 10 TCIA Report Connection Authorization Presented by: Stan Dafoe, Senior Account Executive 12 Connection Authorization for TCIA DG’s Pre-connection (6 days in advance) • Contact your OGCC outage planner (per operating schedule A or D) • Provide “draft” (unsigned) Letter of Equivalency (LoE) • Provide Single Line Diagram (SLD) & Nomenclature 13 Connection Authorization for TCIA DG’s Post connection • LDC submits signed LoE after commissioning • LOE signed by the P. Eng. or LDC officer • DG info captured in OGCC NMS system • Operating schedule A or D updated 14 Date: Letter of Equivalency - Confirmation of Verification Evidence Report (COVER) [Insert name of LDC] acknowledges that the embedded connection of [Insert H1 CIA Project Reference] does not materially adversely affect the safety, reliability and efficiency of the distribution system and meets the technical requirements specified in Appendix F.2 of the Distribution System Code, in accordance with section 6.2.25 of the Distribution System Code. [Insert name of LDC] verifies that the embedded connection of [Insert H1 CIA Project Reference] has been properly commissioned in accordance with Appendix F.1 of the Distribution System Code. Existing feeder protections are confirmed to be suitable within the stated terms of the CIA. Please reference the project data below for your operational schedules. Name of Facility (Generator) OPA Contract Number (if applicable) Generator Site LDC Operating Designation Proposed Energization Date Supply TS Supply Feeder(s) Designation Generator Site Legal Address Instructions: The letter is to be provided on LDC letterhead by a LDC employee or agent acting on behalf of the LDC. The equivalency letter needs to be signed by a Professional Engineer registered in the Province of Ontario or a LDC Officer. • Please file with the Business Call Centre at DXGENERATIONCONNECTIONS@hydroone.com along with a copy to the applicable control authority Outage Planner identified in your Connection Agreement Operating Schedule A/D. Unless otherwise specified for “M” designated feeders, this will be the Network Operating Division, for “F” designated feeders, this will be the appropriate provincial Lines Zone Scheduler. Check your Schedule for the appropriate contact numbers and email addresses. • For projects over 250 KW, an “as constructed’ single line drawing of the generators facility should be included with this letter. Signature Name PEO ID (if applicable) Renewal/Expiry of TCIA • Reminder letter sent at 5 months • LDC can renew TCIA or let it expire • Submit updated original application to renew - including project listing • Or on expiry provide the list of DG’s connecting 16 Individual CIA Option Presented by: Stan Dafoe, Senior Account Executive 17 LDC Individual CIA Example • 400 kW Small FIT (CAE) • Solar (Inverter based) • Connecting to Hydro One shared feeder • LDC is embedded in Hydro One • Hydro One DAT is required (shared feeder) • Monitoring is required (>250 kW, shared feeder) 18 Hydro One’s Approach to the Distribution Availability Test (DAT) Presented by: Martin Huneault, Coordinator for Generation Connections Presented by: Alexander Hamlyn, Engineer with Generation Connections All DAT request will come through the OPA Portal (FAME) 20 Communication between Hydro One and Upstream LDCs Example 1: Hydro One Application to a Upstream LDC (Shared Feeder) TS Hydro One Upstream LDC DG •~ • DG is listed in Hydro One territory (FAME) • Hydro One will communicates with upstream LDC to request completion of a DAT – Hydro One to send letter to Upstream LDC (CC. Account Executive) • Upstream LDC performs a DAT and communicates result to Hydro One • Hydro One uploads result to FAME Communication between Downstream LDC and Upstream (Hydro One) Example 2: Downstream LDC Application to Hydro One (Shared Feeder) TS Hydro One Downstream LDC DG •~ • DG is listed in the Downstream LDC’s Territory in FAME • Downstream LDC communicates with Hydro One to request completion of a DAT – Downstream LDC to send letter to Hydro One • Hydro One performs a DAT and communicates result to Downstream LDC • Downstream LDC uploads result to FAME Communication between Downstream LDC and Upstream (Hydro One) Example 3: Downstream LDC Application to Hydro One (Express Feeder) TS Downstream LDC DG • DG is listed in the Downstream LDC’s Territory in FAME • Downstream LDC communicates with Hydro One. – • Downstream LDC to send letter to Hydro One Hydro One will assess our portion of the feeder and relay that information to the Downstream LDC • •~ Downstream LDC uploads result to FAME Contact information for all DAT requests for Hydro One: gcdcoordinator@hydroone.com Individual CIA Application Presented by: Stan Dafoe, Senior Account Executive 25 LDC Individual CIA Process • Specific to only ONE DG project • $3000 CIA fee for Small FIT (CAE) • LDC submits individual CIA application form • LDC submits P. Eng. stamped Form B & payment • May incur project costs (Class C estimate) • Monitoring required if shared feeder >250 kW • LOE & Teleprotection Verification Report (TVR) 26 CIA Report Connection Cost Agreement (CCA) • Required 6 month’s from CIA sent date (DSC) • LDC must apply to the BCC for a CCA • Full payment for estimated costs required at time of execution • Hydro One Project Manager (PM) assigned • PM initiates kick-off meeting and Hydro One connection process 28 Connection Cost Recovery Agreement (CCRA) • For LDC owned feeders (Tx connected) • LDC should apply for CCRA • Payment for estimated costs required on execution • Negotiated by AE • PM initiates kick-off meeting and Hydro One connection requirements 29 Monitored Connection Process • PM administers: Single Line Diagram (SLD) Nomenclature Letter of Equivalency (LoE) Teleprotection Verification Report (TVR) Data captured in OGCC NMS system Operating Schedule A or D updated 30 LDC DG Connections – Key Points • Check Capacity (OPA website/Restricted Stations/DAT) • Consider a Threshold CIA for LDC & Express feeders • DAT is required for embedded feeders • Contact the OGCC before connecting • A Letter of Equivalency is required for all LDC DG connections • A TVR report is required for monitored projects 32 Thank You Please stay in touch with your Account Executive and monitor www.HydroOne.com for future developments. We will now take questions. 33