Local Distribution Company (LDC) Form B LDC Individual Generation Assessment Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) General Application Information Applicants This Application form is to be used only by a Distributor (“LDC”) to apply to Hydro One for a Connection Impact Assessment (“CIA”) or Detailed Technical Connection Assessment (“DTCA”) on behalf of a generation proponent connecting to the LDC’s Distribution System. This application is to be accompanied with the LDC’s generation connection application as completed by the generation proponent, which must provide the minimum information requirements listed in Appendix A and, if applicable, Appendices B, C and D of this application form. Technical Requirements For technical requirements of Hydro One’s FIT projects, refer to the “Distributed Generation Technical Interconnection Requirements Interconnections at Voltages 50kV and Below” available at: http://www.hydroone.com/Generators/Pages/TechnicalRequirements.aspx. Application Submission Instructions Please return the completed form, fees and other required documents by mail to: Hydro One Networks Inc. Attn: Dx Generation Connections Generation Connection Application 185 Clegg Road Markham, Ontario L6G 1B7 Important Notes Applicants are cautioned NOT to incur major expenses until Hydro One approves to connect the proposed generation facility. All technical submissions (Form B, Single Line Diagrams, etc.) must be signed and sealed by a licensed Ontario Professional Engineer (P.Eng.). All fields below are mandatory, except where noted. Incomplete applications may be returned by Hydro One Networks Inc. (“Hydro One”). Failure to provide the minimum information requirements will result in delays in processing your application. If you are applying for connection of a Load Displacement or Energy Storage facility, the assessment performed by Hydro One is a Detailed Technical Connection Assessment (“DTCA”). For such facilities, the term Connection Impact Assessment (“CIA”) as it appears throughout this Form B shall be interpreted to mean Detailed Technical Connection Assessment (“DTCA”). If you have any questions please e-mail Hydro One’s Business Customer Centre at dxgenerationconnections@hydroone.com or call 1-877-447-4412 (Option# 2) 8 : 3 0 am to 5:00 pm Mon to Fri). Hydro One LDC Individual Generation Assessment Form (LDC Form B) Rev.4, May 21, 2014 Page 1 of 6 Local Distribution Company (LDC) Form B LDC Individual Generation Assessment Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Section A – Administrative Information New Application Revision/Rework Reconnection of an existing generator FIT Load Displacement Energy Storage Net Metering Application Type: (choose one) Date (mm / dd / yyyy): Program Type: (choose one) 1. Contact Information Legal Name of LDC: Contact Person: Mailing Address Line 1: Mailing Address Line 2: Telephone: Cell: Fax: E-mail: Preferred method of communication with Hydro One E-mail Telephone Mail Fax Section B – Project Information 1. Generation Proponent Name: 2. Energy Source (choose one) Biomass Solar (PV) Gas Turbine Other (please specify) Wind Diesel Engine Water 3. Generator Nameplate Capacity: kW 4. Feed-In-Tariff (FIT) Contract Number (if applicable): 5. Connection to Hydro One Transformer Station Feeder Voltage: kV Transformer Station: LDC feeder selection conductor information (from TS, or from the territory boundary between the LDC and Hydro One, to the Generator location, including conductor length and type) 6. Feeder owned entirely by the LDC? 7. Existing Generator Information: 8. LDC Form B: Feeder Designation: LV Bus Designation: Yes No If any part of the LDC’s distribution system that is downstream from the above TS, includes existing or proposed queue generators, the LDC must provide details of that generation in the attached Appendix B. Please attach one copy of your company’s completed Form B as submitted by your generation proponent including an Engineer’s stamp. The Form B must include all the minimum information requirements noted in Appendix “A”. Hydro One LDC Individual Generation Assessment Form (LDC Form B) Rev.4, May 21, 2014 Page 2 of 6 Local Distribution Company (LDC) Form B LDC Individual Generation Assessment Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Section C – Checklist 9. Please ensure the following items are completed prior to submission. Your application will not be processed if any part is omitted or incomplete: □ Payment in full including applicable taxes (by cheque* or money order payable to “Hydro One Networks Inc.”) □ LDC Form B stamped by a Professional Engineer Single Line Diagram with P. Eng. Stamp □ Listing of existing generation (Appendix B) □ Minimum information for Load Displacement or Energy Storage Facilities (Appendices C or D) (if applicable) A CIA or DTCA Study Agreement must be included with this application, must be original signed hardcopy document (must not be electronic signature). *Note: if the payment cheque for the CIA fee is from your customer instead of the LDC, the cheque must be certified. Hydro One LDC Individual Generation Assessment Form (LDC Form B) Rev.4, May 21, 2014 Page 3 of 6 Local Distribution Company (LDC) Form B LDC Individual Generation Assessment Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Appendix A – LDC Generation Application Minimum Requirements 1. The following sections/items in the LDC Generation Application are mandatory: a) b) c) d) e) 2. Generation Characteristics – The following items are required: a) b) c) d) e) f) g) h) 3. Project Name FIT Contract Number Project size Project location Single Line Diagram with P. Eng. Stamp Number of generating units Manufacturer/type or model No. Rated capacity for each unit Rated frequency Generator terminal connection Nominal machine voltage Direct axis subtransient reactance, Xd” Direct axis transient reactance, Xd’ Interface Step-Up transformer characteristics (all items are required) a) b) c) d) e) f) g) Transformer rating (kVA) Nominal voltage of high voltage winding (kV) Nominal voltage of low voltage winding (kV) Transformer type (single or three phase) Impedances on kVA & kV base (R pu, X pu) High voltage winding connection (delta/star) Grounding method of star connected high voltage winding neutral (Solid/ Ungrounded & Impedance - R & X ohms) h) Low voltage winding connection (delta/star) i) Grounding method of star connected low voltage winding neutral (Solid/ Ungrounded & Impedance - R & X ohms) NOTE: The term ‘High Voltage’ refers to the connection voltage to Hydro One’s distribution system and ‘Low Voltage’ refers to the generation or any other intermediate voltage. 4. Intermediate Transformer Characteristics (if there are intermediate transformers (all items are required) No intermediate transformer (if chosen, parts a. to g. below are optional) a) Transformer rating (kVA) b) Nominal voltage of high voltage winding (kV) c) Nominal voltage of low voltage winding (kV) d) Transformer type (single or three phase) e) Impedances on kVA & kV base (R pu, X pu) f) High voltage winding connection (delta/star) g) Grounding method of star connected high voltage winding neutral: (Solid, Ungrounded & Impedances –R & X ohms h) Low voltage winding connection: (delta, star) i) Grounding method of star connected low voltage winding neutral: NOTE: The term ‘High Voltage’ refers to the intermediate voltage that is input to the interface step-up transformer and the ‘Low Voltage’ refers to the generation voltage. Hydro One LDC Individual Generation Assessment Form (LDC Form B) Rev.4, May 21, 2014 Page 4 of 6 Local Distribution Company (LDC) Form B LDC Individual Generation Assessment Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Appendix B – Existing Generation Listing (Generation > 10kW supplied from the TS) Generator TS Feeder Generation Name Type Total Nameplate Capacity Comments Appendix C – Supplemental information for Load Displacement Facilities Minimum Generation Output information required for Load Displacement Generation Facilities Load of Facility (kW) Load of Facility (kVAR, lead or lag) Minimum Load Maximum Load Hydro One LDC Individual Generation Assessment Form (LDC Form B) Rev.4, May 21, 2014 Page 5 of 6 Generation Output (kW) TS( Generation Output (kVAR, lead or lag) ) Local Distribution Company (LDC) Form B LDC Individual Generation Assessment Application Hydro One Distributed Generation Group | DxGenerationConnections@HydroOne.com | 1-877-447-4412 (Option 2) Appendix D – Supplemental information for Energy Storage Facilities What will be the control strategy of the Energy Storage Facility: Peak Shaving Description of Control Strategy When operating as a load Switch In Time Switch Out Time Load kW (peak) Load kVAR (peak, leading/lagging) When operating as a generator Switch In Time Switch Out Time Generation kW (peak) Generation kVAR (peak, leading/lagging) Dynamic VAR Support Description of Control Strategy Switch In Condition Switch Out Condition Generation kW (peak) Generation kVAR (peak, leading/lagging) Frequency Support Description of Control Strategy Switch In Condition Switch Out Condition Generation kW (peak) Generation kVAR (peak, leading/lagging) Other Note: Please attach a detailed description of the proposed control mode. Hydro One reserves the right to modify the control strategy as part of its Detailed Technical Connection Assessment. Hydro One LDC Individual Generation Assessment Form (LDC Form B) Rev.4, May 21, 2014 Page 6 of 6