Due Date/Time: 15/10/2015 15:00
STORES/ECOR, for & on behalf of The President of India, Invites electronic tenders for the following items.
Tender No :
Tender Doc. Cost (INR) :
Date/time of uploading :
Pre-Bid Query Date Time:
Validity of Offer(Days) :
Inspection Agency:
04157085
2500.00
14/09/2015 11:17
Not Applicable
120
RITES
Tender Title :
Payment Terms :
Instructions/Remarks:
Fabricated and Galvanized Steel Structures as per details given against each item.
As per ECOR Document available in website www.ireps.gov.in
[1] Firm to provide Bank Account Number detail for NEFT payment. Firm if have account in Bank without e payment enables, they should open account in Bank with epayment facility. [2] Firms to quote with tender cost and signed tender schedule.
Evaluation Criteria :
Earnest Money (INR):
Tender Closing Date Time :
Bidding System :
Delivery Schedule :
Itemwise/Consigneewise
500000.00
15/10/2015 15:00
Single Bid System
within 02 to 03 months
A. Item Details
S.No.
PLNO(Item Code)
Item Description
Quantity
Unit
Consignee
1
NS01
Fabricated and Galvanized B Series Steel Structures B-150 with batten plates as per RDSO
Drg No ETI/C/0071, Rev-E or latest using fabricators own steel and Zinc, Steel Conforming
to IS:2062:2011, IS:800, Gr-E 250 [Fe 410W] quality A and IS 808/1989 and Zinc to
IS:209/1992 and RDSO Spec No ETI/OHE/13 [4/84] with A and C slip Nos 1,2 and 3 for
galvanization. Each B-150 mast of 9.5 mtrs length with approx wt of 369.69 Kgs, MC 150
shall be used.
695.02 Metric Tonne
SSEE/C/OHE/ANGUL
2
NS02
Fabricated and Galvanized B Series Steel Structures B-150 with batten plates as per RDSO
Drg No ETI/C/0071, Rev-E or latest using fabricators own steel and Zinc, Steel Conforming
to IS:2062:2011, IS:800, Gr-E 250 [Fe 410W] quality A and IS 808/1989 and Zinc to
IS:209/1992 and RDSO Spec No ETI/OHE/13 [4/84] with A and C slip Nos 1,2 and 3 for
galvanization. Each B-150 mast of 9.5 mtrs length with approx wt of 369.69 Kgs, MC 150
shall be used.
24.77 Metric Tonne
SSE/RRD/OHE/SCMN
3
NS03
Fabricated and Galvanized B Series Steel Structures B-175 with batten plates as per RDSO
Drg No ETI/C/0071, Rev-E or latest using fabricators own steel and Zinc, Steel Conforming
to IS:2062:2011, IS:800, Gr-E 250 [Fe 410W] quality A and IS 808/1989 and Zinc to
IS:209/1992 and RDSO Spec No ETI/OHE/13 [4/84] with A and C slip Nos 1,2 and 3 for
galvanization. Each B-175 mast of 9.5 mtrs length with approx wt of 422.89 Kgs, MC 175
shall be used.
283.34 Metric Tonne
SSEE/C/OHE/ANGUL
4
NS04
Fabricated and Galvanized B Series Steel Structures B-200 with batten plates as per RDSO
Drg No ETI/C/0071, Rev-E or latest using fabricators own steel and Zinc, Steel Conforming
to IS:2062:2011, IS:800, Gr-E 250 [Fe 410W] quality A and IS 808/1989 and Zinc to
IS:209/1992 and RDSO Spec No ETI/OHE/13 [4/84] with A and C slip Nos 1,2 and 3 for
galvanization. Each B-200 mast of 9.5 mtrs length with approx wt of 474.19 Kgs, MC 200
shall be used.
225.88 Metric Tonne
SSEE/C/OHE/ANGUL
This is digitally signed document
Page 1 of 3
Run DateTime: 14/09/2015 11:18:03
STORES/ECOR
Tender Document For Tender No
: 04157085
Due Date/Time: 15/10/2015 15:00
5
NS05
Fabricated and Galvanized B Series Steel Structures B-200 with batten plates as per RDSO
Drg No ETI/C/0071, Rev-E or latest using fabricators own steel and Zinc, Steel Conforming
to IS:2062:2011, IS:800, Gr-E 250 [Fe 410W] quality A and IS 808/1989 and Zinc to
IS:209/1992 and RDSO Spec No ETI/OHE/13 [4/84] with A and C slip Nos 1,2 and 3 for
galvanization. Each B-200 mast of 9.5 mtrs length with approx wt of 474.19 Kgs, MC 200
shall be used.
14.23 Metric Tonne
SSE/RRD/OHE/SCMN
6
NS06
Fabricated and Galvanized Steel Structures [TTC 5.5 M Boom] as per RDSO Drg No
ETI/C/0009/69 [Sht 2,3 and 5 Rev C or latest], using fabricators own steel and Zinc, Steel
Conforming to IS:2062/2011, IS:800, Gr-E 250 [Fe 410W] quality A and IS 808/1989 and
Zinc to IS:209/1992 and RDSO Spec No ETI/OHE/13 [4/84] with A and C slip Nos 1,2 and
3 or latest for Galvanization. One set of TTC assembly consists of TTU- 10.135m long-1
No[784.876 Kg], TTK-1 and 2, 1 set [87.668 Kg], TTB 5.5M boom,1 No.[281.271 Kg].
Approximate total wt of one set of TTC [5.5 M Boom] 1.153815 MT. MC 250 mm x 82 mm
and MC 150 mm x 75 mm shall be used.
80.77 Metric Tonne
SSEE/C/OHE/ANGUL
7
NS07
Fabricated and Galvanized Steel Structures [TTC 8.0 M Boom] as per RDSO Drg No
ETI/C/0009/69 [Sht 2,3 and 5 Rev C or latest], using fabricators own steel and Zinc, Steel
Conforming to IS:2062/2011,IS:800, Gr-E 250 [Fe 410W] quality A and IS 808/1989 and
Zinc to IS:209/1992 and RDSO Spec No ETI/OHE/13 [4/84] with A and C slip Nos 1,2 and 3
or latest for Galvanization. One set of TTC assembly consists of TTU,10.135m long-1
No[784.876 Kg], TTK-1 and 2,1 set [87.668 Kg], TTB 8.0M,1 No.[382.560 Kg]. Approximate
total wt of one set of TTC [8.0 M Boom] 1.255104 MT. MC 250 mm x 82 mm and MC 150
mm x 75 mm shall be used.
105.43 Metric Tonne
SSEE/C/OHE/ANGUL
B. Eligibility Criteria
S.No.
1
Description
[1] Railway reserves the right to procure full or bulk quantity from CORE approved sources approved for relevant item[s]. Firm should submit the valid CORE approval certificate. [2] Unloading
at site to be done by the firm with their cost. In case, the firm/firms is/are not agreeing to this condition, their offer[s] is/are liable to be passed over.
C. Special Conditions and Checklist for bidders
S.No.
Description
1
Have you attached any performance statements seperately?
2
I/We agree to supply the tendered stores at the rates quoted by me/us in accordance with the IRS Conditions of Contract and [or] Special and [or] other Conditions specified/attached with the
tender.
3
I/We also confirm that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance. Such terms quoted anywhere else should be
ignored.[Denial of this condition not recommended]
4
Purchaser shall be entitled to increase / decrease the order quantity by 30 percent anytime during the currency of the contract such that the contractor has reasonable time/notice for executing
This is digitally signed document
Page 2 of 3
Run DateTime: 14/09/2015 11:18:03
STORES/ECOR
Tender Document For Tender No
: 04157085
Due Date/Time: 15/10/2015 15:00
such increase/decrease. The increase inquantity with respect to the tender quantity can be done even at the time of ordering and the tenderer shall be bound to accept the quantity so ordered
on the basis of his original offer.The purchaser shall be entitled to exercise plus 30 percent option in one or more than one instalment as long as the total variation in quantity does not exceed
the limit of 30 percent of ordered quantity. Any increase of quantity under option clause after expiry of delivery period can be considered with the consent of the firm/contractor. While operating
option clause, quantity can be ordered on any one of the consignees of Odisha if at least one of the consignees of Odisha exists in the PO for which same rate has been taken
5
Whether you are Large scale Industry or consortia of MSEs formed by NSIC, if yes, please indicate quantum of sub contracts given to Micro and Small Enterprises (in percent of order value)
6
Entry Tax is applicable in state of Odisha Hence firms are advised to quote as per Sr No. 15 of General Condition of Tender in ECoR/Stores
7
SVC if applicable is to be specifically quoted. In case not quoted specifically, the same will not
8
Material to be delivered directly to consignee on door delivery basis or by road on door delivery basis.
9
Splitting clause : Not applicable
10
Price variation clause is applicable details given in the Annexure to the tender.
11
All other terms and conditions as per IRS Conditions and as per
documents available in IREPS Site
be applicable.
ECoR documents available in website www.eastcoastrailway.gov.in and www.ireps.gov.in.[
D. Documents attached with the tender
S.No.
File Name
Document Description
1
NewTenderCondition110515.pdf
NewTenderCondition110515
2
irsconditions.pdf
IRS Conditions of Contracts
3
PVC-Annexureto04157085.pdf
Annexure A-PVC
Corrigenda
Note: Details of corrigendum are shown below. However, data/details in NIT/Tender document is updated duly incorporating all corrigenda issued.
S.No.
Subject
Description
Corrigendum Date/Time
No Corrigendum(s) to display
Note: This tender is governed by Term and Conditions specified and attached document with the tender by Zonal Railways / Production Units.