Installation Overview Document Ref: INS-G1-1T2-REV0 CHARGING Introduction This document gives an overview of installation requirements specific to the EO chargers specified below. This document does not detail general electrical installation procedures, regulations and/or standards that must be conformed to for the region the installation is being performed. Product Variant Generation 1, Single Type 2 socketed Phase Type Single & 3-phase Pre-install Requirements Actions pre-installation Site survey Suitable internet connectivity method (where required e.g. products requiring portal/App access). This could be GSM [built-in charger] (requires suitable/reliable GSM signal strength at proposed charger location) Stand-alone eoModule LAN [sold separately] (requires high speed internet connection with CAT5/6 LAN connection availability) Stand-alone eoModule Dual LAN/GSM [sold separately] (requires high speed internet connection with CAT5/6 LAN connection availability AND suitable/reliable GSM signal strength at proposed eoModule location) Stand-alone eoModule GSM for exterior installation [sold separately] (requires suitable/reliable GSM signal strength at proposed eoModule location) 1 E: hello@eocharging.com T: +44 (0) 333 77 20383 W: eocharging.com Installation Overview Document Ref: INS-G1-1T2-REV0 CHARGING Power distribution capability Kw/Amps Phase type Distance from proposed charger location to distribution board Product usage and feature/functional requirements eoNet = User authentication, usage data, remote access and portal/App access capabilities. Non-eoNet = Open access (no user authentication), no usage data, no remote controls or portal/App access Product Specific Installation Requirements Actions required on ALL installations Installation of the charger mounting plate (to be mounted at between 750mm and 1200mm - unless otherwise specified by the client) 4x fixing points for flat vertical surfaces (suitable fixings based on surface type) OR 2x fixing points when installed to a freestanding post (supplied separately) Connection of supply input connections to the mounting plate terminal block/mounting plate [earth] 3 x connections for single-phase [provision for isolate earthing OR linked to distribution supply is provided] 5x connections for 3-phase [provision for isolate earthing OR linked to distribution supply is provided] Mounting of the main EO charger to mounting plate [main unit is sealed, no internal connections needed or possible] Guided slot-in connection of charger to mounting plate/terminal block Insertion and tightening of the securing machine screw (torx-pin head) Final testing (in addition to the mandated/regulatory tests - the current IET Wiring Regulations BS 7671) Functional confirmation and sign-off via the EO portal Where a unit is a communicating variant the portal will actively confirm tests have been performed and display to the installing engineer in realtime (connection to the internet is required) Actions required optionally - variant and/or installation setup specific Installation of 4-core RS485 data cable (only when using an additional eoModule) Connection of RS485 cabling between all chargers and the eoModule selected. installation of a eoModule to facilitate connection to the internet. NB no additional power connections are required to these devices. EM001 & EM004 - these module must be installed inside and within a reasonable proximity to the existing LAN network connections (<10M) EM002 - this module must be installed inside and with suitable GSM signal availability. EM005 - this module is designed for exterior installation and must have suitable GSM signal availability. 2 E: hello@eocharging.com T: +44 (0) 333 77 20383 W: eocharging.com