Installation Overview
Document Ref: INS-G1-1T2-REV0
CHARGING
Introduction
This document gives an overview of installation requirements specific to the EO
chargers specified below. This document does not detail general electrical
installation procedures, regulations and/or standards that must be conformed to
for the region the installation is being performed.
Product Variant
Generation 1, Single Type 2 socketed
Phase Type
Single & 3-phase
Pre-install Requirements
Actions pre-installation
Site survey
Suitable internet connectivity method (where required e.g. products requiring
portal/App access).
This could be GSM [built-in charger] (requires suitable/reliable GSM signal
strength at proposed charger location)
Stand-alone eoModule LAN [sold separately] (requires high speed
internet connection with CAT5/6 LAN connection availability)
Stand-alone eoModule Dual LAN/GSM [sold separately] (requires high
speed internet connection with CAT5/6 LAN connection availability AND
suitable/reliable GSM signal strength at proposed eoModule location)
Stand-alone eoModule GSM for exterior installation [sold separately]
(requires suitable/reliable GSM signal strength at proposed eoModule
location)
1
E: hello@eocharging.com T: +44 (0) 333 77 20383 W: eocharging.com
Installation Overview
Document Ref: INS-G1-1T2-REV0
CHARGING
Power distribution capability
Kw/Amps
Phase type
Distance from proposed charger location to distribution board
Product usage and feature/functional requirements
eoNet = User authentication, usage data, remote access and portal/App access
capabilities.
Non-eoNet = Open access (no user authentication), no usage data, no remote controls
or portal/App access
Product Specific Installation Requirements
Actions required on ALL installations
Installation of the charger mounting plate (to be mounted at between 750mm and
1200mm - unless otherwise specified by the client)
4x fixing points for flat vertical surfaces (suitable fixings based on surface type)
OR
2x fixing points when installed to a freestanding post (supplied separately)
Connection of supply input connections to the mounting plate terminal
block/mounting plate [earth]
3 x connections for single-phase [provision for isolate earthing OR linked to
distribution supply is provided]
5x connections for 3-phase [provision for isolate earthing OR linked to
distribution supply is provided]
Mounting of the main EO charger to mounting plate [main unit is sealed, no internal
connections needed or possible]
Guided slot-in connection of charger to mounting plate/terminal block
Insertion and tightening of the securing machine screw (torx-pin head)
Final testing (in addition to the mandated/regulatory tests - the current IET Wiring
Regulations BS 7671)
Functional confirmation and sign-off via the EO portal
Where a unit is a communicating variant the portal will actively confirm tests
have been performed and display to the installing engineer in realtime
(connection to the internet is required)
Actions required optionally - variant and/or installation setup specific
Installation of 4-core RS485 data cable (only when using an additional eoModule)
Connection of RS485 cabling between all chargers and the eoModule selected.
installation of a eoModule to facilitate connection to the internet. NB no additional
power connections are required to these devices.
EM001 & EM004 - these module must be installed inside and within a reasonable
proximity to the existing LAN network connections (<10M)
EM002 - this module must be installed inside and with suitable GSM signal availability.
EM005 - this module is designed for exterior installation and must have suitable GSM
signal availability.