IAS BepiColombo Simbio-Sys / ME I. FRONT PAGE BepiColombo SIMBIO-SYS ME Shock test specification January 20th, 2012 Issue: 01 Revision: 02 BC-SIM-ORS-TS-002 IAS orsay orsay Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: II BepiColombo Simbio-sys / ME II. THIS DOCUMENT "MANAGEMENT PAGE" Title: BepiColombo SIMBIO-SYS ME – Shock test specification Keywords: shock, test, specification, Qualification Abstract/ Scope: This document presents the test specification for the shock test on the Main Electronic Box foreseen on the Qualification model Document Type: Specification Language: English (GB) Local Chrono Number 002 Originator Location: ORS (IAS Orsay) Project Reference: BC-SIM-ORS-TS-002 Document Class: NC Document Status: Submitted Issue Number: 01 DMS Domain: BEPI Issue Date: Author: Mechanical engineer Document Code: TS WB Code: 114 Revision Number: 02 Configuration Management: yes no January 20th, 2012 Checked by System Engineer: Cydalise Dumesnil Verified by Product Assurance Manager E. Lefebvre Agreed by Project Manager P. Eng Approved by Co- Principal Investigator Y. Langevin IAS orsay Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: III BepiColombo Simbio-sys / ME III. DOCUMENT CHANGE RECORD Issue Revision 1 1 1 0 1 2 Issue Date 29/07/11 14/10/11 20/01/12 Changes Approved by Modified Pages Numbers, Change Explanations and Status Initial document Additional comments on p8, 9, schedule updated Schedule updated IAS orsay Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: IV BepiColombo Simbio-sys / ME IV. DISTRIBUTION LIST Recipient / Affiliation Copy BepiColombo IAS Team In Domain BepiColombo on Baghera Web IAS orsay Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: V BepiColombo Simbio-sys / ME V. ACRONYMS ABCL As Built Configuration List AC Acceptance Certificate AD Architectural Design Document AIT Assembly Integration &Test before delivery AIV Assembly Integration &Verification after delivery AO Announcement of Opportunity API Application Programming Interface ASI Agenzia Spaziale Italiana BD Budgets BOL Begin Of Life CAM Micro-Cameras & Space Exploration SA (Switzerland) CC Certificate of Conformance CCS Central Checkout System CIDL Configuration Item Data List CIS CISAS (Università Padova) CL CIDL, ABCL CN Contract Change Notice CNES Centre National d’Etudes Spatiales CO Contract Co-I Co-Investigator Co-PI Co-Principal Investigator COTS Commercial Off The Shelf Software CR Change Request DC Document Change Notice DD Detail Design Document DMS Document Management System DN Delivered Note DP Data Package DPU Data Processing Unit DSP Digital Signal Processing DW Drawing/Diagram EC Engineering Change Proposal ECO Engineering Change Order EGSE Electric Ground Support Equipment EID Experiment Interface Document EM Engineering Model EOL End Of Life EP Entrance Pupil ESA European Space Agency ESOC European Space Operations Centre ESTEC European Space Technology and Research Centre EVL Event Logger FOV Field-Of-View FPA Focal Plane Assembly FS Flight Spares GAF Galileo Avionica Firenze H/W Hardware HB Handbooks (Operation Req ….) HK House-Keeping HO Handout/Presentation HTML Hyper Text Mark-up Language HTTP Hyper Text Transport Protocol IAS (ORS) IAS-CNRS (Institut d’Astrophysique Spatiale d’Orsay) IAS IASF (INAF/Roma) IC Interface Control Document IFE Instrument Front-End Electronics INA INAF IR Inspection Report IRS IRSPS Pescara LAN Local Area Network LB Log Book LEOP Launch & Early Orbit Phase LES Observatoire de Paris LESIA LI List LM Local Manager LOS Line Of Sight LT Letter MA Manuel MCS Mission Control System ME Main Electronics MGSE Mechanic Ground Support Equipment MIB Mission Information base MLI Multi Layer Insulation MN Minute of Meeting MOC Mission Operations Centre MOS Margin Of Safety MRB Material Review Board MT Matrix N/A Not Applicable NC Non Conformance Report OAC Osservatorio Astronomico Capodimonte (INAF/Napoli) OAP Osservatorio Astronomico Capodimonte (INAF/Napoli) & Università Parthenope OBCP On-Board Control Procedure OBSW On Board Software OFI Osservatorio di Firenze OGS Operational Ground Segment OGSE Optics Ground Support Equipment OI Oven Industries, Inc. OIB Optische Interferenz Bauelemente GmbH Jena OIRD Operations Interface Requirement Document OOL Out Of Limit OPD Osservatorio Astronomico di Padova (INAF/Padova) PA Product Assurance PD Project Directive PDF Portable Document Format (Adobe Acrobat) PE Proximity Electronics PFM Proto-Flight Model PI Principal Investigator PL Plan IAS orsay PLM Payload Module PM Project Manager PO Proposal PPL Preference Part List PR Procedure PS Procurement Specifications PSF Point-Spread-Function PT Product Tree PV Procedure Varation Sheet QA Quality Assurance QLA Quick Look Analysis QPL Qualified Part List RD Request for Deviation RF Request for Proposal RH Relative Humidity RMS Root Mean Square RP Report RS Requirement Specification RTA Real Time Analysis RTK Real Time Kernel RW Request For Waiver S/C Spacecraft S/W Software SAP Università La Sapienza Roma SC Schedule/Network/Barchart SCMP Software Configuration Management Plan SCR Software Change Request SE System Engineer SIP Science Implementation Plan SMR Software Modification report SP Specification SPMP Software Project Management Plan SPR Software Problem Report SPX SPACE-X (Switzerland) SQAP Software Quality Assurance Plan SRR Software Requirements Review SVM Service Module TBC To Be Confirmed TBD To Be Determined TBN To Be Nominated TBW To Be Written TC Tele-Command TM TeleMetry TN Technical Note TP Test Procedure TR Test Report TRB Test Review Board ULE Università Lecce UPA Università Parthenope UPD Università di Padova UR User Requirements Document VC Verification Control Document WB Work Breakdown Strucutre WP Work Package Description WS Statement of Work Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: VI BepiColombo Simbio-sys / ME VI. TABLE OF CONTENTS I. FRONT PAGE ................................................................................................................................................................ I II. THIS DOCUMENT "MANAGEMENT PAGE"....................................................................................................... II III. DOCUMENT CHANGE RECORD ........................................................................................................................... III IV. DISTRIBUTION LIST ................................................................................................................................................ IV V. ACRONYMS .................................................................................................................................................................. V VI. TABLE OF CONTENTS ............................................................................................................................................ VI 1. INTRODUCTION ..........................................................................................................................................................7 1.1 PURPOSE AND SCOPE .....................................................................................................................................................7 1.2 DOCUMENTS .................................................................................................................................................................7 1.2.1 Applicable Documents..........................................................................................................................................7 1.2.2 Reference Documents ...........................................................................................................................................7 1.2.2.1 1.2.2.2 Normative References ........................................................................................................................................................7 Informative References .......................................................................................................................................................7 2. MAIN ELECTRONICS BOX DESCRIPTION ...........................................................................................................7 3. SPECIFICATIONS ........................................................................................................................................................8 3.1 BASELINE ......................................................................................................................................................................8 4. TEST FACILITY ............................................................................................................................................................8 5. NUMBER OF TESTS .....................................................................................................................................................8 6. SUCCESS CRITERIA ...................................................................................................................................................9 7. REQUIRED CONDITIONS FOR THE TEST ............................................................................................................9 7.1 7.2 ENVIRONNEMENTAL CONDITIONS .................................................................................................................................9 TEST EQUIPMENT...........................................................................................................................................................9 8. SCHEDULE ....................................................................................................................................................................9 9. FURNITURE...................................................................................................................................................................9 10. DELIVERABLES ...........................................................................................................................................................9 IAS orsay Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: 7 BepiColombo Simbio-sys / ME 1. INTRODUCTION 1.1 Purpose and scope This document presents the test specification for the shock test on the Main Electronic Box. These shock levels are induced the MMO clampband release, the stack separation systems or the release of the MCS appendages. 1.2 Documents 1.2.1 Applicable Documents AD1: EID-A BepiColombo Issue 2 Rev2 Ref: BC-EST-RS-01140 AD2: EID-A Update Request -049-Issue 3 AD3: EID-B Draft4 Ref: BC-EST-RS-2523 AD4 : Simbio-SYS ME Mechanical interface control document Ref.: BC-SIM-ORS-DW-013 Iss3. Rev1_essai_meca 1.2.2 Reference Documents 1.2.2.1 Normative References NR1: ECSS-E-03-Testing 1.2.2.2 Informative References None 2. MAIN ELECTRONICS BOX DESCRIPTION The Main Electronic Box is the electronic box controlling the entire SIMBIO-SYS instrument. Its main dimensions are: 220 x 290 x 100 mm3 IAS orsay Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: 8 BepiColombo Simbio-sys / ME For dimensions see attached drawing BC-SIM-ORS-DW-013 Iss3. Rev1 Weight : 3.5Kg Fixing : 6 M4 3. SPECIFICATIONS 3.1 Baseline The levels are issued from AD2 Frequency Acceleration (SRS) 1000-300Hz 20-300g 300-1000Hz 300-1500g 1000-2000Hz 1500-2000g 2000-10000Hz 3000g Levels applicable independently to each axes X, Y and Z, one shock per axis. 4. TEST FACILITY The test shall be performed using a shock table or ringing table set up. The tolerances on the test facility are the following: SRS amplitude (1/6 octave centre frequency): +/- 6dB (with 30% of the response spectrum centre frequency amplitudes greater than nominal test specification) These values come from ECSS, they can be discussed. 5. NUMBER OF TESTS The test will be performed only on the Qualification model. The first assumption is to test with the levels coming from the 3.2. This specification is more stringent. Thus, a change to the first level is always possible. IAS orsay Ref.: BC-SIM-ORS-TS-002 Issue: 01 Rev.: 02 Date: January 20th, 2012 Page: 9 BepiColombo Simbio-sys / ME 6. SUCCESS CRITERIA The applied levels are in the tolerances defined in §3.3. A visual inspection will be performed before and after each shock test A functional test will be performed before and after each shock test. (1 hour duration) The test will be judged as successful in case of no performances deterioration observed after during the functional test after the shock. 7. REQUIRED CONDITIONS FOR THE TEST 7.1 Environnemental conditions The test should take place in a class 100 000 environment (ISO 8) or better. The whole box is covered by special paint. Therefore, the specimen will be manipulated with gloves. Special care need to be taken in order to prevent deterioration of the painting. ESD precautions must be taken in order to avoid electrical discharge. 7.2 Test equipment To verify the levels, accelerometers will be placed close to the interface points. Due to the paint, it is very difficult to place an accelerometer on the box. However, at least one accelerometer (Tri-axes) will be placed on the side on the box see drawing AD4. Accelerometers must not be glue on the paint. Free painted area for accelerometer is available and shall be used. 8. SCHEDULE The test is foreseen for April 2012. The date will be confirmed later. 9. FURNITURE The device will arrive under Nitrogen Gas, Tank for filling it after the test for transportation should be available (N2 purity > 95 %). 10. DELIVERABLES A test report shall be delivered Non conformance shall be track during the test Accelerometer and device shall be verified and calibrated A CoC of the test shall be delivered. IAS orsay