Drafting Coordinator - Loy Yang B Power Station

advertisement
GDF SUEZ Energy International is responsible for GDF SUEZ’s energy activities in
30 countries across six regions worldwide (Latin America, North America,
UK-Europe, the Middle East, Turkey & Africa, Asia and Australia), with 77 GW
gross capacity in operation and 10 GW gross capacity of projects under
construction as at 30 June 2012. The business has more than 11,000 employees
and generated revenues of €16.5 billion in 2011. In Australia, the company owns
and operates 3,540MW (gross) of renewable, gas-fired and brown coal-fired
plants in Victoria, South Australia and Western Australia. Loy Yang B Power
Station is jointly owned by GDF SUEZ and Mitsui & Co. Ltd. Our retail business,
Simply Energy, has more than 320,000 electricity and gas accounts.
Drafting Coordinator
Applications are sought from persons interested in the position of Drafting Coordinator
working in the Asset Performance department at Loy Yang B Power Station.
Under the direction of the Engineering Team Leader, the Drafting Coordinator is
responsible for the central management, accuracy and maintenance of the Loy Yang
B drafting system and providing guidance and instruction to station personnel
pertaining to the quality management of this system. Additionally, you will be
responsible for the maintenance and update of plant databases and manuals such
as valve database, cable database and plant manuals.
You will be familiar with relevant Australian Standards and have knowledge of
drawing systems and standards required to maintain drawings as they relate to
power plant, including number systems, change processes and system control.
Strong project management skills including budgeting, estimating, planning, scheduling
and financial control together with high level communication skills are required.
To be successful, you will possess a Certificate of Technology/Associate Diploma in
Design Drafting or equivalent training and experience.
Demonstrated experience within power generation or heavy industry in the drafting
field is preferred.
Please send your completed application and resume to:
Human Resources Group, Loy Yang B Power Station,
GDF SUEZ Australian Energy, Locked Bag 2500, Traralgon Victoria 3844
By Friday, 11 April 2014.
GP1434239
Applicants will be required to address in writing the selection criteria under
“Knowledge, Skills and Abilities and Education and Experience” within the position
description. You must also complete the GDF SUEZ standard application form
available on www.gdfsuezau.com.
Download