G / E-Series Digital Monitoring devices Product Features ● ● ● ● ● ● ● ● ● ● ● Din sized enclosure with Auto / manual Switch LED indication for relay status CT primary can be programmed up to 2500 in steps of 5. CT secondary will be factory set for 5. User can set the in-rush time delay. PVMD, PVMD-G :Monitors and trips the circuit after the set trip delay time when ever power unhealthiness (phase failure, phase sequence, phase unbalance under voltage or over voltage) occurs. Displays all the 3 phase voltages in a scrolling fashion during healthy condition. PVMD – Panel / Flush mounting, PVMD-G Din rail mounting. PVIMD, PVIMD-G: Monitors and trips the circuit after the set trip delay time when ever power unhealthiness (phase failure, phase sequence, phase unbalance under voltage, over voltage, under current or over current) Displays all the 3 phase voltages and 3 phase currents in a scrolling fashion during healthy condition. User can program nominal current. Under current and over current limits can be set in percentage with reference to nominal current . PVIMD – Panel / Flush mounting, PVIMD-G Din rail mounting Specifications Model PVMD PVMD-G PVIMD PVIMD-G Function Phase Unbalance,Phase Reversal,Phase Failure, Under and Over Voltage, Monitor and Control Phase Unbalance,Phase Reversal,Phase Failure, Under and Over Voltage, Under and Over Current Monitor and Control Input Voltage 415V AC, 3 phase, 4 wire Input Frequency 50Hz ± 10% Input Current N.A Voltage(Accuracy) ±4V of display value Trip Time(Accuracy) ±1% of set delay of value ±2 sec Current(Accuracy) N.A Power consumption 5VA / 1W Trip Setting Phase Unbalance-> 1-20%(Adj.) Under Voltage-> 5 to 100V AC Over Voltage-> 5 to 100V AC Phase Unbalance-> 1-20%(Adj.) Under Voltage-> 5 to 100V AC Over Voltage-> 5 to 100V AC Over Current-> 105% to 800% Under Current->20%* to 95% Minimum sensing current N.A 0.5A Maximum setting current N.A 5A(Above 5A-> Ext.CT can be used, CT setting max.2500/5 in steps of 5) Trip time delay 1 to 250 secs settable for UB, OV, UV 1 to 250 secs settable for UB, OV, UV, OC, UC Current inputs (AR, AY, AB) lb=5A ± 5% of lb ± 1 digit (lb=5A) Phase Failure trip time delay Less than 5 sec Phase reverse trip time delay Instantaneous Power On Delay 10 sec Max. Inrush current delay N.A Control output 1 c/o rated for 10A @ 250V AC / 28V DC resistive load Recovery time 2sec minimum Ambient temperature Operation: -100C to +550C, Storage: -250C to 800C Humidity Max. 85% RH @ 400C Service life (under no load) 106 operations minimum 1 to 60secs settable Electrical life (under full load) 105 operations minimum Rated frequency of operation 1800 ± 5% operations per hour maximum Insulation resistance >100M ohms @ 500V DC Di-electrical strength 1. 2.5KV AC, 50Hz for 1minute. (Between current carrying and non-current carrying parts). 2. 1.5KV AC, 50Hz for 1minute. (Between contacts and control circuit). 3. 750VAC, 50Hz for 1minute. (Between non-continuous contacts of the relay). Electrical connection Screw type terminals with self lifting clamps Mode of operation Manual / Auto Dimension (over-all) 96 x 96 x 97.5 mm (W x H 76 x 78 x 115 mm (W x H x x D) D) * Applicable for more than 2.5 Amps nominal current 96 x 96 x 97.5 mm (W x H x D) 76 x 78 x 115 mm (W x H x D) Connections Dimensions Accessories Instruction Manual-----1No RC Filter-----1No Hints On Correct Use Tools and Fasteners Kindly use star – type screw driver for tightening the screws. NOTE: Installation should include a disconnecting device, like switch or circuit breaker, with clear ON/OFF markings, to turn-off the auxiliary supply (control power).The disconnecting device should be within the reach of the equipment and the operator. Caution ● ● ● ● ● ● ● ● ● ● ● Apply appropriate personal protective equipment(PPE) and follow safety work practices Only qualified electrical workers should install this equipment. Such work should be performed only after reading this entire set of instructions. If the equipment is not used in the manner specified by the manufacturer, the protection provided by the equipment may be impaired. NEVER work alone. Turn OFF all power supplying the energy meter and the equipment in which it is installed before working on it. The successful operation of this equipment depends upon proper handling, installation and operation. Neglecting fundamental installation requirements may lead to personal injury as well as damage to electrical equipment or other property. NEVER bypass external fusing. NEVER apply the voltages at Program Lock and Auto Reset terminals. Before performing Dielectric or Megger testing on any equipment in which the monitoring device is installed, disconnect all the input and output wires to the monitoring device. High voltage testing may damage electronic components contained in the monitor The monitoring device should be installed in a suitable electrical enclosure. EAPL is not responsible for any consequential damages arising out of use of our products, though the technology is cautiously chosen and implemented like any other well designed good electric device.