Air Force Center for Engineering And the Environment (AFCEE) Worldwide Environmental Restoration and Construction Contract (WERC) LATA-KEMRON Remediation JV a This WERC contract includes environmental restoration/remediation efforts including completion of a conceptual design, construction, implementation, demolition, repair, and operation and maintenance of installed systems. The contract may include support for design or operations and maintenance incidental to environmental restoration and construction, traditional construction, and performance based remediation efforts. Task orders under this contract may involve a PBR approach, where desired outcomes of the work are identified without specifying the methods or technologies to be used. Under such efforts, the contracted work is performed with a focus on results. This approach enables the contractor to select actions best suited to the site requirements, and ensures that best management practices and best available technologies are employed. Requirements shall be carried out as specified under TOs at locations worldwide in accordance with technical and regulatory requirements. Services may include, but are not limited to, the following: ENVIRONMENTAL REQUIREMENTS Performance Based Remediation Completion of Conceptual Design Study Effort Incidental to Remedy or Corrective Action Pre-Final and Final Inspections Environmental Construction Operations and Maintenance Ordnance Removal and Support Presumptive and Other Remedies Regulatory Site Closure Radiological and Hazardous Waste Removal and Support CONTRACTING AGENCY Yolanda F. Elizondo Air Force Center for Engineering and the Environment 210-536-1199 Yolanda.eliozondo@brooks.af.mil CONTRACT NUMBER FA8903-09-D-8571 ORDERING PERIOD Sep 09 to Oct 17 KEMRON POINTS OF CONTACT John M. Dwyer, Exec. Vice President Tel. (404) 636-0928 jdwyer@kemron.com Tracy Bergquist , Program Manager Tel. (404) 636-0928 tbergquist@kemron.com TEAM SUBCONTRACTORS Avatar Environmental, LLC Labat Environmental, Inc. Lantz-Boggio Architects, PC Marsh Creek, LLC Matrix Design Group, Inc. Merrick and Company Polyengineering, Inc. Pond Constructors, Inc. SunStar, LLC URS Group, Inc. TYPE OF CONTRACT ADDITIONAL REQUIREMENTS Other Construction Pre-Final and Final Inspections Construction Related to Military Family Housing Construction, Repair, Maintenance and Emergency Response for Fuel System Projects Construction, Repair, Renovation and Demolition of Military Ranges ID/IQ to include Firm Fixed Price, Firm Fixed Price with Incentive, Cost Plus Fixed Fee, and Cost Plus Incentive Fee TOTAL CONTRACT VALUE $3 billion (ceiling) For more information regarding this contract and how it can support your program needs, call the points of contact above. www.kemron.com