Section C (Switches, and Cutouts)

advertisement
SECTION C - SWITCHES & CUTOUTS
C-1.0.0
DISTRIBUTION FEEDER DISCONNECT SWITCHES - GENERAL INFORMATION
C-1.0.1
DISTRIBUTION FEEDER DISCONNECT SWITCHES - GENERAL INFORMATION
C-1.0.2
DISTRIBUTION FEEDER DISCONNECT SWITCHES - GENERAL INFORMATION
C-2.0.0
DISTRIBUTION CUT-OUT (DROP OUT) FUSE SWITCHES GENERAL INFORMATION
C-2.0.1
DISTRIBUTION CUT-OUT (DROP OUT) FUSE SWITCHES INSTALLING THE FUSE LINK
C-4.0.1
IN LINE DISCONNECT SWITCHES MODIFIED VERTICAL POST CONSTRUCTION FOR 13 OR 23 KV SYSTEMS
C-4.0.2
IN LINE DISCONNECT SWITCHES MODIFIED VERTICAL POST CONSTRUCTION FOR 13 OR 23 KV SYSTEMS
C-4.1.1
IN LINE DISCONNECT SWITCHES STEEL AND WOOD CROSSARM CONSTRUCTION ALTERNATE METHOD
C-4.1.2
IN LINE DISCONNECT SWITCHES CROSSARM CONSTRUCTION ALTERNATE METHOD FOR ACCESSIBLE AREAS
C-5.0.0
DISCONNECT SWITCHES CROSSARM CONSTRUCTION PREFERRED (FOR INACCESSIBLE AREAS)
C-5.0.1
DISCONNECT SWITCHES CROSSARM CONSTRUCTION
C-5.0.2
HENDRIX AERIAL SPACER CABLE SYSTEM DISCONNECT SWITCHES CROSSARM CONSTRUCTION
C-6.0.0
VERTICAL DISCONNECT SWITCH INSTALLATION FOR WOOD OR CONCRETE POLES PREFERRED METHOD FOR ACCESSIBLE AREAS
C-6.0.1
VERTICAL DISCONNECT SWITCH INSTALLATION FOR WOOD OR CONCRETE POLES PREFERRED METHOD FOR ACCESSIBLE AREAS
C-6.0.2
FRAMING DETAIL FOR OVERHEAD GROUNDWIRE VERTICAL CONSTRUCTION DISCONNECT SWITCH POLE CONSTRUCTION
C-6.0.3
HENDRIX AERIAL SPACER CABLE SYSTEM VERTICAL CONSTRUCTION DISCONNECT SWITCH POLE CONSTRUCTION
C-6.0.4
FRAMING DETAIL FOR OHGW VERTICAL CONSTRUCTION WITH SEPARATE NEUTRAL - DISCONNECT SWITCH POLE
C-6.1.1
IN LINE DISCONNECT SWITCH INSTALLATION TRIANGULAR POST INSULATOR CONSTRUCTION (FOR MAINTENANCE ONLY)
C-6.1.2
IN LINE DISCONNECT SWITCH INSTALLATION TRIANGULAR POST INSULATOR CONSTRUCTION (FOR MAINTENANCE ONLY)
C-7.0.0
INSTALLATION OF SINGLE PHASE POLE MOUNTED RECLOSERS
C-8.0.0
RECLOSER ON WOOD OR CONCRETE POLES TYPES 3H, 6H, R, RX, RV, W & WV
C-9.0.0
DISTRIBUTION AUTOMATION SECTIONALIZING SWITCHES COOPER POWER SYSTEM VACUUM SWITCH 13 & 23 KV
C-9.0.4
DISTRIBUTION AUTOMATION SECTIONALIZING SWITCHES NOTES AND DETAILS
C-9.0.5
DISTRIBUTION AUTOMATION SECTIONALIZING SWITCHES, RISER INSTALLATION COOPER POWER SYSTEM VACUUM SWITCH 13 &
23 KV
C-9.1.0
COMMERCIAL / INDUSTRIAL LOAD CONTROL (CILC) DISCONNECTING SWITCHES (BRIDGES HORIZONTAL AUTO-VECTOR
SWITCHES)
C-9.1.1
COMMERCIAL / INDUSTRIAL LOAD CONTROL (CILC) DISCONNECTING SWITCHES (BRIDGES HORIZONTAL AUTO-VECTOR
SWITCHES)
C-9.1.2
COMMERCIAL / INDUSTRIAL LOAD CONTROL (CILC) SYSTEM USING POWEL ATS (SHEET 1 OF 2)
C-9.1.3
COMMERCIAL / INDUSTRIAL LOAD CONTROL (CILC) SYSTEM USING POWEL ATS (SHEET 2 OF 2)
*
C-9.2.0
SCADA-MATE SWITCH
*
C-9.2.1
SCADA-MATE SWITCH
C-9.2.2
S&C "SCADA-MATE" RADIO REPEATER
*
C-9.5.0
INTELLIRUPTER PULSECLOSER SWITCH
*
C-9.5.1
INTELLIRUPTER PULSECLOSER SWITCH
*
C-9.6.0
S&C TRIPSAVER - II SINGLE PAHSE LATERAL RECLOSER
C-9.0.10
DISTRIBUTION AUTOMATION COOPER POWER SYSTEM VACUUM SWITCH 13 & 23 KV WITH DISCONNECT SWITCH
C-11.0.0
INSTALLATION OF S&C SECTIONALIZING SWITCH IN PAD MOUNTED TRANSFORMERS
C-12.0.0
INSTALLATION OF MCGRAW EDISON SECTIONALIZING SWITCH AND SURGE ARRESTERS IN 13,200Y/22,860 AND 7,620Y/13,200 X
13,200Y/22,860V DUAL VOLTAGE PAD MOUNTED TRANSFORMER
*
C-14.0.0
15/25 KV 600 AMP ELBOW TERMINATIONS FOR NON SUBMERSIBLE WALL MOUNTED FUSE CABINETS - CLAMPING FLANGE STYLE
*
C-14.0.1
15/25KV 200 AMP ELBOW TERMINATIONS FOR NON SUBMERSIBLE WALL MOUNTED FUSE CABINETS - CLAMPING FLANGE STYLE
*
C-15.0.0
INSTALLATION OF MCGRAW EDISON 1 15 KV LOOP SECTIONALIZING SWITCH IN NON SUBMERSIBLE CABINET 7.6/13.2 KV (0-40 AMP
FUSE)
*
C-16.0.0
INSTALLATION OF MCGRAW EDISON THREE PHASE 15 KV FUSE/SWITCH MOUNTING IN NON SUBMERSIBLE CABINET 7.6/13.2 KV (040 AMP FUSE)
*
C-17.0.0
INSTALLATION OF MCGRAW EDISON FUSE SWITCHES IN SINGLE PHASE NON SUBMERSIBLE CABINET 7.6/13.2 OR 13.2/22.9 KV, (3
THRU 80 AMPS)
*
C-18.0.0
INSTALLATION OF MCGRAW EDISON SINGLE PHASE FUSE SWITCHES IN THREE PHASE NON SUBMERSIBLE CABINET 7.6/13.2 KV (60
THRU 80 AMPS) 13.2/22.8 KV (3 THRU 80 AMPS)
C-19.0.0
THERMAL SHORTING SWITCH IN DRY TYPE TRANSFORMERS
*
C-20.0.0
NON SUBMERSIBLE FUSE SWITCH CABINET 15 KV S&C, FPC OR MALTON THREE PHASE MAXIMUM FUSE SIZE 200 AMP.
*
C-20.0.1
NON-SUBMERSIBLE FUSE SWITCH CABINET 15 OR 25 KV THREE PHASE FOR 200 AMP MAX S&C FUSES WITH BUSHINGS FOR 600
AMP ELBOWS
*
C-21.0.0
SUBMERSIBLE FUSE SWITCH CABINET 15 KV S&C OR FPC/EEI THREE PHASE MAX FUSE SIZE 200 AMP
*
C-22.0.0
NON SUBMERSIBLE FUSE SWITCH CABINET 25 KV S&C, FPC, OR MALTON THREE PHASE MAXIMUM FUSE SIZE 200 AMP
*
*
C-23.0.0
INSTALLATION OF EEI SINGLE PHASE LOOP SWITCH CABINET 15 KV (FOR MAINTENANCE ONLY)
*
C-24.0.0
INSTALLATION OF MCGRAW EDISON 15 & 25 KV SINGLE PHASE SUBMERSIBLE FUSE CABINETS
*
C-25.0.0
INSTALLATION OF MCGRAW EDISON SINGLE PHASE LOOP SECTIONALIZING SWITCH IN NON SUBMERSIBLE CABINET (80 AMP MAX
FUSE)
C-26.0.1
TYPICAL INSTALLATION OF 15 OR 25 KV S&C MARK III OR EEI THREE PHASE PAD MOUNTED SWITCHGEAR
C-26.0.2
TYPICAL INSTALLATION OF 15 OR 25 KV S&C MARK III OR EEI THREE PHASE PAD MOUNTED SWITCHGEAR
C-26.0.3
TYPICAL INSTALLATION OF 15 OR 25 KV S&C MARK III OR EEI THREE PHASE PAD MOUNTED SWITCHGEAR LIVE FRONT (FOR
MAINTENANCE ONLY)
C-26.0.4
TYPICAL INSTALLATION OF 15 OR 25 KV S&C MARK III OR EEI THREE PHASE PAD MOUNTED SWITCHGEAR
C-26.0.5
TYPICAL INSTALLATION OF 15 OR 25 KV S&C MARK III OR EEI THREE PHASE PAD MOUNTED SWITCHGEAR
C-27.0.0
INSTALLATION OF KEARNEY 200 AMP AUTOMATIC OR MANUAL VACUUM SWITCH (VAC PAC)
C-27.0.1
METAL FRAMING ASSEMBLIES FOR MOUNTING KEARNEY VACUUM SWITCH (VAC-PAC)
C-28.0.1
GENERAL INSTRUCTIONS FOR OIL MAINTENANCE IN OIL FILLED LOAD-BREAK SWITCHES ("RA'S")
C-28.0.2
GENERAL INSTRUCTIONS FOR OIL MAINTENANCE IN OIL FILLED LOAD-BREAK SWITCHES ("RA'S")
C-29.0.0
INSTALLATION OF 15 KV POTHEAD ADAPTER ON 15 KV, THREE PHASE SUBMERSIBLE FUSE CABINET FOR USE ONLY ON LOW
CEILING VAULTS (7' 11" AND BELOW)
C-30.0.0
ESCO THREE PHASE NON SUBMERSIBLE VACUUM INTERRUPTER FOR 277/480 VOLT SPOT NETWORKS
C-31.0.0
MCGRAW-EDISON THREE PHASE NON SUBMERSIBLE VACUUM INTERRUPTER FOR 277/480 VOLT SPOT NETWORKS
C-32.0.1
TYPICAL INSTALLATION OF 15 OR 25 KV S&C TYPE PME DEAD FRONT THREE PHASE PAD MOUNTED SWITCHGEAR
*
C-32.0.2
TYPICAL INSTALLATION OF 15 OR 25 KV S&C TYPE PME DEAD FRONT THREE PHASE PAD MOUNTED SWITCHGEAR
*
C-32.0.3
TYPICAL INSTALLATION OF 15 OR 25 KV S&C TYPE PME DEAD FRONT THREE PHASE PAD MOUNTED SWITCHGEAR
*
C-32.0.4
TYPICAL INSTALLATION OF 15 OR 25 KV S&C TYPE PME DEAD FRONT THREE PHASE PAD MOUNTED SWITCHGEAR
C-33.0.1
INSTALLATION OF G & W SUBMERSIBLE 15KV /25KV 200 AMP MAXIMUM VACUUM THREE PHASE FAULT INTERRUPTER
C-33.0.2
INSTALLATION OF G & W SUBMERSIBLE THREE PHASE 15KV/25KV 200 AMP MAXIMUM VACUUM FAULT INTERRUPTER
C-33.0.3
INSTALLATION OF G & W SUBMERSIBLE 15KV/25KV 200 AMP MAXIMUM VACUUM SINGLE/THREE PHASE VACUUM FAULT
INTERRUPTER
C-34.0.1
INSTALLATION OF PAD MOUNTED AUTOMATIC THROWOVER SWITCH (VAC PAC) FUSED AT RISER POLE FOR 13 OR 23KV
C-34.0.2
INSTALLATION OF PAD MOUNTED AUTOMATIC THROWOVER SWITCH (VAC PAC) FUSED AT RISER POLE FOR 13 OR 23KV
C-35.0.1
POWELL ESCO PAD MOUNTED 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR LOADS UP TO 200 AMPS*, 13 OR 23 KV
*
*
*
*
C-35.0.2
POWELL ESCO PAD MOUNTED 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR LOADS UP TO 200 AMPS, 13 OR 23 KV
C-35.1.1
POWELL-ESCO PAD MOUNTED 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR LOADS UP TO 600 AMPS, 13 OR 23 KV
C-35.1.2
POWELL-ESCO PAD MOUNTED 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR LOADS UP TO 600 AMPS, 13 OR 23 KV
C-35.2.1
POWELL-ESCO PAD MOUNTED 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR LOADS UP TO 200 AMPS, 13 OR 23 KV (FOR
MAINTENANCE ONLY)
C-35.2.2
POWELL-ESCO PAD MOUNTED 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR LOADS UP TO 200 AMPS, 13 OR 23 KV (FOR
MAINTENANCE ONLY)
C-36.0.1
VAULT INSTALLATION OF POWELL ESCO 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR 13 OR 23 KV
C-36.0.2
VAULT INSTALLATION OF POWELL ESCO 600 AMP VACUUM AUTOMATIC TRANSFER SWITCH FOR 13 OR 23 KV
C-36.0.3
POWELL ESCO VACUUM AUTOMATIC TRANSFER SWITCH CONTROL PANEL
C-36.0.4
POWELL ESCO VACUUM AUTOMATIC TRANSFER SWITCH CONTROL PANEL
C-36.2.3
POWELL ESCO VACUUM AUTOMATIC TRANSFER SWITCH CONTROL PANEL (FOR MAINTENANCE ONLY)
C-36.2.4
POWELL ESCO VACUUM AUTOMATIC TRANSFER SWITCH CONTROL PANEL (FOR MAINTENANCE ONLY)
C-37.0.0
SRA 21 SWITCH SF6 FILLED TWO WAY FEEDER SECTIONALIZING FOR VAULTS 25 KV 600 AMPS FOR 13 AND 23 KV
C-38.0.0
SRA 33 SWITCH SF6 FILLED TWO WAY FEEDER SECTIONALIZING FOR VAULTS 25 KV 600 AMPS FOR 13 AND 23 KV
C-38.0.1
SRAM-44 SWITCH -3F6 FILLED FOUR WAY FEEDER SECTIONALIZING FOR VAULTS 25 KV 600 AMPS FOR 13 AND 23 KV
C-38.1.0
PAD MOUNTED SRAM-33 AND SRAM-44 SWITCHES WITH STAINLESS STEEL ENCLOSURES
C-39.0.1
INSTALLATION OF S&C TYPE PME 4 DEAD FRONT THREE PHASE PAD MOUNTED FUSE CABINET FOR 13 AND 23KV, MAXIMUM FUSE
200 AMP (NEW DESIGN - SIX BUSHINGS ON LINE SIDE)
C-39.0.2
INSTALLATION OF S&C TYPE PME 4 DEAD FRONT THREE PHASE PAD MOUNTED FUSE CABINET FOR 13 AND 23KV, MAXIMUM FUSE
200 AMP (NEW DESIGN - SIX BUSHINGS ON LINE SIDE)
C-39.1.1
INSTALLATION OF S&C TYPE PME 4 DEAD FRONT THREE PHASE PAD MOUNTED FUSE CABINET FOR 13 AND 23KV, MAXIMUM FUSE
200 AMP (NEW DESIGN - SIX BUSHINGS ON LINE SIDE)
C-39.1.2
INSTALLATION OF S&C TYPE PME 4 DEAD FRONT THREE PHASE PAD MOUNTED FUSE CABINET FOR 13 AND 23KV, MAXIMUM FUSE
200 AMP (NEW DESIGN - SIX BUSHINGS ON LINE SIDE)
C-40.0.0
VAULT INSTALLATION OF 25KV 600 AMP COOPER TYPE CI VACUUM INTERRUPTER SWITCH FOR 13 AND 25KV (FOR MAINTENANCE
ONLY)
C-40.0.1
INSTALLATION OF PAD MOUNTED 24KV 600 AMP COOPER TYPE CI VACUUM INTERRUPTER SWITCH FOR 13 AND 23 KV FOR USE
WITH 1/0 AL PRIMARY CABLE
C-41.0.0
INSTALLATION OF SUBMERSIBLE 25 KV 600 AMP MOLDED/ENCAPSULATED VACUUM SWITCH FOR 13 KV AND 23 KV AREAS
C-41.0.1
PADMOUNTED MOLDED VACUUM SWITCHES (MVS'S) AS USED WITH POWELL-ESCO ATS'S
C-41.1.0
INSTALLATION OF SUBMERSIBLE 25KV 200AMP MOLDED VACUUM ENCAPSULATED INTERRUPTERS (MVIS) FOR 13KV AND 23KV
AREAS
C-42.0.0
INSTALLATION OF 13 KV/23 KV ENCAPSULATED CURRENT LIMITING FUSES
C-43.0.0
SECTIONALIZING CABINET THREE-WAY 200 AMP 162-243-002
C-43.0.1
SECTIONALIZING CABINET THREE-WAY 200 AMP AND FOUR-WAY 600 AMP NOTES
C-44.0.0
SECTIONALIZING CABINET FOUR-WAY 600 AMP 162-244-009
C-45.0.0
INSTALLATION OF 600 VOLT HIGH CURRENT SECONDARY SWITCHES IN VAULTS WITH PARALLELED TRANSFORMERS AND
SECONDARY BUS BARS
*
C-46.0.0
TYPICAL INSTALLATION OF 25KV S&C VISTA THREE PHASE SWITCH FOR USE IN 13KV OR 23KV PAD MOUNTED APPLICATION
*
C-46.0.1
TYPICAL INSTALLATION OF 25KV S&C VISTA THREE PHASE SWITCH FOR USE IN 13KV OR 23KV PAD MOUNTED APPLICATION
*
C-46.0.2
TYPICAL INSTALLATION OF 25KV S&C VISTA THREE PHASE SWITCH FOR USE IN 13KV OR 23KV PAD MOUNTED APPLICATION
*
C-46.0.3
TYPICAL INSTALLATION OF 25KV S&C VISTA THREE PHASE SWITCH FOR USE IN 13KV OR 23KV PAD MOUNTED APPLICATION
*
C-46.0.4
TYPICAL INSTALLATION OF 25KV S&C VISTA THREE PHASE SWITCH FOR USE IN 13KV OR 23KV BELOW GRADE AND PAD MOUNTED
APPLICATION
Download