Existing Conditions Report Administrative Draft | August 2013 Contents Cover Table of Contents I. INTRODUCTION………………………….......…….…....... I-1 Project Overview…...………………………………………... I-2 Project Goals…..………………………………………………I-3 What is a Neighborhood Plan?..........................................I-6 Project Process and Schedule…..…………….................... I-7 Key Documents and Current Planning Efforts……………. I-9 Contents of the Golden Triangle Neighborhood Plan.....I-10 Organization of the Existing Conditions Report…………I-11 II. EXISTING CONDITIONS AND KEY FINDINGS…..........II-1 Introduction…………………………………………………...II-2 City Context and Study Area………………………………. II-4 Neighborhood History, Landmarks and Assets................ II-6 Land Use and Urban Design ……………………….......... II-13 – Land Use…………………………...………….............. II-13 – Community Character……........................................II-18 – Block Structure….…………………………................. II-20 – Built Form…….….………………………….................II-25 Contents Parks and Open Spaces…...……………………………….II-30 – Civic Center Park………………...…………..........… II-33 – Cherry Creek Greenway………………….…......…...II-34 – Plazas…………………………...….……….............…II-35 – Edge Parks …........................................................ II-36 Zoning Conditions……………………………………….....II-38 Mobility…...……………………………………………….…II-46 Parking …...……………………………………………….…II-60 Economic Conditions……………………………………....II-62 Infrastructure…………………………………………..….…II-83 III. OPPORTUNITIES…………..……...................................III-1 Historic Preservation Opportunities……..………………..III-2 Land Use Opportunities…………………………………….III-3 Urban Design Opportunities……………………………….III-4 Parking and Open Space Opportunities………………….III-5 Zoning Opportunities……………………………………... III-6 Mobility Opportunities…………………………………….. III-8 Parking Opportunities……………………………………..III-13 Economic Opportunities…………………………………..III-14 Infrastructure Opportunities…………………………….. III-15 Next Steps……………………………………………..….. III-16 I. Introduction I-1 Project Overview The Golden Triangle Neighborhood Plan will establish a vision, goals, plan framework, and implementation strategies for future neighborhood change. I-2 Project Goals The Golden Triangle Neighborhood Plan is guided by several important goals: Goal 1: Provide a vision, goals, plan framework and implementation strategies for the future evolution and development of the Golden Triangle neighborhood Goal 2: Ensure an economically vibrant, diverse and sustainable Golden Triangle that incorporates a range of users, including residents, workers and visitors Goal 3: Build on past planning efforts to ensure effective use of time and resources I-3 Project Goals Goal 4: Authentically engage the community in multiple and creative ways Goal 5: Capitalize on development opportunities and ensure appropriate land use mix, zoning and urban design Goal 6: Leverage opportunities with the area’s major public facilities and address associated impacts that affect the neighborhood Goal 7: Develop a parks and open space strategy and hierarchy that support a livable neighborhood, including ways to improve Civic Center Park I-4 Project Goals Goal 8: Foster strong connectivity, access and circulation for pedestrians, bicyclists, transit and automobiles Goal 9: Explore mobility opportunities to link the neighborhood with the Downtown Circulator and develop solutions for near- and long-term improvements at Civic Center Station Goal 10: Address ways that the neighborhood edges of Broadway, Lincoln, Colfax and Speer Boulevard can transform to improve pedestrian and bicycle connectivity, enhance economic development, and bolster overall livability I-5 What is a Neighborhood Plan? A Neighborhood Plan is a policy document that provides guidance to CCD officials and staff, addresses a community’s unique issues, and sets the course for future change. It is a tool to enhance the economic vibrancy, character, and overall health and quality of a neighborhood. The last plan for the Golden Triangle neighborhood was adopted in 1998. The new plan will build upon the previous plan and recent related planning efforts while addressing current issues and opportunities. I-6 Project Process and Schedule The planning process is anticipated to take 10 months – June 2013 – March 2014 I-7 Project Process and Schedule The project includes extensive community input opportunities and tools to keep people informed, including: Community-wide workshops Interactive project website Intercept surveys Community open houses Public meetings and hearings Email updates Press releases I-8 Key Documents and Current Planning Efforts The Plan is guided by past planning documents, including the citywide Comprehensive Plan 2000 and Blueprint Denver, as well as other small area plans that are adjacent to or include the Golden Triangle neighborhood. I-9 Contents of the Golden Triangle Neighborhood Plan The Golden Triangle Neighborhood Plan is anticipated to include, at a minimum, the following major components: Vision and goals framework Land use, urban design and zoning strategy Circulation and parking recommendations Infrastructure recommendations Implementation strategies – Project prioritization – Phasing/timing of short, medium and long term actions – Funding sources I-10 Organization of the Existing Conditions Report The existing conditions report for the Golden Triangle neighborhood is organized into this introduction and two following sections that include representative photos, mapping analysis, and supportive tables and charts. II. Existing Conditions and Key Findings This section reviews the current issues regarding context, history, land use, urban design, parks and open space, zoning, mobility, parking, economic conditions, and infrastructure for the Golden Triangle neighborhood. III. Opportunities This section provides major opportunities associated with each of the current issues for the overall neighborhood. This will continue to be developed during the project process. I-11 II. Existing Conditions and Key Findings II-1 Introduction Denver’s Golden Triangle is a unique neighborhood located between the Cherry Creek Greenway, the downtown business district and Capitol Hill. It is rich in history and culture, encompassing the Colorado State Capitol, Denver City and County Building, Denver Public Library, Civic Center Park, Denver Art Museum, and many other renowned museums and civic facilities. II-2 Introduction The Golden Triangle also has a range of other uses and activities, including housing (with more than 2,100 residents), restaurants, bars, cafes, retail services, office buildings, and more than 20 art studios/galleries. This eclectic mix helps to create a unique, vibrant neighborhood in the heart of the city. II-3 City Context and Study Area II-4 Study Area II-5 Neighborhood History, Landmarks and Assets Early Development – Initial construction in late 1870s City Beautiful Movement – Civic Center Plan (1904 - 1919) – Speer Boulevard (1906 - 1910) Automobile Row Civic Center circa 1940 – Along Broadway and Lincoln (1920s - 60s) – Dealerships fostered service stations and other auto uses 1990s to Present – – – – – Civic, cultural, and justice facilities Denver Art Museum expansion Residential redevelopment Design offices and art galleries Restaurants, cafes and retail services Franklin and Studebaker auto dealership on Broadway circa 1940s II-6 Neighborhood History, Landmarks and Assets Designated historic resources in the neighborhood include: Local Historic Districts – Civic Center* – Speer Boulevard* – Sherman-Grant Historic District* Evans School • Along eastern edge of neighborhood Local Historic Landmarks – Byers/Evans House (1883) – Evans School (1904)* • Restored and ready for office lease – – – – St. Marks Parish Church (1889)* Ten-Winkel Towers (1893) Carpenter Gothic Houses Ten-Winkel Towers U.S. Mint (1906) * Also designated at the state and/or local level II-7 II-8 Neighborhood History, Landmarks and Assets The Plan will help implement community objectives to protect Denver’s legacy. Comprehensive Plan 2000 Vision – “Denver believes historic preservation of significant structures, features and landscapes contributes to its distinctive character, environment, culture, economy and quality of neighborhoods.” – “Preservation and respectful urban design will reinforce the distinctive identities of Denver’s historic neighborhoods, including structures, landscapes and views.” Comprehensive Plan 2000 Strategies – “Preserve Denver’s architectural and design legacies while allowing new ones to evolve.” – “Use the neighborhood planning process to uncover an area’s cultural values and take steps to honor their significance.” St. Mark’s Parish Church II-9 Neighborhood History, Landmarks and Assets The Plan will help implement community objectives to protect Denver’s legacy. Landmark Preservation Ordinance – “It is hereby declared as a matter of public policy that the protection, enhancement, perpetuation and use of structures and districts of historical, architectural or geographic significance, located within the city or its mountain parks, is a public necessity, and is required in the interest of the prosperity, civic pride and general welfare of the people.” Byers/Evans House II-10 Neighborhood History, Landmarks and Assets Incentives available for historic preservation in the neighborhood include: Additional permitted floor area for projects incorporating historic preservation The northeastern part of the Golden Triangle in 1889 Reduction of open space requirement for reusing an existing building Preservation tax credits for contributing structures located in a historic district or individually designated Carpenter Gothic houses (Cuba Cuba) II-11 Historic Preservation – Key Findings Several potential resources are not designated as historic landmarks. Incentives may require adjustment. Limited protection exists for buildings that are not designated. – Zoning allows for much larger buildings, which may encourage demolition Historic rehabilitation projects face market challenges. – Historic interior layouts can be limited and less flexible than what current businesses desire – Rehabilitations can require additional investment to bring properties up to market standards II-12 Land Use and Urban Design Land Use An eclectic mix of civic, residential, office, commercial and retail uses can be found throughout the Golden Triangle. II-13 II-14 Land Use and Urban Design Civic Uses II-15 Land Use and Urban Design Residential Uses II-16 Land Use and Urban Design Commercial and Office Uses II-17 Land Use and Urban Design Community Character The Golden Triangle neighborhood includes a range of architectural styles reflected in buildings and civic spaces. II-18 Land Use and Urban Design Community Character The design of streetscapes varies in the neighborhood. Some street sections have good sidewalks, attractive plantings and adequate lighting. Others are inconsistent and/or not well designed, adversely impacting pedestrian access and safety. II-19 Land Use and Urban Design Block Structure The street grid generally consists of 300’ by 450’ blocks. Variations in block structure include blocks with and without alleys, diagonally cut blocks along the western edge, and “super blocks” within the north central area that contain large civic uses. II-20 Block Figure Ground Legend 0 1000 3000 II-21 Block Figure Ground In general, the street grid provides good connectivity within the neighborhood. However, improvements are needed to better the quality of connections for bicyclists and pedestrians. II-22 Land Use and Urban Design Block Structure Alleyways serve primarily as utility and service corridors, but there is opportunity to increase internal neighborhood circulation through the utilization of alleyways for pedestrian and bicycle connections. II-23 Conflicts within the Grid There is a lack of connection to the surrounding neighborhoods due to a shift in the grid pattern north of Colfax, and the barrier-like qualities of Speer Boulevard, Lincoln Street, and Broadway. II-24 Land Use and Urban Design Built Form Buildings within the neighborhood help to shape space along north-south streets while others function as iconic elements within the urban landscape. II-25 Building Figure Ground Legend II-26 Land Use and Urban Design Gaps in the Built Form An abundance of surface parking lots, while providing parking for the neighborhood as well as greater Downtown, leaves many unsightly gaps and does not provide for a pleasant walking experience. Many of these lots offer opportunities for future development to rebuild the missing urban fabric. II-27 Land Use – Key Findings Many sites are underutilized with surface parking lots or one-story buildings. There is a lack of neighborhood-serving retail and restaurant uses. Bail bond uses are overwhelming and occupy historic residential structures. II-28 Urban Design – Key Findings Although variety can be good, there is a general lack of pedestrian necessities such as: – – – – – – – – Sidewalk width consistency (ADA issues) Gathering places and small open spaces Pedestrian-scale lighting Furnishings Crosswalk markings Wayfinding Transit stop treatments Trees and plantings II-29 Parks and Open Space Green Space Civic Center Park, the Cherry Creek Greenway, and the adjacent public plazas provide some green space for the neighborhood. However, social issues, crime and safety are concerns, especially in Civic Center Park, as well as the lack of smaller, neighborhood-oriented spaces to serve Golden Triangle residents. II-30 Open Space Legend 0 1000 3000 II-31 Parks and Open Space Key Parks and Open Space Key resources and amenities include Civic Center Park, the Cherry Creek Greenway, and various public plazas adjacent to many of the public institutions. II-32 Parks and Open Spaces Civic Center Park The nearly 100 year old Civic Center Park is a neoclassically-designed park that showcases various amenities such as an amphitheater, war memorial and formal gardens. The grand park hosts many of the region’s most important cultural and civic events, and it is adjacent to State and local government institutions. II-33 Parks and Open Spaces Cherry Creek Greenway The Cherry Creek Greenway on the western border of the neighborhood is a highly utilized 40-mile multi-use trail connecting Confluence Park in Downtown Denver to Cherry Creek Reservoir and beyond. However, the corridor is often times difficult and unsafe to access from the Golden Triangle. II-34 Parks and Open Spaces Plazas The Frederick C. Hamilton Building at the Denver Art Museum overlooks a vibrant plaza that provides strong pedestrian connections from Civic Center Park southward into the Golden Triangle neighborhood. II-35 Parks and Open Spaces Edge Parks Sunken Gardens Park and the Zeckendorf Plaza sit along the southwestern edge of the neighborhood, connected by the Cherry Creek Greenway. These spaces provide opportunities for gateway improvements and other sustainable enhancements such as active recreation, community events, green infrastructure and storm water management strategies. II-36 Parks and Open Space – Key Findings The entire neighborhood south of 12th Avenue lacks any significant park or useable open space. Crime and safety in Civic Center Park are major concerns for Golden Triangle residents. II-37 Zoning Conditions Existing zone districts include: Downtown Golden Triangle (D-GT) – Most of the neighborhood – Not part of 2010 Code Update (generally retains all standards from the old 1994 B8-G zoning) Downtown Civic (D-CV) – Civic Center buildings – Part of 2010 Code Update Open Space (OS) D-CV building standards – Civic Center Park – Cherry Creek Greenway II-38 Zoning Conditions Existing zoning also includes: Planned Unit Development (PUD) – Courthouse complex (Denver Justice Center) – Special standards for planned development B-8-G with Planned Building Groups (PBGs) Denver Justice Center – Portion of the Denver Art Museum complex south of 13th Ave. – A small area along Cherokee St between 10th and 11th Avenues – Approved as PBGs under the old 1994 B-8-G zoning II-39 II-40 Zoning Conditions Key standards in the D-GT district include: Minimum Open Space per Dwelling – Waived for non-residential conversion Maximum Setback – Build near sidewalk edge Maximum Height – 175 feet as measured from Broadway (about 16 residential or 15 commercial stories) Maximum Floor Area Ratio (FAR) – Relates maximum size to lot size – May be increased for: • Affordable housing • Residential support uses • Public art and cultural facilities • Historic preservation II-41 Zoning Conditions e nc a din View plane ordinances impact Or ew Vi building height around the ain t n ou M Capitol and Civic Center. Civic Center Restrictions – Height must step down towards the Civic Center Mountain View Ordinance – Protects mountain views from the top step of the Capitol Civic Center and Mountain View height limits II-42 Zoning Conditions Required Parking per Current Zoning* Zone District Most Residential Uses Restaurants and Bars Most Retail Offices Most Civic Uses D-GT 0.75 spaces/Unit 2.5 spaces per 1,000 SF 1.25 spaces per 1,000 SF 1.25 spaces per 1,000 SF 0.5 to 1.0 spaces per 1,000 SF D-CV D-CV No Minimum Parking Requirement *Required parking may be reduced for historic buildings, retail within a mixed-use project, affordable housing or projects near transit. Bicycle parking standards also apply. II-43 Zoning Conditions Design Guidelines for Golden Triangle/B-8-G Zone District (2002) address: Site Planning – Street grid – Pedestrian circulation – Building location Architecture – Form and massing – Facades and roofs – Materials Landscaping Design Guidelines subareas – Private open space and parking lots – Public streetscape Character of Subareas II-44 Zoning – Key Findings Existing zoning allows for significant redevelopment. – Permitted height and floor area ratio much greater than typical existing pattern – Many low-scale buildings and surface parking lots still do not redevelop Existing D-GT zoning tools are very different from those used in the Denver Zoning Code adopted in 2010 for most other areas of the city. – FAR vs. Form-based approach Property owners and developers have not expressed major concerns regarding zoning. II-45 Mobility – Key Findings, Motor Vehicles The neighborhood has diverse travel networks and patterns. Motor vehicle travel in the neighborhood core has lower volume and speed. Motor vehicle travel on the edges of the neighborhood has higher volume and speed. II-46 Mobility – Motor Vehicles Traffic volumes are forecasted to increase at many locations in the study area. Traffic volumes are steady most of the day with a PM peak. Most traffic accidents in the Golden Triangle neighborhood occur near intersections. II-47 Mobility – Traffic Volumes Nearly 60% of trips are “pass through” in this travel shed. (STP) 13 miles of roadway Arterial: 8 miles Collector: 2.5 miles Local: 2.5 miles 60 signals Arterial: 56 Collector: 4 II-48 Mobility – Broadway Hourly Traffic Volumes II-49 Mobility – Accident Mapping Accident Totals 2010: 559 2011: 731 2012: 621 2013: 341 (to date) II-50 Mobility – Transit High-frequency transit service is a five minute walk from most destinations in the neighborhood. Existing routes have a lot of remaining person trip capacity. The existing ridership in the Broadway and Lincoln corridor is about 5,000 rides per day. II-51 Mobility – Transit Route Mapping 17 RTD routes Approximately 34,000 “one seat” rides available to local and regional destinations 1,800 bike on bus capacity (total number of bikes that can fit on bike racks mounted on buses) Transit service to regional destinations is within a 10 minute walk to most residences and employment locations II-52 Mobility – Transit Ridership Mapping Broadway Stops Daily Ridership: 2,500 Boarding: 62% Alighting: 38% Lincoln Stops Daily Ridership: 2,250 Boarding: 39% Alighting: 61% II-53 Mobility – Pedestrians People are walking to work, shopping, services and other modes of travel. Lincoln and 8th Avenue is one of the “high crash” locations in Denver according to CDOT. Pedestrians are using existing walkways, crosswalks and bulbouts. II-54 Mobility – Pedestrian Accidents II-55 Mobility – Bicycles People are riding bikes for multiple reasons including transportation and recreation. Most of the riders are novices and helmet use is low. Approximately 6,300 B-Cycle rides between March and July 2013 from the neighborhood. Four miles of Denver Moves facilities in the neighborhood. II-56 Mobility – Bicycle Network and Bicycle Mapping B-Cycle Stations Total Stations: 4 Total Docks: 58 30 min Returns: 8-13% Top 3 “ride to” destinations LarimerSquare(13th&Larimer) DowntownCore(15th&Glenarm) MarketStreetStation All data provided by B-Cycle and their accounting program II-57 Mobility – Person Trip Capacity Capacity analysis for Golden Triangle area (field observation) Corridor SOV Capacity Used Bike Capacity Used Walk Capacity Used Transit Capacity Used Brdwy/Lincoln 90 to 95% 5% 10% 80% Speer 95 to 98% 50% 50% 0% 8th Avenue 80 to 85% 3% 2% 0% 13th Avenue 30 to 35% 3% 2% 20% 14th Avenue 40 to 45% 3% 2% 20% Local Streets 40 to 60% 95% 5% 0% Source: DRCOG 2010 traffic counts, July 2013 field counts, TRB bus lane capacity, FHWA Green Book, and NACTO II-58 Mobility – Bike and Pedestrian Counts Observed bicycle and pedestrian counts (July 2013) Corridor Bicycle Counts (PM Peak) Pedestrian Counts (PM Peak) 12th/Speer Intersection 63 2 Broadway & Lincoln Corridors 40 100 11th Avenue Corridor 55 30 Bannock Corridor 40 25 II-59 Parking – Key Findings Private off-street and public on-street parking options are available throughout the neighborhood. Most of the privately owned surface parking lots are in the north end of the Golden Triangle neighborhood. Private carsharing is available in the neighborhood and can be returned to any on-street space. II-60 Parking – Mapping Parking Totals On-street Meters: 982 II-61 Economic Conditions Overview Since 2000, the Golden Triangle neighborhood has captured less development activity than many other central Denver neighborhoods. Nevertheless, investment has been reasonable. 1.6 million square feet of new residential development (1,068 units) 1.7 million square feet of civic/governmental and 400,000 square feet of civic/cultural uses Stand-alone retail and office development have lagged, with 13,000 and 46,000 square feet of new space respectively II-62 Economic Conditions Economic and Development Considerations There is no distinct pattern for recent development, with the exception of new civic and cultural buildings between Colfax and 13th Avenue. The lack of a cohesive or locational pattern among new projects reflects the lack of a unifying theme. There is little vacant land within the Golden Triangle; however, there are many parcels with buildings valued at less than half of the value of the land they are on. – Office rents are lower than other Downtown locations while land values are generally consistent, making redevelopment feasibility more challenging. – Retail uses, albeit a smaller proportion of total uses, achieve higher rents and lower vacancy rates, providing a unique opportunity. II-63 Economic Conditions Existing Private Development The Golden Triangle neighborhood has a diverse mixture of uses. Commercial uses are scattered throughout, however there are two main concentrations: – A cluster of retail uses along Broadway and Lincoln Street – Office and commercial uses along 11th and 10th avenues Residential units are primarily in multi-family buildings with the majority of units built in the past 10 to 15 years. – No major concentration of residential buildings in one part of the neighborhood – Majority of remaining single-family residential buildings have been converted to commercial space for businesses II-64 Commercial Parcels II-65 Residential Parcels II-66 Economic Conditions Existing Civic, Cultural and Artistic Uses The Golden Triangle neighborhood has a high concentration of cultural and arts-related amenities, businesses, and attractions. Public and cultural uses are the predominant uses along 13th and 14th avenues. The contributing arts-related uses include: Denver Art Museum and other art museums Art galleries Design services employers Visual arts related businesses Performing arts studios and offices Two art schools II-67 Public and Cultural Uses II-68 Artistic Uses II-69 Economic Conditions New Development Trends New development since 2000 has been predominantly public office buildings, cultural attractions and multi-family residential buildings. 1,068 residential units have been built since 2000, of which the majority (672 units) have been apartments. The majority of new retail or office space has been incorporated into larger residential mixed-use buildings, with a very limited amount of stand-alone retail or office development. II-70 New Development II-71 Economic Conditions New Residential Development, 2000 to 2013 Building Address Year Built Stories The Prado 300 W 11th Avenue 2002 18 108 467,343 1,186 6,910 The Beauvallon Condos 925-975 Lincoln 2004 15 200 252,710 1,264 51,056 The Museum Residences 1200 Acoma Street 2006 6 55 88,040 1,590 11,395 Piranesi Condos 1100-1130 Delaware St 2007 5 24 71,607 1,308 17,807 Building Name Avg. Unit Units Total Size Size Retail / Office Condo Subtotal 387 87,168 Apartment The Boulevard 150 W 9th Street 2005 4 290 305,899 1,055 0 Broadway Residences at 1135 1135 Broadway 2006 8 96 119,037 1,163 7,395 816 Acoma 816 Acoma Street 2008 16 223 218,400 979 0 12th And Elati Residences 420 W 12th Avenue 2008 10 63 62,000 984 4,988 Subtotal 672 12,383 Rowhome Golden Row 1128 to 1136 Cherokee St 2006 3 3 13,129 4,376 0 355-365 W 12th Avenue 355-365 W 12th Avenue 2007 3 6 13,341 2,224 0 Subtotal Total Residential Units Source: City/County of Denver; CoStar; Economic & Planning Systems 9 0 1,068 99,551 II-72 Economic Conditions The Golden Triangle neighborhood has attracted very little private commercial development compared to the other neighborhoods surrounding the central business district. The majority of new development has been by municipal, State and non-profit entities including the following projects: Denver Justice Center 60,000 square feet police crime lab Ralph J. Carr State Justice Center Hamilton Building addition to the Denver Art Museum Colorado History Museum Clyfford Still Museum II-73 Economic Conditions New Commercial/Public Development, 2000 to 2013 Building Name Retail Arby's Floyds 99 Barbershop Zocalo Restaurant BBVA Compass Bank Subtotal Office Office Building Office Building State Board of Land Commissioners Subtotal Public Employment Justice Center Post Office/Parking Garage Denver Justice Center, Courthouse Denver Justice Center, Detention Center Police Crime Lab Ralph J Carr Justice Center Subtotal Cultural History Colorado Denver Art Museum Hamilton Building Clyfford Still Museum Subtotal Building Address Year Built Stories Total Size 1085 Broadway 1088 Broadway 12 E 11th Avenue 800 Broadway 2000 2004 2010 2010 1 1 1 1 2,838 4,988 2,113 3,341 13,280 1000 Cherokee St 1041 Acoma St 1127 Sherman St 2001 2001 2009 2 2 3 14,423 14,218 17,348 45,989 1375 Delaware St 520 W Colfax Ave 490 W Colfax Ave 1371 Cherokee St 1300 Broadway 2007 2010 2010 2012 2013 4 5 5 3 12 241,219 317,800 454,640 60,000 600,000 1,673,659 1200 Broadway 100 W 13th Avenue 1250 Bannock 2005 2011 2013 4 4 2 187,882 171,955 28,500 388,337 Total Development 2,121,265 Source: City/County of Denver; CoStar; Economic & Planning Systems II-74 Economic Conditions Market Conditions Golden Triangle office and retail spaces are less valuable and rent for lower rates than property in the greater Downtown area. However, the value of the land in the neighborhood is as high as the rest of the Downtown area. Office space rents for an average of $6 per square foot less than the rest of the greater Downtown area. Retail space in the Golden Triangle is approximately three percent of the greater Downtown area. The average price per square foot for land in the Golden Triangle is currently $106. Between 1999 and 2013 the average in the greater Downtown area was $105. II-75 Economic Conditions New Development New development since 2000 has been predominantly public office buildings, cultural attractions and multi-family residential buildings. 1,068 residential units have been built since 2000, of which the majority (672 units) have been apartments. The majority of new retail or office space has been incorporated into larger residential mixed-use buildings, with a very limited amount of stand-alone retail or office development. II-76 Economic Conditions Golden Triangle Office and Retail Conditions Use Square Feet Vacancy Rate Average Rental Rate 2,491,616 11.9% $21.84 42,613,995 11.1% $27.31 623,102 3.4% $20.20 23,135,957 5.2% $16.52 Office Golden Triangle Central Denver [1] Retail Golden Triangle Central Denver [2] [1] Central Denver is includes the following CoStar submarkets: CBD, Capitol Hill, LoDo, South Midtown, Platte River [2] Central Denver is includes the following CoStar submarkets: Downtown, Central Denver Source: CoStar; Economic & Planning Systems II-77 Economic Conditions Land Sale Prices, 1999 to 2013 Golden Triangle Golden Triangle Golden Triangle Improved Land Sales Land Property Sales 1999 to 2013 On Market 1999 to 2013 Number of Sales Average Sales Price Greater Downtown Land Sales 1999 to 2013 Greater Downtown Improved Property Sales 1999 to 2013 31 7 155 225 908 $1,970,386 $2,667,143 $3,365,887 $3,705,512 $79,714,019 $74 $106 $142 $105 $555 26,492 22,950 81,422 36,366 88,797 Average Price per Sq Ft (land) Average Sq Ft of Land Source: CoStar; Economic & Planning Systems II-78 Building Heights II-79 Parking Lots Stand - Alone Surface Parking Parking Structure II-80 Vacant Parcels II-81 Building to Land Value Ratio II-82 Infrastructure – Existing Utilities Overview of Existing Utilities Storm Drainage System – System outdated and undersized – Minimal water quality treatment exists Sanitary Sewer System – Overall condition unknown – Pipes outdated Electrical System – Majority already relocated underground – Portions still remain overhead II-83 Infrastructure – Northwest Corner Existing Utilities Key Map II-84 Infrastructure – Northeast Corner Existing Utilities Key Map II-85 Infrastructure – West Central Area Existing Utilities Key Map II-86 Infrastructure – East Central Area Existing Utilities Key Map II-87 Infrastructure – South Area Existing Utilities Key Map II-88 Infrastructure – Existing Utilities Storm Drainage System Area within major basin of City of Denver Storm Drainage Master Plan – Basin includes tributary area to Cherry Creek south and east of Downtown – Area at downstream end of major basin – In major events, infrastructure rendered useless and water flows through streets Major Issues – – – – Systems in CCD Master Plan called out to be replaced Outdated clay pipe Undersized pipes Systems in each street do not provide water quality treatment for runoff from previously developed properties II-89 Infrastructure – Existing Utilities Sanitary Sewer System Mostly runs through alleys to the north Connects to lines running in 12th, 13th, and 14th avenues Combines with pipes from Downtown in Colfax at Elati Street and Glenarm Place Portions have been updated to PVC pipes Major Issues – – – – System outdated Vast majority clay pipe Overall condition of system unknown Pipes may be over a century old II-90 Infrastructure – Existing Utilities Electrical System Majority of system already relocated underground Several areas still remain overhead with possibility to relocate underground II-91 III. Opportunities III-1 Historic Preservation Opportunities Further leverage historic resources to promote unique neighborhood identity Promote unique historic assets and subareas such as automobile row uses and signs on Broadway and Lincoln Test market-based incentives to promote historic rehabilitation and adaptive reuse Actively pursue local designation of key historic resources III-2 Land Use Opportunities Build on the synergy of the arts and design offices by implementing additional creative office space Provide restaurant and retail space in mixed-use buildings Consolidate bail bonds and revitalize the historic homes. These homes could be converted into retail and restaurant spaces Develop surface parking lots with a mix of uses that includes office, housing and retail space III-3 Urban Design Opportunities Improve sidewalks and adhere to ADA regulations Provide new open spaces internal to the neighborhood Improve streetscape throughout the neighborhood – Furnishings – Wayfinding – Transit stop treatments Improve safety – Pedestrian-scale lighting III-4 Parks and Open Space Opportunities Provide neighborhood-serving pocket parks and useable open space Create great streetscapes that become linear open spaces III-5 Zoning Opportunities Update D-GT District standards to 2010 Code Update format – Enhance ease-of-use for the overall code – Better illustrate desired design – Promote Neighborhood Plan objectives Update design guidelines – Integrate with revised zoning – Consider the relevance of plan subareas 2010 Code Update format III-6 Zoning Opportunities Consider reducing required parking Address impact of parking lots – Further discourage parking as a primary use? – Phase-in landscape requirements for existing lots? – Encourage temporary uses on parking lots? – Assist with ownership consolidation? III-7 Mobility Opportunities – 12th and Speer Should the connection to CC happen here? Gaps do occur but almost blocked – off peak? Ramps in wrong direction for crossings? Bicyclist position conflicts with right turns? Reroute to signal at 11th? III-8 Mobility Opportunities – Broadway/Lincoln Are the peak hour bus lanes saving travel time? Broadway (6th to Colfax PM) 4:44 minutes Is the parking configuration 1:10 “waiting at reds” meeting ED goals? 1.8 “red lights” stops 11 MPH average How can these roads better reflect multi-modal goals Lincoln (Colfax to 6th AM) adopted by the City? 3:28 minutes 1:02 “waiting at reds” Do they fit the vision for a 1.4 “red lights” stops “world class city”? 15 MPH average How can the person trip capacity be increased? III-9 Mobility Opportunities – 11th Avenue Corridor Is a bike lane the best treatment? Two east-bound lanes from Bannock to Broadway warranted? Are there missed ED opportunities with the road? Are bulbouts and crosswalks necessary? III-10 Mobility Opportunities – Bannock Street Corridor Is the bike lane in the safest place? Are the left turn lanes warranted? Are the ground markings consistent with MUTCD? Are bulbouts and crosswalks necessary? III-11 Mobility Opportunities – Neighborhood-wide Crosswalk markings Transit stops Wayfinding Pedestrian-scale lighting ADA compliance III-12 Parking Opportunities Parking management Increased bike parking III-13 Economic Opportunities Redevelopment Opportunities The Golden Triangle neighborhood has few vacant parcels but has several parcels with surface parking or low value buildings that could potentially be redeveloped. The neighborhood has several parcels with low value, one to two story buildings. There are several private surface parking lots that provide parking to the Denver Justice Center and Downtown. Surface parking lots are a target for redevelopment but revenue from parking lots increases the cost to acquire these parcels and the cost of development. III-14 Infrastructure Opportunities Provide regional water quality for untreated areas Determine condition of existing sanitary system Eliminate and replace all clay pipe with current approved pipe – Storm Drainage System – Sanitary System Upsize storm pipe to carry minor storm water and alleviate flooding during major storm Relocate all overhead electrical lines where possible III-15 Next Steps Staff Working Group Meeting #3 and Community Pop-Up Workshop September 19th Concept Alternative Development October - November Community Workshop #2 November Refine Alternatives December Draft Plan Development January 2014 Final Plan Development March 2014 III-16