When using electrical equipment, basic safety precautions should always be followed, including the following:
READ AND FOLLOW ALL SAFETY INSTRUCTIONS
1.
Installation and servicing should be performed by qualified personnel.
2.
Install in accordance with the National Electrical Code and local regulations.
3. CAUTION – This fixture may provide more than one power supply output source. To reduce the risk of electrical shock, disconnect power by turning off the A.C. branch circuit, and follow the installation instructions in their proper sequence as outlined.
4.
Not for use in heated air outlets or hazardous locations.
5.
Do not mount near gas or electric heaters.
6. This unit may use a high-temperature Ni-Cad battery. Recycle or dispose of the nickel cadmium battery properly when replacing or removing this product.
7.
The unit should be mounted in locations and at heights where it will not readily be subjected to tampering by unauthorized
personnel.
8.
When using conduit, use flexible conduit only.
9.
The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition, void warranty, and
result in non-compliance with UL specifications.
10.
Do not use this equipment for other than intended use.
11.
This unit requires an unswitched A.C. power source of either 120 or 277 volts. Properly cap the unused A.C. lead.
12.
Suitable for use in damp locations.
13.
For use in 50° F minimum, 104° F maximum ( 10° - 40° C) ambient temperatures.
14.
Allow battery (if present) 24 hours to charge before first use.
15.
Electricians and end-users need to ensure proper operation before final installation.
SAVE THESE INSTRUCTIONS
1. Opening the Unit
The interior of the unit contains primary
components and hardware for completing installation. Using a slotted screwdriver, gently pry off the front panel of
the unit by inserting the screwdriver into
the slots. See Fig. 1
Refer to the Parts Description Table (Fig.
2) for a list of included components.
Fig. 1
Fig. 2
2.Mounting
Fig. 3
Back Mounting (Fig 3)
1) Drill 1/4″ holes into oblong knockouts on backplate (3) that
correspond to juncton box (10) holes to be used.
2) Feed the transformer input leads through the hole and make
the proper connections (refer to Fig 6). Cap all unused leads. If
the unit includes a battery, snap the battery connectors together (Fig 7).
3) Feed excess wiring into the junction box and secure the
backplate (3) to the junction box (10).
4) Snap in arrows (5) on EXIT panel (2) if required, then snap
EXIT panel (2) to housing, top first and then bottom.
Side and Ceiling Mounting (Figs 4 and 5)
1) Attach crossbar (11) to junction box (10). Set the crossbar so
that the longer blade is touching the junction box.
Fig. 4
2) Remove the back panel and feed the transformer input leads
through the hole (side or top depending on location of junction
box), being sure to secure wire into wire guides molded at the
edge of the sign.
3) Attach and lock the canopy (7) to the sign by inserting the
canopy (7) into the housing slot at a 20° angle and twisting into
place.
4) Make the proper connections (refer to Fig 6). Cap all unused
leads. If the unit includes a battery, snap the battery connectors
together (Fig 7).
Fig. 5
4) Feed excess wiring into the junction box and align holes in
canopy (7) with those in crossbar (11). Using the screws provided, tighten canopy to crossbar so that canopy is securely
fastened and tight against the wall.
5) Snap in arrows (5) on EXIT panels (2) if required, then snap
EXIT panels (2) to housing, top first and then bottom.
Testing and Maintenance
Fig. 7
GREEN GROUND
WIRE
Pressing the Test Button turns off the AC Indicator light and
forces the unit into emergency mode and activates the lamps.
After releasing the Test Button, the fixture returns to normal
operation.
Initial Testing – Allow the unit to charge approximately 1 hour,
Fig. 6
then press the test switch to conduct a short discharge test. Allow a 24 hour charge before conducting a one hour test.
This is a maintenance free unit, however, periodic inspection
and testing is required. NFPA 101, Life Safety Code, outlines the
following schedule:
Monthly – Insure that the AC indicator is illuminated. Conduct
a 30 second discharge test by depressing the Test Button. The
lamps on the unit should be lit.
Annually – Insure that the AC indicator is illuminated. Conduct a full 11/2 hour discharge test. The unit should operate as
intended for the duration of the test.
“Written records of testing shall be kept by the owner for inspection by the authority having jurisdiction.”
SERVICING SHOULD BE PERFORMED BY QUALIFIED PERSONNEL.