Know Your Tariff - Reliance Energy

advertisement
The revised tariffs approved by the Commission that shall come into force with effect
from June 1, 2015 are as under:
Sl.
No.
Consumer category
&
Consumption Slab
Fixed/ Demand
Charge per month
Wheeling
Charges
(Rs/kWh)
Energy
Charge
(Rs/kWh)
Regulatory
Asset
Charge
(Rs/kWh)
LOW TENSION
CATEGORIES
1
LT I - Residential
(BPL)
Rs. 10
1.80
0.65
0.27
Rs. 50 $$
1.80
2.43
0.56
1.80
3.99
0.75
1.80
5.57
0.89
Rs. 100 $$
1.80
7.21
1.07
Rs. 275
1.80
5.42
0.84
1.80
6.33
1.01
1.80
7.26
1.22
Rs. 275
1.80
6.08
0.97
Rs. 220 per kVA
1.80
6.03
0.93
Rs. 450
1.80
14.83
2.19
Rs. 220 per kVA #
1.80
4.19
0.93
LT I – Residential
0-100 units
101-300 units
301 to 500 units
Above 500 units
(balance units)
2
LT II - LT
Commercial
(A)
≤ 20 kW
(B)
> 20 kW and ≤ 50
kW
(C)
> 50 kW
3
Rs. 75 $$
LT III - LT
Industry upto 20
kW load
Rs. 220 per kVA
LT IV - LT
4
Industry above 20
kW
5
LT V Advertisement &
Hoardings, incl.
floodlights & neon
signs
6
LT VI – Streetlights
7
LT VII –
Temporary Supply
(A)
TSR – Temporary
Supply Religious
Rs 225
1.80
4.84
0.84
(B)
TSO – Temporary
Supply Others
Rs 450
1.80
16.07
2.36
Sl.
No.
Consumer category
&
Consumption Slab
Fixed/ Demand
Charge per month
Wheeling
Charges
(Rs/kWh)
Energy
Charge
(Rs/kWh)
Regulatory
Asset
Charge
(Rs/kWh)
LT VIII –
Rs 225
1.80
4.80
0.86
Rs 25 per HP
1.80
1.01
0.34
(A)
Government
Hospitals &
Educational
Institutions
Rs 275
1.80
5.50
0.92
(B)
Others
Rs 275
1.80
6.37
0.92
8
Crematoriums and
Burial Grounds
9
LT IX - Agriculture
10
LT X – Public
Services
TOD Tariffs
(in
addition to above
base tariffs) –
compulsory for
LT II (B)
and (C), LT
IV, and LT
X (A) and (B)
category, and
optional for
LT II (A)
and LT III
category
0600 hours to 0900
0.00
hours
0900 hours to 1200
0.50
hours
1200 hours to
1800
0.00
1800 hours to
2200
1.00
2200 hours to 0600
-0.75
hours
HIGH TENSION
CATEGORIES
10
HT I – Industry
Rs 220 per kVA
0.94
7.27
1.04
Sl.
No.
Consumer category
&
Consumption Slab
Fixed/ Demand
Charge per month
Wheeling
Charges
(Rs/kWh)
Energy
Charge
(Rs/kWh)
Regulatory
Asset
Charge
(Rs/kWh)
11
HT II –
Commercial
Rs 220 per kVA
0.94
8.48
1.17
12
HT III – Bulk
Supply
(Residential)
Rs 220 per kVA
0.94
6.40
0.98
13
HT IV –
Temporary Supply
Rs 450 per
connection
0.94
10.61
1.52
14
HT V – Metro and
Rs 220 per kVA
0.94
7.37
1.01
Rs 220 per kVA
0.94
5.75
1.01
Rs 220 per kVA
0.94
6.36
1.01
Monorail
15
(A)
(B)
HT VI – Public
Services
Government
Hospitals &
Educational
Institutions
Others
TOD Tariffs
(in addition to
above base
tariffs) for
HT I, HT II
0600 hours to 0900
0.00
hours
0900 hours to 1200
0.50
hours
1200 hours to
1800
0.00
1800 hours to
2200
1.00
2200 hours to 0600
-0.75
hours
Notes:
1. Fuel Adjustment Cost (FAC) will be applicable to all consumers and will be
charged over the above tariffs, on the basis of the FAC formula prescribed by the
Commission, and computed on a monthly basis.
2. $$: Fixed charge of Rs. 100 per month will be levied on residential consumers
availing 3 phase supply. Additional Fixed Charge of Rs. 100 per 10 kW load or
part thereof above 10 kW load shall be payable.
3. #: Street lightings having 'automatic timers' for switching 'on/off' would be levied
Demand Charges on the lower of the following:
a) 50% of the Contract emand
b) Actual Recorded Demand
The category-wise CSS approved by the Commission for FY 2015-16 are given in the
Table below. In case the Open Access consumer purchases power from a Renewable
source of energy, then only 25% of the below determined CSS shall be payable:
Sl.
No.
Category
CSS @75%
(Rs.kWh)
LT Category
1
LT -I Residential
0-100
-
101-300
-
301-500
-
501 and above
0.75
2
LT II - Commercial - Upto 20 kW
-
3
LT II - Commercial - > 20 kW & ≤ 50kW
0.62
4
LT II - Commercial - > 50kW
1.22
5
LT III - Industry ≤ 20 kW
6
LT IV - LT Industry above 20 kW
0.03
7
LT-V : LT- Advertisements and Hoardings
7.67
8
LT VI - Street Lights
-
9
LT-VII (A): LT -Temporary Supply Religious
-
10
LT-VII (B): LT -Temporary Supply Others
11
LT VIII - Crematorium
-
12
LT IX - Agriculture
-
13
LT X (B) Public Service Others
-
7.40
0.04
HT Category
14
HT I: HT-Industry
0.20
15
HT II : HT- Commercial
1.19
16
HT III: Group Housing Society
17
HT IV : HT - Temporary Supply
2.24
18
HT V - Metro & Monorail
0.14
19
HT VI (B)- Public Service Others
0.12
-
The above approved CSS shall be applicable on the energy actually consumed by the
change-over/OA consumer, i.e., metered consumption, rather than the grossed up
consumption after considering the wheeling losses.
Download