REQUEST FOR PROPOSAL MODEL AND GUIDELINES (for Design-Build Major Capital Outlay Projects only) CHAPTER I – OVERVIEW Article C – Uniform Table of Contents Article A Section B Title Tab Request for Proposal .......................................................................... II-A, 1 21.00 21.01 21.02 21.03 21.04 21.05 21.06 21.07 21.08 21.09 21.10 21.11 21.12 21.13 21.14 21.15 21.16 21.17 21.18 Information for Proposers .................................................................. II-B, 1 General Statement Introduction Project Schedule Cost Limits Pre-proposal Conference and Site Visit Clarifications Regarding the RFP Prequalification Requirements Costs, Awards Alternatives and Clarifications Confidentiality of Proposals and Identification Numbers Approval by the Trustees Liquidated Damages Reservation of Rights Building Permits and Fees Firm Price Proprietary Data Use of Proposals Prevailing Wage Rates Subcontractor Prequalification 22.00 22.01 22.02 22.03 22.04 Proposal Requirements Proposal Checklist Cost Proposal Requirements Technical Proposal Requirements Proposal Opening Procedures 23.00 23.01 Financial Plan Basic Plan 24.00 24.01 24.02 24.03 24.04 24.05 24.06 Evaluation Criteria General Information Evaluation Process Nonresponsive Proposals Quality Point Value Analysis Procedures Establishment of Apparent Finalists Revised April, 2008 Page 1 of 4 pages REQUEST FOR PROPOSAL MODEL AND GUIDELINES (for Design-Build Major Capital Outlay Projects only) Article Section C Part 1A 31.00 32.00 32.01 32.02 32.03 32.04 32.05 32.06 32.07 32.08 32.09 32.10 Title Tab Contract Requirements Contract General Conditions for Design-Build (Major Capital Outlay) Projects ......................................................II-C, Part 1A, 1 Definitions 32.11 32.12 Proposals Duty to Carefully Examine Instructions Competence of Proposers Necessity for Careful Examination of Site, Plans, Specifications Clarification During Bidding Proposal Documents Proposal Regulations Competitive Bidding Mistake in Proposal Small Business Five Percent Proposal Advantage California Company; Reciprocal Preference Against Nonresident Contractors; Certification Failure to be a Responsible Bidder Disabled Veteran Business Enterprise (DVBE) Participation Requirement 33.00 33.01 33.02 33.03 33.04 33.05 Award and Execution of Contract Award of Contract Return of Proposer’s Security Contract Bonds Execution of Contract Failure or Refusal to Execute Contract 34.00 34.01 34.02 34.03 34.04 34.05 34.06 34.07 34.08 34.09 Design Requirements Scope of Work Intent of the Contract Documents Laws and Codes Drawings and Specifications Approvals Prior to Construction Submittals Divisions of the Performance Specifications Standard Specifications Lay-out of the Work 35.00 35.01 35.02 35.03 35.04 35.05 35.06 35.07 35.08 35.09 35.10 35.11 35.12 Conduct of the Construction Work Laws to be Observed: Generally Laws to be Observed: Regarding Labor Environmental Requirements Substitution of Subcontractors Delegation of Performance and Assignment of Money Earned Design-Builder’s Insurance Indemnification Design-Builder’s Responsibility for the Work Occupancy by Trustees Prior to Acceptance Payments by Design-Builder Responsibility to Secure and Pay for Permits, Licenses, Utility Connections, Etc. Patented or Copyrighted Materials Chapter I, Article C, Uniform Table of Contents Revised April, 2008 - Page 2 of 4 pages REQUEST FOR PROPOSAL MODEL AND GUIDELINES (for Design-Build Major Capital Outlay Projects only) Article Section 35.15 35.16 35.17 35.18 35.19 35.20 35.21 35.22 35.23 Title Property Rights in Materials and Equipment Taxes Contract Time Progress Schedule Labor Force and Superintendent Limitation of Construction Operations Coordination with Other Work Drawings Reflecting Actual Construction Access for Inspection Clean-up of Project and Site Project Sign, Advertising 36.00 36.01 36.02 36.03 36.04 36.05 36.06 36.07 36.08 36.09 Interpretation of and Adherence to Contract Requirements Interpretation of Contract Requirements Issuance of Interpretations, Clarifications, Additional Instructions Product and Reference Standards Shop Drawings, Samples, Alternatives or Equals, Substitutions Quality of Materials, Articles and Equipment Testing Materials, Articles, Equipment and Work Rejection Off-Site Testing Responsibility of Quality 37.00 37.01 37.02 Changes in the Work Change Orders Emergency Changes 38.00 38.01 38.02 38.03 Claims and Damages Contractor’s Claims Review Board Delay in Completion—Liquidated Damages Failure to Meet Terms of Contract 39.00 39.01 39.02 39.03 39.04 39.05 39.06 39.07 Payment and Completion Acceptance Partial Payments Escrow in Lieu of Retention Stop Notices Final Payment Guarantee Contractor Evaluation Part 1A 35.13 (cont’d) 35.14 Part 1A Sample Forms Forms to be Submitted with Cost and Technical Proposal Cost Proposal List of Proposed Subcontractors Certification (for Bid) Bidder’s Bond Noncollusion Affidavit Small Business Preference and Certification Request Certification of Appropriate License and California Co. Bid Proposal Form Signature Page Chapter I, Article C, Uniform Table of Contents Revised April, 2008 - Page 3 of 4 pages Tab REQUEST FOR PROPOSAL MODEL AND GUIDELINES (for Design-Build Major Capital Outlay Projects only) Article Section Part 1A Title Forms to be Submitted with Agreement Agreement (one page, two-sided) Payment Bond Performance Bond Certification (for Agreement) Payee Data Record (one page, two-sided) Tab Forms to be Submitted after Award (relating to subcontractors) Expanded List of Subcontractors DVBE Forms: Transmittal Form, Summary of Disabled Veteran Owned Business Participation, Bidder’s Certification, Documentation of Good Faith Effort Forms for Use After Award and During Construction Notice to Proceed Site Survey and Acceptance Contractor’s Construction Waste and Recycling Plan Contractor’s Building Demolition Waste and Recycling Plan Subcontractor Status Report Fair Employment Practices Compliance Report (one page, two sided) Design-Builder’s Payment Request Request for Payment of Materials On Hand Schedule of Values Uniformat Building Systems Breakdown by Discipline Request for Payment for Materials on Hand Contractor’s Reuse, Recycling, and Disposal Report Bldg Demo: Contractor’s Reuse, Recycling, and Disposal Report Field Instruction Cost Request Bulletin Hourly Labor Rate Worksheet Design-Builder Change Order Request Summary Subcontractor Change Order Request Summary (Design-Build) Change Order Guarantee Quality and Performance Notice of Completion Punch List Part 1B Supplementary General Conditions ..................................... II-C, Part 1B, 1 Part 2 Special Conditions ................................................................ II-C, Part 2, 1 Part 3 Subcontractor Prequalification Document ............................ II-C, Part 3, 1 Part 4 Prevailing Wage Rates .......................................................... II-C, Part 4, 1 D E F G Design Criteria ................................................................................... II-D, 1 Submittal Requirements and Procedures for CSU Design-Build Capital Projects ............................................................ II-E, 1 Maps ................................................................................................... II-F, 1 Master Plan, Project Location Map (site plan), Area Utilities Geotechnical Report ........................................................................... II-G, 1 -End of Chapter I, Article C, Uniform Table of ContentsChapter I, Article C, Uniform Table of Contents Revised April, 2008 - Page 4 of 4 pages