Budget Hearings - Facilities Services Kyle Owen March 21, 2013 Presentation Outline: I. Mission Statement II. Budget/Funding Sources III. Departments/Activities IV. Statistics V. Deferred Maintenance VI. Cost Savings Efforts VII. Opportunities for Improvement VIII. Questions? Facilities Services • Mission Statement: Facilities Services is dedicated to providing an excellent physical environment and high quality customer service, in support of the university’s goal of educational excellence. II. Budget/Funding Sources Budget/Funding Sources: M&O Budget, FY13 23305 3300 23308 3300 Shuttle Services Safety 23310 3300 Bus Services 23311 3300 General Remodel & Repair Facilities Services 23313 3300 23315 3300 Mustang Shuttle Fire alarms & extinguishers, hazardous waste, medical, gas inspections, safety clothing Maint. & insur for buses & motor pool $37,730 $35,530 South campus maintenance $50,000 $181k of total=uniforms, auto insur, pest control, fuel, chemicals, elevators Auxillary Maint (budgeted revenue) 23318 3300 Christ Academy 11000 13306 Purchased Utilities Electricity, gas, water $43,831 $505,500 -$72,000 $6,000 $2,000,000 $2,606,591 Budget/Funding Sources: Salaries, FY13 11000 13300 23313 3300 11000 13301 11000 13303 11000 13304 11000 13305 11000 13307 23308 3300 23313 3300 23315 3300 Administration Administration Vehicles Building Maintenance Custodial Grounds Utility Maintenance Safety Student Salaries Auxillary Maint. Salaries $197,853 $178,393 $97,540 $503,477 $1,081,608 $429,756 $493,008 $5,000 $70,050 $270,678 $3,327,363 Only $198,678 funded III. Departments/Activities Departments/Activities: • Administrative: o Department head (1 person). o Budgets, credit card reviews, requisitions, WOs, fleet reservations, departmental billings, utility purchases, workman’s comp (2). o Time sheets, personnel records/PTFs, receptionist (1). o Construction oversight, THECB space reporting, safety consulting (1). o Construction inspection; funded with project money (1). Departments/Activities: • Crafts: o Carpentry Shop (3.6). o Custodial (38). o Electrical Shop (3). o Fleet (1.4; 2 budgeted for FY13). o Grounds (13). o Lock Shop (1). o Paint Shop (3). Departments/Activities: • Utilities/Central Plant o Supervisor (1). o Assistant supervisor/administrator (1). o A/C repair (2). o HVAC controls, fire alarms, some card access repair (2). o Plumbing (2). o Daytime operator/testing technician (1). o 24-7 plant operations oversight (4). • Student workers in Grounds, Custodial, Administration (12.5 @ 9 mo., 9 @ 3 mo.). * Facilities’ staff maintains, no new construction. IV. Statistics Statistics: Work Orders Total Work Orders Vs. FTEs 6,300 82 6,200 6,100 83 6,000 5,900 Increase due to more efficiency such as splitting of crews (carpenters); reporting of time improvement. 87.5 Total FTEs Work Orders Completed 5,800 5,700 5,600 5,500 FY10 FY11 FY12 Statistics: Customer Service Customer Survey Results Consistently High (Excellent + Good Reviews) 100 99 98 97 96 Quality Timeliness Courtesy Satisfactory Completion 95 94 93 92 91 90 FY10 FY11 FY12 Statistics: WO Backlog WO QTY PENDING, ALL SHOPS: FY11, FY12, & FY13 140 120 100 80 Grounds Electrical Central Plant Carpentry 60 40 20 Feb Mar Apr May Jun Jul Aug Sept '11 Oct Nov Dec '11 Jan '12 Feb Mar April May June July August Sept '12 Oct Nov Dec '12 Jan '13 0 Statistics: P-Card, Warehouse: Facilities' Credit Card, Warehouse Charges $250,000 Writing POs instead of P-card $200,000 $150,000 Credit Card Warehouse $100,000 $50,000 $0 FY10 FY11 FY12 FY13 YTD Workers Comp Claims Filed: 35 30 25 20 Campus Total Facilities 15 10 5 FY08 FY09 FY10 FY11 FY12 Workers Comp Costs: $160,000 $140,000 $120,000 $100,000 Premium Assessed Paid by MSU Claims Cost - Paid by SORM $80,000 $60,000 $40,000 $20,000 FY12 claims cost not available $FY08 FY09 FY10 FY11 FY12 V. Deferred Maintenance Budget/Funding Sources: 11110-13350, HEAF 1,250,000 1,200,000 1,150,000 1,100,000 1,050,000 1,000,000 950,000 900,000 850,000 800,000 FY11 FY12 FY13 Deferred Maintenance: The Deferred Maintenance Process… • Facilities condition walk-thru audits conducted weekly in all buildings from Apr. ‘11 through Jan. ‘12. • Audit of 1-2 buildings conducted once a month beginning Dec. ‘12. • Database contains list of deferred maintenance items (~550). • Supervisors/management prioritize list every summer. • Facilities works list (20-30/yr) as funds are available. Deferred Maintenance: Database Sample Building Tunnel Central Plant WF Museum and Arts at MSU Christ Academy Christ Academy Christ Academy Christ Academy Christ Academy Christ Academy Christ Academy Christ Academy Christ Academy Dillard College of Business Admin Instrumental Music Hall Instrumental Music Hall Instrumental Music Hall Instrumental Music Hall Comments Chill water expansion joints: Replace rusted/missing packing gland bolts on ~26 joints (54 total in tunnel). Support structure for 2 joints have no structural integrity and needs to be replaced. Cooling tower baffles/fins are falling off and need replacing on the silver towers. Replace 18 ton roof top A/C unit that is partially failed and 25+ years old Replace HVAC systems in Counseling area. Extend chill water system from tunnels since chiller system no longer operational. Repaint walls in Counseling area. Replace lay-in ceilings in Counseling area. Voice & Data Rewiring/Replace Network Switching Equipment for Counseling area. (M. Dye) Install restrooms for ADA compliance in Counseling area. Replace carpet in Counseling area. Fire alarm system for Counseling area Install fire sprinkler system in Counseling area, including new riser. Repair roof in Counseling area. Provide for additional cooling in COBA 306's PC lab; room is undercooled due to heat load. Replace buried steam and chill water lines from tunnel to mechanical room. Upgrade interior doors to meet ADA Replace three pair of exterior doors/hardware/frames Paint interior of building Expenditure $ FACILITIES HEAF EXPENSES TOTAL Priority DEFERRED MAINTENANCE TOTAL $135,000.00 1 $135,000.00 $135,000.00 $80,000.00 2 $215,000.00 $215,000.00 $20,000.00 3 $200,000.00 4 $12,000.00 $15,000.00 4 4 $75,000.00 4 $537,000.00 $40,000.00 4 $577,000.00 $21,000.00 $60,000.00 4 4 $598,000.00 $658,000.00 $100,000.00 4 $758,000.00 $20,000.00 4 $778,000.00 $40,000.00 5 $65,000.00 5 $883,000.00 $6,500.00 5 $889,500.00 $12,000.00 5 $901,500.00 $5,000.00 5 $906,500.00 $235,000.00 Italics=alternate funding source $255,000.00 $435,000.00 $447,000.00 $462,000.00 $818,000.00 Deferred Maintenance: • Infrastructure evaluations are ongoing such as the parking lot assessment from Dec. ’12: Installation Replacement Cost Parking Area (SY) Date Est Wigwam Trail 1,796.78 $97,026 West of Central Plant 8,123.72 97? '03? $438,681 Daniel yard, plus driveway 3,968.01 1,989.00 $214,273 East of Hardin, Along Taft 1,796.17 $96,993 Practice Fields-eastern half 4,041.17 $218,223 South of Bolin 7,320.66 $395,316 South of Prothro-Yeager 2,786.82 99? '03? $150,488 Teepee Drive 2,446.83 $132,129 Total area to be replaced (acres) 6.67 Total cost to replace $1,743,129 Estimate based on replacement cost of $6/SF ($54/SY). Fading Color 10 9 9 9 10 10 9 10 Rough/Jagged Surface 10 10 9 9 10 9 10 8 Cracks 10 10 10 10 8 9 9 10 Overall Score (high=bad) 30 29 28 28 28 28 28 28 Deferred Maintenance: Description 1 Auxiliary 2 Facilities (E&G) 3 Project or Info Systems Deferred Maint. Backlog (DM) $2,112,156 $7,890,000 $10,002,156 % of Total (1+2) 21.1 78.9 % of Total (1+2+3) 14.7 54.7 $4,414,316 $14,416,472 CCIV, % % of (DM/ GSF IWCCI) 46.5 29.6 1.8 30.6 2.6 CCIV=Campus Condition Index Value. Institution-wide Campus Condition Index (IWCCI) per THECB=$560,992,689. • HEAF funds cannot be used for Auxiliary areas (47% of the GSF). • CCIV<5% is acceptable to THECB (formula change in 2012). Deferred Maintenance: Description Auxiliary Facilities (E&G) Project or Info Systems Deferred Maint. Backlog (DM) $2,112,156 $7,890,000 $10,002,156 $4,414,316 $14,416,472 FY12 Expenditures % Expenditures of FY12 Backlog $193,305 9.2 $992,602 12.6 $1,185,907 $3,103,009 $4,288,916 • Project funds (Ligon, CSC) resolved $1.8 MM of auxiliary DM issues. • Should not rely on such “bailouts” in future. • Recommend spending an additional ~$100k/year on auxiliary DM issues in the future. VI. Cost Reduction Efforts More With Less: Grounds • Increased areas of responsibilities for Grounds in last 6 years: o Redwine Rec Center o Sundance o SIMS Center o Fain Instrumental Music Hall (old band hall demo’d) o Mustang Park o 3311 Taft o 2.3 Acres south of Museum o Christ Academy • Grounds FTE changes in last 6 years = +1 More With Less: Custodial • Properties added in last 6 years: o Redwine = 47,000 GSF o SIMS Center = 15,000 GSF • Custodial FTE changes in last 6 years = -0.5 • 2007: GSF (890,557) /Custodial FTE = 25,086 • 2013: GSF (940,453) /Custodial FTE = 26,870 (+6.6%) Cost Effective Efforts: • Review of staffing requirement using Association of Physical Plant Administrators (APPA) data. • APPA levels of attention ratings for Grounds: I=High traffic urban areas. Mow every 1-3 days. II=Well-developed public areas, campuses. Mow 1X/wk. (MSU) III=Moderate-low levels of development or visitation. Mow every 2 weeks. IV=Moderately low level maintenance, budget restrictions. Mow as-needed. V=Minimum-level maintenance. Mow as-needed. VI=Natural area that is not developed. No mowing. Cost Effective Efforts: • APPA levels of attention ratings for Custodial: I=Orderly spotlessness. II=Ordinary tidiness. (MSU) III=Casual attention. IV=Moderately dinginess. V=Unkempt neglect. Cost Effective Efforts: • MSU at level II (“high level”). 1. Grounds: o Using AutoCAD, totaled areas for: i. mowing, ii. shrubs, iii. flower beds, iv. athletic fields. Sample AutoCAD Review: Grass/ Mow Areas Shrubs Grounds APPA Review: Baseball/ Flowerbed Softball TOTAL SF Campus wide 5,596 43,173 Adjustment Factor 3.0 TOTAL SF w/ Adj Fact 129,520 TOTAL Acres w/ Adj Fact 8.92 APPA Data: Level 2 10,000 2.9 Calculated FTE 0.6 3.1 Shrub Football/ Turf (Riding Turf (Push Area Soccer Mower) Mower) 65,009 414,213 3,725,846 86,018 3.0 1,242,638 28.53 85.53 1.97 33,333 2.0 4.09 7.0 25 2.3 3.4 0.9 Total FTE, all Level 2: Irrigation WO Labor Hours FTE not included in APPA tables: Caretaker duties at Sikes House: Special Request Work Order FTEs, includes FOL: Expected FTE Requirements using APPA data: Current staffing including Joe F.: Student worker labor: FTE Shortage: 16.8 16.8 0.7 0.2 1.2 18.8 13 1.3 14.3 4.5 Cost Effective Efforts: 2. Custodial staffing vs. APPA data o Used THECB space data. o Sorted all 2,180 rooms using APPA’s categories. o Summed GSF data into each category. o Totaled all custodial work order labor hours. Custodial APPA Review: Category GSF Level 2 Auditorium Seating & Foyer 32,969 15,200 Classroom with Carpet Floor 21,825 29,600 Classroom with Carpet-High Use 18,836 17,000 Classroom with Hard Floor 135,826 19,100 Classroom with Hard Floor-High Use 16,505 10,600 Gymnasium 26,722 39,600 Library with Carpet 8,538 48,600 Locker/changing room-no shower 454 14,200 Office with Carpet Floor 158,506 24,500 Office with hard floor 1,437 16,800 Patient Conference Room 14,167 10,200 Public (Circulation) with Carpet Floor 69,194 55,300 Public (Circulation) with Hard Floor 88,289 24,400 Research Lab w/o Hazardous Waste 11,317 11,700 Storeroom 96,451 240,200 Vending 478 13,300 Washroom 10,131 3,500 Washroom - High Use 10,212 1,900 Total personnel required WO FTEs for movers and special projects Estimated FTE NOT captured by WOs FTEs for opening doors at start of day Total Custodial FTEs required Total Custodial FTEs budgeted FTE shortage Labor Req'd for Level 2 2.2 0.7 1.1 7.1 1.6 0.7 0.2 0.0 6.5 0.1 1.4 1.3 3.6 1.0 0.4 0.0 2.9 5.4 36.1 1.7 1 0.3 39.1 38 -1.1 Enterprise Conversion Analysis: VEHICLE # YEAR MILEAGE PURCHASE PRICE # DAYS GALLONS FUEL INSUR. MAINT TOTAL COST CLEANING CARS 140, 143, 161, 162, 167, 181 FY11 Data: 742 - - 140, 143, 161, 162, 167 Sept & Oct ONLY FY12 Data: Nov-Aug FY12 Data (these 6 cars entered into fleet 11/2011): 168 2008 Impala 57,503 $ 7,500 169 2008 Impala 55,809 $ 7,500 170 2008 Impala 59,869 $ 7,500 171 2008 Impala 52,713 $ 7,500 172 2008 Impala 55,810 $ 7,500 181 2008 Impala 48,007 $ 17,361 FY12 total $ 54,861 161 - - 88 93 117 91 84 139 773 FY11 & FY12 two year average Total vehicles purchase expenditure 758 $ 54,861 $ $ $ $ $ 11,855 3,078 12,859 33,704 44.49 daily $ weekly $ # days x rate $ 38.85 234.45 29,429 Savings using Enterprise instead of our own $ 4,275 Vehicles cost/yr (4 yr life for 168-172; 7 yrs 181) Insurance for 6 vehicles per year MSU mechanic 1/3 FTE w/ benefits per year Estimated yearly cost to operate 6 sedans (no fuel) Average cost per use (yearly cost / 758) Enterprise rates 445 538 727 557 495 776 $ 1,440 $ 1,811 $ 2,435 $ 1,870 $ 1,648 $ 2,504 $ 11,708 $ 3,078 $ 4,021 $ - $ 2,225 $ $ $ $ $ $ $ 513 513 513 513 513 513 3,078 $ $ $ $ $ $ $ 953 1,101 601 470 473 5,823 $ 3,078 $ 990 $ 8,089 $ 2,225 $ $ $ $ $ $ $ 165 165 165 165 165 165 990 4,922 $ 990 $ 3,071 $ 3,590 $ 3,714 $ 3,018 $ 2,799 $ 3,182 $ 21,599 Enterprise Conversion Savings: • Savings from Enterprise conversion is minimal. • Primary savings is elimination of one FTE at a savings of $45k/year. Utility Savings: • Negotiated new electricity contract with Purchasing: o o o o Rate through 5/31/13: $0.06168/kWh. New rate (4 years): $0.05220/kWh. 15.4% decrease. Estimated yearly savings is $125,000. • Plus: $25k discount for first (6/2013) and last (5/2017) month’s bills. VII. Opportunities for Improvement Opportunities for Improvement: 1. Increase salaries of Grounds and Custodial. Issues include: o High turnover, particularly in Grounds. o Low quality of applicants. o Applicants typically take other jobs before we issue an offer. o No increase when minimum wage increased $0.70/hr in 2009. o Starting salary for Grounds is $8.31/hour and Custodial is $8.09/hour which has been the same since 2009. o Increased responsibilities, particularly for Grounds. Opportunities for Improvement: 2. Is Fleet a 1 or 2 person shop? Still evaluating. 3. Carpentry Shop staffing: • Nov. ‘12=3 • Dec. ‘12=2 (carpenter training as backup mechanic) • Apr. ‘13=2.6? (carpenter 60% time, mechanic 40% time) • Sept. ‘13=1? (lose 1 due to VSP, mechanic full time?) • May ‘14=2.6 (re-hire 1) Carpentry Shop backlog and response time will increase over next ~14 months. Opportunities for Improvement: 4. Increase funding for auxiliary deferred maintenance. 5. Facilities’ emergency management responsibilities not clearly understood. Facilities Services’ perspective: • Provide physical resources during a crisis. • Provide consulting services (by Rich). Facilities Services: VIII. Questions?