GTold eam CS 410 Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005 • • • • Speakers Problem Statement Proposed Solution What We Are Not Doing • Hardware Components GTold eam CS 410 Agenda • Software Components • Market Analysis • Schedule • Cost • Risks & Issues • Conclusion 2 GTold eam CS 410 Speakers • Gold Team: – Keith Mulkey – Project Overview – Joe Kane – Hardware – Sergei Yemelianoff – Software – John Gedville – Market Analysis – Keith Mulkey – Wrap up 3 GTold eam CS 410 Problem Statement Network Administrators and Corporate Asset managers in large organizations spend numerous hours each year tracking and locating computer hardware assets. 4 GTold eam CS 410 Proposed Solution A turn-key computer asset management and inventory system based on RFID (Radio Frequency Identification) tag technologies integrated with a specialized database management system. 5 GTold eam CS 410 What We Are Not Doing We are not re-inventing the RFID based inventory management systems already available and used by the Department of Defense and corporate giants such as Wal Mart. 6 GTold eam CS 410 Hardware Components • RFID Tags – Passive or Active – Four frequency ranges – Re-writeable or write once • RFID Scanner – Types of readers: Fixed and Mobile – PC card and compact flash – Wireless LAN with 802.11G or other wireless technology 7 GTold eam CS 410 Hardware Components of the Computer Asset Manager System RFID Scanner Computer RFID Tag PDA 8 GTold eam CS 410 Software Components • RFID Application Program Interface – Every manufacturer provides its own API – Communicates with a PC via TCP/IP socket or COM port • Client – Server paradigm – Connect PDA to remote server PC – Server PC communicates with a database engine 9 GTold eam CS 410 Software Components • Database Engine – Independent database server – Software provides initial script of DB creation • Development Platform & SDKs – J2SE & J2ME – JAVA APIs: java.com.*, java.net.*, sun.jdbc.* 10 GTold eam CS 410 Market Analysis • Straw poll survey indicates 72% of those surveyed indicated an interest in such a product • Very large potential market: computer repair facilities such as the Geek Squad® – Nearly 7,000 agents – Plans to open 20-50 stand-alone stores by the end of 2006 11 CS 410 GTold eam Schedule Oct 2005 ID Task Name Start Nov 2005 Dec 2005 Jan 2006 Feb 2006 Mar 2006 Apr 2006 May 2006 Finish 10/2 1 Presentation II (Feasibility 10/20/2005 10/20/2005 2 Requirements Analysis 10/24/2005 11/11/2005 3 RFID Hardware Selection 11/7/2005 11/11/2005 4 Client Side Software Design 11/14/2005 11/28/2005 5 Server Side Software Design 11/21/2005 12/12/2005 6 Presentation III 11/17/2005 11/17/2005 7 Web Page Development 10/24/2005 12/13/2005 8 Preliminary Web Page Due 11/29/2005 11/29/2005 9 Presentation IV 12/13/2005 12/13/2005 10 Final Web Page Due 12/13/2005 12/13/2005 11 SBIR Proposal Due 12/13/2005 12/13/2005 12 Simulation Software Develop 1/9/2006 1/23/2006 13 Simulation Software Functional Test 1/16/2006 1/23/2006 14 Client Side Software Develop 1/23/2006 2/13/2006 15 Client Side Software Functional Test 1/30/2006 2/13/2006 16 Server Side Software Develop 2/13/2006 3/20/2006 17 Server Side Functional Test 2/20/2006 3/20/2006 18 Integration Test Plan & Procedures 2/20/2006 3/20/2006 19 Integration Test 3/20/2006 3/31/2006 20 User Documentation 2/20/2006 3/31/2006 21 Acceptance Test Plan & Procedures 3/6/2006 3/31/2006 22 Acceptance Test 3/31/2006 4/5/2006 23 Project Completion 4/5/2006 4/5/2006 10/9 10/16 10/23 10/30 11/6 11/13 11/20 11/27 12/4 12/11 12/18 12/25 1/1 1/8 1/15 1/22 1/29 2/5 2/12 2/19 2/26 3/5 3/12 3/19 3/26 4/2 4/9 4/16 4/23 4/30 5/7 12 CS 410 GTold eam Estimated Development Cost Labor: Rate Hours Cost Joe $ 19.00 440 $ 8,360 John $ 19.00 440 $ 8,360 Keith $ 40.00 440 $ 17,600 Sergei $ 19.00 440 $ 8,360 Hardware: Price Quantity Cost RFID tags $ 2.00 4 $ 8 RFID scanner $ 400.00 1 $ 400 PDA $ 200.00 1 $ 200 Software Price Quantity Cost RFID SDK $ - 1 $ - Java DE $ - 1 $ - Total Labor $ 42,680.00 Total Hardware $ Total Software Total Cost $ $ 43,288.00 608.00 13 GTold eam CS 410 Risks & Issues Risks: • Most obvious risk is questionable market • Meeting development schedule given other demands on team members’ time Issues • Management challenge with respect to diverse schedules of team members 14 GTold eam CS 410 Conclusion • Market is questionable mainly due to already existing products. • Overall however: – This system would be of great benefit to organizations that track a great many computer assets. – Project is technically feasible – Costs are within the budget of our group – Development schedule is achievable in CS410/411 – Our team has the expertise to complete the project. – The potential benefits outweigh the risks 15