T G old eam

advertisement
GTold
eam
CS 410
Computer Asset
Management
System
Project Feasibility
CS 410, Fall 2005 Semester
October 20, 2005
•
•
•
•
Speakers
Problem Statement
Proposed Solution
What We Are Not
Doing
• Hardware
Components
GTold
eam
CS 410
Agenda
• Software
Components
• Market Analysis
• Schedule
• Cost
• Risks & Issues
• Conclusion
2
GTold
eam
CS 410
Speakers
• Gold Team:
– Keith Mulkey – Project Overview
– Joe Kane – Hardware
– Sergei Yemelianoff – Software
– John Gedville – Market Analysis
– Keith Mulkey – Wrap up
3
GTold
eam
CS 410
Problem Statement
Network Administrators and Corporate
Asset managers in large organizations
spend numerous hours each year tracking
and locating computer hardware assets.
4
GTold
eam
CS 410
Proposed Solution
A turn-key computer asset management and
inventory system based on RFID (Radio
Frequency Identification) tag
technologies integrated with a specialized
database management system.
5
GTold
eam
CS 410
What We Are Not Doing
We are not re-inventing the RFID based
inventory management systems already
available and used by the Department of
Defense and corporate giants such as Wal
Mart.
6
GTold
eam
CS 410
Hardware Components
• RFID Tags
– Passive or Active
– Four frequency ranges
– Re-writeable or write once
• RFID Scanner
– Types of readers: Fixed and Mobile
– PC card and compact flash
– Wireless LAN with 802.11G or other
wireless technology
7
GTold
eam
CS 410
Hardware Components of the
Computer Asset Manager System
RFID Scanner
Computer
RFID Tag
PDA
8
GTold
eam
CS 410
Software Components
• RFID Application Program Interface
– Every manufacturer provides its own API
– Communicates with a PC via TCP/IP socket
or COM port
• Client – Server paradigm
– Connect PDA to remote server PC
– Server PC communicates with a database
engine
9
GTold
eam
CS 410
Software Components
• Database Engine
– Independent database server
– Software provides initial script of DB
creation
• Development Platform & SDKs
– J2SE & J2ME
– JAVA APIs: java.com.*, java.net.*,
sun.jdbc.*
10
GTold
eam
CS 410
Market Analysis
• Straw poll survey indicates 72% of those
surveyed indicated an interest in such a
product
• Very large potential market: computer
repair facilities such as the Geek Squad®
– Nearly 7,000 agents
– Plans to open 20-50 stand-alone stores by
the end of 2006
11
CS 410
GTold
eam
Schedule
Oct 2005
ID
Task Name
Start
Nov 2005
Dec 2005
Jan 2006
Feb 2006
Mar 2006
Apr 2006
May 2006
Finish
10/2
1
Presentation II (Feasibility
10/20/2005 10/20/2005
2
Requirements Analysis
10/24/2005 11/11/2005
3
RFID Hardware Selection
11/7/2005 11/11/2005
4
Client Side Software Design
11/14/2005 11/28/2005
5
Server Side Software Design
11/21/2005 12/12/2005
6
Presentation III
11/17/2005 11/17/2005
7
Web Page Development
10/24/2005 12/13/2005
8
Preliminary Web Page Due
11/29/2005 11/29/2005
9
Presentation IV
12/13/2005 12/13/2005
10 Final Web Page Due
12/13/2005 12/13/2005
11 SBIR Proposal Due
12/13/2005 12/13/2005
12 Simulation Software Develop
1/9/2006
1/23/2006
13 Simulation Software Functional Test
1/16/2006
1/23/2006
14 Client Side Software Develop
1/23/2006
2/13/2006
15 Client Side Software Functional Test
1/30/2006
2/13/2006
16 Server Side Software Develop
2/13/2006
3/20/2006
17 Server Side Functional Test
2/20/2006
3/20/2006
18 Integration Test Plan & Procedures
2/20/2006
3/20/2006
19 Integration Test
3/20/2006
3/31/2006
20 User Documentation
2/20/2006
3/31/2006
21 Acceptance Test Plan & Procedures
3/6/2006
3/31/2006
22 Acceptance Test
3/31/2006
4/5/2006
23 Project Completion
4/5/2006
4/5/2006
10/9 10/16 10/23 10/30 11/6 11/13 11/20 11/27 12/4 12/11 12/18 12/25
1/1
1/8
1/15
1/22
1/29
2/5
2/12
2/19
2/26
3/5
3/12
3/19
3/26
4/2
4/9
4/16
4/23
4/30
5/7
12
CS 410
GTold
eam
Estimated Development Cost
Labor:
Rate
Hours
Cost
Joe
$
19.00
440
$
8,360
John
$
19.00
440
$
8,360
Keith
$
40.00
440
$
17,600
Sergei
$
19.00
440
$
8,360
Hardware:
Price
Quantity
Cost
RFID tags
$
2.00
4
$
8
RFID scanner
$
400.00
1
$
400
PDA
$
200.00
1
$
200
Software
Price
Quantity
Cost
RFID SDK
$
-
1
$
-
Java DE
$
-
1
$
-
Total Labor
$ 42,680.00
Total Hardware
$
Total Software
Total Cost
$
$ 43,288.00
608.00
13
GTold
eam
CS 410
Risks & Issues
Risks:
• Most obvious risk is questionable market
• Meeting development schedule given other
demands on team members’ time
Issues
• Management challenge with respect to diverse
schedules of team members
14
GTold
eam
CS 410
Conclusion
• Market is questionable mainly due to already
existing products.
• Overall however:
– This system would be of great benefit to
organizations that track a great many computer
assets.
– Project is technically feasible
– Costs are within the budget of our group
– Development schedule is achievable in CS410/411
– Our team has the expertise to complete the project.
– The potential benefits outweigh the risks
15