GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN

advertisement
GEOTHERMAL RESERVOIR MANAGEMENT.
A THIRTY YEAR PRACTICE IN THE PARIS BASIN
Pierre UNGEMACH and Miklos ANTICS
GEOPRODUCTION CONSULTANTS (GPC)
Paris Nord 2, 14 rue de la Perdrix, Lot 109, B.P. 50030
95946 ROISSY CDG CEDEX, France
e-mail : pierre.ungemach@geoproduction.fr , m.antics@geoproduction.fr
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SCOPE
•
1.
2.
3.
4.
5.
6.
7.
8.
•
INTRODUCTION
HISTORICAL OVERVIEW
RESOURCE AND RESERVOIR SETTING
DEVELOPMENT STATUS AND MILESTONES
TECHNOLOGY OUTLOOK
OPERATION AND MAITENANCE
RISK ASSESSMENT
RESERVOIR MANAGEMENT / ENGINEERING /
SIMULATION
SUSTAINABILITY
CONCLUSIONS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
HISTORICAL OVERVIEW
TIME SCALE
MILESTONES
HYDROCARBON
EXPRO
1950
DRILLING
CORING
LOGGING
RESERVOIR
ASSESSMENT
TESTING (DST)
SAMPLING
First district heating doublet
1970
First Oil Shock
RISK ANALYSIS
FEASIBILITY
WELL
DELIVERABILITIES
PRODUCTION
DESIGN
FIELD
DEVELOPMENT
1975
LEGAL/
INSTITUTIONAL
FINANCING
INCENTIVES
BACKUP
Completion of three doublets
ENVIRONMENTAL
IMPACT
Enforcement of the
Geothermal Act (Mining Law)
Second Oil Shock
State supported incentives
1985
INCENTIVES
BACKUP
Geothermal Act (Mining Law)
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
Second Oil Shock
State supported incentives
1985
HISTORICAL OVERVIEW
End of field development (52
doublets completed)
1990
MONITORING
SURVEILLANCE
CASING CONTROL
DAMAGE DIAGNOSIS
TRACER LEAK OFF TESTS
WELL WORKOVER
CORROSION/SCALING
ABATEMENT
RESERVOIR
ASSESSMENT
UPDATE
EXPLOITATION
RECORDS
Issuing of a comprehensive
reservoir assessment
Debt renegotiation
First ATI installation
Implementation of the
workover waste processing
line
Completion of the new anticorrosion production well.
Implementation of the triplet
concept
DATABASE
PRODUCTION
MODEL
PROCESSING
F i r s t c o m b i n e d
gas/cogeneration heating
plant
RISK
(RE)ASSESSMENT
2000
10 year extension of mutual
insurance contracts
WELL LIFE
SYSTEM LIFE
ECONOMIC
VIABILITY
ENVIRONMENTAL
BENEFITS
SOCIAL IMAGE
FISCAL
INCENTIVES
2005
C o m p le t i o n o f t h e 1 7
cogeneration plant
RESERVOIR
LIFE
SUSTAINABLE
RESERVOIR
MANAGEMENT
SCENARIOS
th
34 district heating doublets in
operation
Design of future heat mining
schemes
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESOURCE AND RESERVOIR
SETTING
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
DEVELOPMENT STATUS AND MILESTONES
LOCATION OF GEOTHERMAL DISTRIC HEATING DOUBLETS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
DEVELOPMENT STATUS AND MILESTONES
TARGETED, ACHIEVED, FORECASTED OBJECTIVES
Operating doublets
Total installed capacity (MWt)
Produced heat (GWht/yr)
Unit capacity (MWt)
Unit yield (MWht/yr)
Artificial lift wells
Self-flowing wells
Target
(1985)
55
360
2,000
6.5
36,000
49
6
Achieved Forecast
1990 2000 2006
43
34
34
260
227
200
1,455 1,240 1,000
6.0
6.7
5.9
33,800 36,200 30,000
36
27
22
7
7
12
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
TECHNOLOGY OUTLOOK (1)
THE GEOTHERMAL WELL DOUBLET OF HEAT MINING
HX
A
B
IP
WH
A
WH
C
PP
UPPER
CRETACEUS
55°
LOWER
CRETACEUS
PW
IW
30°
30°
IW
LUSITANIAN
UPPER
JURASSIC
MID JURASSIC
DOGGER GEOTHERMAL RESERVOIR
1400-1700m
900-1400m
A - two vertical wells
B - 1 vertical, 1 deviated
C - two deviated wells
PP
IP
HX
PW
IW
WH
production pump
injection pump
heat exchanger
production well
injection well
wellhead
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
TECHNOLOGY OUTLOOK (2)
EQUIPMENT PERFORMANCE AND LIFETIME RECORD
ITEM
WELLS
XTREE VALVES
LIFE (yrs)
20-25
5
PRODUCTION PUMPS
ESP
HTP
4-5
5-8
INJECTION PUMP
10
PRODUCTION TUBING
6-8
DOWNHOLE CHEMICAL INJECTION LINE
5-8
PLATE HEAT EXCHANGER
10-15
FREQUENCY CONVERTER
15
SURFACE PIPING
15-20
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
THERMOCHEMICAL SHORTCOMINGS
CORROSION AND SCALING
DRIVING MECHANISMS OF CASING DAMAGE
AQUEOS CO2/H2S ENVIRONMENT
Chemical reaction:
Na+
Cl-
Steel casing
CO2 + H2O  H2CO3
Ca++
Mg++
2H2CO3 2H+ + 2HCO3Fe2+ + 2HCO3- + 2H+  2H+ + Fe(HCO) 2 soluble
Fe++
H2S + H2O  H+ + HS- + H2O
2+
Fe°
2e-
-
Fe  Fe + 2e
H+
2+
-
Fe + HS  FeS + H
+
Corrosion induced and native
FeS
Fe++
ANODE
HSFeS
HCO3H+
CAT HODE
HS-
2 H+ + 2e-  H2
for pH = 6
H2S + H2O + CO2 + Fe2+ (native)
UPW ARD FLOW
DIRECT ION
Iron sulphide particles removed from
casing wall and/or produced by soluble ions
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
WELL DRILLING/COMPLETION
ANTI-CORROSION PRODUCTION WELL DESIGN
expansion spool
free annulus
seat
fiberglass casing
cement
centralizers
steel casing
reservoir
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
THERMOCHEMICAL SHORTCOMINGS
CORROSION AND SCALING
DOWNHOLE CHEMICAL INJECTION LINES
SETUPS IN ARTIFICIAL LIFT WELLS
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (1)
MONITORING/SURVEILLANCE OF PRODUCTION FACILITIES
•
•
•
•
•
•
•
•
•
geothermal fluid
loop parameters
well deliverabilities
pump and frequency converter characteristics
inhibitor efficiencies
inhibition equipment integrity
well head integrity
surface piping control
casing inspection
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (2)
WELL WORKOVER
CORROSION AND SCALING ABATEMENT
• WELL WORKOVER
•
•
•
•
casing clean up
lining of damaged tubulars
fishing
reservoir stimulation
• CORROSION AND SCALING ABATEMENT
• downhole chemical inhibition lines
• corrosion, scaling, microbiological inhibitors
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
OPERATION AND MAINTENANCE (3)
DOGGER DATABASE
•
•
Hosted on ORACLE platform
Data instructed locally via ACCESS interface
GLOSSARY
PARAMETERS
DATA
ARCHIVE
GENERAL
INFORMATION
INTERVENING
PARTIES
HEAT PLANT
EQUIPMENT
DICTIONARY
EVENTS
INJECTION
EAUIPMENT
PRODUCTION
EQUIPMENT
GEOTHERMAL
SITE
CALIBRATION
THERMOCHEMICAL
MONITORING
HEAT PLANT
EXPLOITATION
PRODUCTION
FIGURES
WELL
CASING
ELEMENT
RESERVOIR
PROPERTIES
INJECTION
FIGURES
BUBBLE
POINT
CORROSION
TREATMENT
CORROSION
CASING
CONTROL
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RISK ASSESSMENT
• Exploration (mining, geological)
• Exploitation (technical, managerial)
• Economic/financial (market,
institutional, managerial)
• Social acceptance (image)
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
INTEGRATED GEOTHERMAL RESERVOIR MANAGEMENT
EXTERNALITIES
RESERVOIR
ENGINEERING
RESERVOIR/
SYSTEM LIFE
SUSTAINABILITY
ECONOMICS
OFFER
DEMAND
Recoverable
Heat
DEVELOPMENT/
MANAGEMENT
STRATEGY
Existing/potential
heat loads
PRODUCTION
TECHNOLOGY
RISK
ASSESSMENT
Non Technical
Obstacles
ECONOMIC/
FINANCIAL/
INSTITUTIONAL/
ENVIRONMENTAL
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERING
ASSESSMENT OF RESERVOIR STRUCTURE
CR
CR
BR
BR
BR
b. Three layered
reservoir
c. Sandwiched
reservoir
d. Single layer
equivalent
CR
40%
1
1
15%
2
23.5%
10%
4%
DEPTH
2
4
4%
2
3
5
13.5%
18%
4
3
5
5%
100
3
DEPTH
34.5%
30.5%
1
100
%FLOW
%FLOW
Injection well
Production well
a. Flowmeter logging
RESERVOIR
CR
CAPROCK
IMPERVIOUS LAYER
BR
BEDROCK
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERING.
RESERVOIR LAYER STACKING
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERING.
TEMPERATURE DECLINE AT PRODUCTION WELL
VS. RESERVOIR EQUIVALENTS
Time, years
0
10
20
30
0
1
2
3
Temperature depletion, °C
4
5
6
7
8
9
10
11
12
13
14
Single layer equivalent reservoir
2D Reservoir
Three layered model. Reservoir 1 (top)
Three layered model. Reservoir 2 (int.)
Three layered model. Reservoir 3 (bot)
Sandwiched Model. Top reservoir
Sandwiched model. Bottom reservoir
40
50
60
70
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR ENGINEERING
RESERVOIR SIMULATION
• CORE
• Calibrated regional model, online with the Dogger database,
operated as a reservoir management tool
• MODELLING STRATEGIES
• Regional. Overall reservoir
• Subregional. Multidoublet areas
• Local. Single doublet systems
• OBJECTIVES
•
•
•
•
Reservoir life
Hydrodynamic interferences
Solute transport
Sustainability assessments
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR SIMULATION
SUB REGIONAL DOMAIN
TRANSMISSIVITY AND INITIAL PRESSURE/TEMPERATURE DISTRIBUTION
IVRY
78°C
CACHAN-NORD
76°C
74°C
72°C
70°C
68°C
CACHAN-SUD
66°C
64°C
CHEVILLY-LARUE
62°C
L'HAY LES ROSES
60°C
58°C
THIAIS
56°C
FRESNES
ORLY 1
ORLY 2
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR SIMULATION
SUB REGIONAL DOMAIN
TEMPERATURE PATTERNS (YEAR 2005)
11000
10500
10000
9500
9000
8500
10
8000
9
GCA-1
7500
8
7000
6500
7
GCA-2
6000
6
5500
GCA-3
GCA-4
5
5000
GCHL-1
4
4500
GHLR-1
4000
3
GHLR-2
3500
GTHI-1
GFR-2
3000
GCHL-2
GFR-1
2
1
2500
GTHI-2
0
2000
1500
1000
500
0
0
1000
2000
3000
4000
Puits de production
Puits d'injection
5000
6000
7000
8000
9000
10000 11000
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
RESERVOIR SIMULATION
SUB REGIONAL DOMAIN
TEMPERATURE PATTERNS (YEAR 2030)
11000
10500
10000
9500
9000
10
8500
9
8000
GCA-1
7500
8
7000
7
6500
GCA-2
6
6000
5500
5
GCA-3
GCA-4
5000
GCHL-1
4
4500
GHLR-1
4000
3
GHLR-2
3500
GTHI-1
GCHL-2
GFR-2
3000
GFR-1
2
1
2500
GTHI-2
2000
0
1500
1000
500
0
0
1000
2000
3000
4000
Puits de production
Puits d'injection
5000
6000
7000
8000
9000
10000 11000
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENT
SIMULATED SCENARIOS
• WORKING ASSUMPTIONS. DESIGN FEATURES
•
•
•
•
Single/multiple well doublet/triplet heat mining arrays
Homogeneus/heterogeneus reservoir settings
Well life = 20 – 25 yrs
Reservoir life = 20 – 30 yrs (doublet/triplet thermal
breakthrough time)
• Well spacing = 1000 – 1500 m
• Heat mining schemes/schedules
• Existing doublet:
0-25 years
• Mixed well triplet array:
25-50 years
• New well doublet:
50-75 years
• DESIGN OBJECTIVE
• Avoid undue premature cooling of producing wells
• Achieve a minimum 75 years reservoir life
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENT
SIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE. SIMULATED AREA
GARGES LES GONESSES
78°C
76°C
74°C
GBMN4 (I)
72°C
LE BLANC MESNIL
AULNAY-SOUS-BOIS-RDV
70°C
AULNAY-SOUS-BOIS-VGS
68°C
GBMN3 (P)
66°C
VILLENEUVE LA GARENNE
64°C
GLCN3 (P)
62°C
GLCS4 (I)
60°C
LA COURNEUVE NORD
GLCN4 (I)
LA COURNEUVE GLCS3
SUD (P)
58°C
SEVRAN
56°C
BONDY
CLICHY-SOUS-BOIS
LA VILLETTE
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENT
SIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE.
SIMULATED OUTPUTS (YEAR 27)
10000
9000
8000
GBMN1
10
7000
GGMN2
(C)
9
8
6000
7
GLCN2
(B)
GLCS2
6
5000
5
(D)
(A)
4
GLCN1
GLCS1
4000
3
2
3000
1
0
2000
1000
0
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000 11000
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENT
SIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE.
SIMULATED OUTPUTS (YEAR 52)
10000
9000
GBMN1
8000
10
7000
GBMN2
9
(C)
GBMN3
GCLN2
6000
7
GCLN3
GCLS2
5000
(B)
6
(A)
5
(D)
GCLS1
4
GCLN1
4000
8
3
2
GCLS3
3000
1
0
2000
1000
0
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000 11000
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABLE RESERVOIR DEVELOPMENT
SIMULATED SCENARIOS
THE MULTIDOUBLET/HETEROGENEOUS RESERVOIR CASE.
SIMULATED OUTPUTS (YEAR 77)
10000
9000
8000
GBMN4
GBMN1
7000
10
9
(C)
GBMN3
8
GBMN2
6000
7
GCLN2
GCLS2
5000
GCLN3
GCLS4
6
(D)
(A)
GCLS1
(B)
GCLN1
5
4
GCLN4
4000
3
2
GCLS3
3000
1
0
2000
1000
0
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000 11000
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABILITY ISSUES (1)
•SCORE (as of year 2004)
•operating doublets
•success ratio
•yearly geothermal heat production
•CO2 atmospheric emission savings
34
65%
#1,000 GWht
500,000 tons
•EXPECTATIONS
•existing doublet life
•future GDH doublets
•geothermal heat demand projection
•Geothermal heating/cooling offer projection
75 yrs
10-15
#1,500 GWht
#2,500 GWht
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
SUSTAINABILITY ISSUES (2)
MINING INVESTMENTS (103 €)
2011-2035
-Existing doublet reconditioning/lining
-Drilling/completion of a new, corrosion resistant, production well
-Miscellaneous equipments/fittings
TOTAL
450
3,000
150
3,600
TOTAL
350
450
2,750
200
3,750
2036-2060
-Abandonment (cementing) of the initial well doublet
-Replacement of the production well fiberglass liner
-Drilling/completion of a new, corrosion resistant, injection well
-Miscellaneous equipments/fittings
COMAPARATIVE FIGURES
Capital investments (103 €)
Natural gas cogeneration plant (rated 5 MWe) / Conventional, steel cased (9”5/8), well
doublet
Cost prices (€)
MWht geothermal / MWht cogeneration
ECOTAX PROJECTED IMPACTS (Carbon atmospheric emission tax)
Impact on a 30,000 MWht/yr district heating doublet
Unit price impact
4,600 / 3,600
5-8 / 3-4
50€/t
200,000
7€/MWht
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
ECONOMY (1)
•INVESTMENT COSTS
•Total Paris Basin (52 doublets)
#500 M€
•Doublet unit costs
10 M€
•Wells
3.3 (33%)
•Heat plant/geothermal loop
0.7 (7%)
•piping/substations
6.0 (60%)
•Ratings:
•40000 MWht (geothermal = 30,000 MWht)
•Revenues (45 €/MWht)
1.8 M€
•OPERATION/MAINTENANCE COSTS (103 €)
#700
Ref: 30,000 – 35,000 MWt rated plant
•Energy
400
•Power
100
•Backup/relief fossil fuels
300
•Light maintenance/equipment replacement
40
•Heavy maintenance/equipment replacement
185
•Miscellaneus
75
FINANCIAL
•High debt (90%)/low equity (10%)
•Yearly debt repayment charge
#1 M€
GEOTHERMAL RESERVOIR MANAGEMENT. A THIRTY YEAR PRACTICE IN THE PARIS BASIN
CONCLUSIONS
• GDH scored well
• State/public sector involvement proved a decisive
•
•
•
•
•
•
impetus
Operators exhibit mature technological and
entrepreneurial skills
Exploration/exploitation risks mastered to date
Sound resource/reservoir management outline
Sustainable heat mining, up to 50-75 years
ahead, secured
Improve image
Environmental, clean air, benefits to boost fiscally
incentive measures.
Download