[AABB] BUSINESS REQUIREMENTS DOCUMENT (BRD) [ REQUIREMENTS NAME] REQUIREMENTS JULY 26, 2016 DRAFT /VERSION 1.0 [PROJECT NAME] Internal Use Only Table of Contents DOCUMENT INFORMATION AND REVISION HISTORY ...................................................................................................................................................................... 1 KEY CONTRIBUTORS ............................................................................................................................................................................................................................ 2 REVIEWERS OF DOCUMENT ................................................................................................................................................................................................................ 2 APPROVAL SIGNATURE PAGE ............................................................................................................................................................................................................ 3 ACRONYMS AND GLOSSARY .............................................................................................................................................................................................................. 3 PURPOSE OF THE BUSINESS REQUIREMENT DOCUMENT ............................................................................................................................................................ 4 PROJECT OVERVIEW ............................................................................................................................................................................................................................ 5 BACKGROUND ........................................................................................................................................................................................................................................ 5 BUSINESS NEED..................................................................................................................................................................................................................................... 5 OBJECTIVES........................................................................................................................................................................................................................................... 5 STAKEHOLDERS ..................................................................................................................................................................................................................................... 6 REQUIREMENTS GUIDELINES ............................................................................................................................................................................................................. 7 DESCRIPTION ......................................................................................................................................................................................................................................... 7 TEMPLATE GUIDELINES .......................................................................................................................................................................................................................... 7 REGULATORY/POLICY REQUIREMENTS ........................................................................................................................................................................................... 8 FUNCTIONAL REQUIREMENTS ............................................................................................................................................................................................................ 8 APPROVAL REQUIREMENTS ............................................................................................................................................................................................................... 9 REPORT REQUIREMENTS .................................................................................................................................................................................................................... 9 DATA REQUIREMENTS ....................................................................................................................................................................................................................... 10 INTERFACES/BATCH PROCESS REQUIREMENTS .......................................................................................................................................................................... 10 PERFORMANCE REQUIREMENTS ..................................................................................................................................................................................................... 11 OPERATIONAL REQUIREMENTS ....................................................................................................................................................................................................... 11 USABILITY REQUIREMENTS .............................................................................................................................................................................................................. 12 SECURITY REQUIREMENTS ............................................................................................................................................................................................................... 12 TRAINING REQUIREMENTS ................................................................................................................................................................................................................ 13 ASSUMPTIONS, DEPENDENCIES AND CONSTRAINTS .................................................................................................................................................................. 14 ASSUMPTIONS...................................................................................................................................................................................................................................... 14 DEPENDENCIES .................................................................................................................................................................................................................................... 14 CONSTRAINTS ...................................................................................................................................................................................................................................... 15 APPENDIX A: REFERENCES .............................................................................................................................................................................................................. 16 Document1 Document Information and Revision History File Name BRD - Business Requirements Template.doc Original Author(s) [Author Name(s)] Current Revision Author(s) [Author Name(s)] Version 1 Date mm/dd/yyyy Author(s) [Author Name(s)] Revision Notes [Notes] [Project Name] 7/26/2016 Classified: Internal Use Only Page 1 of 16 Document1 Key Contributors [List Key Contributors of content who have been consulted with in order to document this process] Name Organization Role Notes/Comments Reviewers of Document [Identify the individuals who reviewed the BRD and the date that the review was completed. Signatures are not required] Name Organization Role Notes/Comments [Project Name] 7/26/2016 Classified: Internal Use Only Page 2 of 16 Document1 Approval Signature Page Deliverable Name: Version Number: Project Name: I agree that this document represents my best understanding of the information presented within this Deliverable for this project today. Future changes in this baselined document can be made through the project’s change management process. I realize that approved changes might require us to renegotiate the cost, resource, and schedule commitments for this project. Approver Name Approver Title Approver Signature/Electronic Vote/Email Date Acronyms and Glossary If this section of the document is not required indicate with N/A and delete all content for the section below. [The following table includes definitions for any unique symbols or notations that are used in the document, which may cause confusion with the intended message, or may result in multiple interpretations of some key terms.] Acronym Term Definition [Project Name] 7/26/2016 Classified: Internal Use Only Page 3 of 16 Document1 Purpose of the Business Requirement Document This Business Requirements Document (BRD) is intended to [describe intention]. The BRD is the basis for all subsequent project planning, design and coding. It describes what should happen in the system under various conditions, as completely as known at this time. The BRD does NOT contain design information or anything related to how the system will provide the functionality. This document expresses the functions and capabilities that a system must provide for the [enter project name] to be successful. All known constraints, assumptions and dependencies are also defined. All attempts have been made to use business terminology and language in describing the business requirements. Only common technical terminology is used in this document. Intended Audience [Indicate who will benefit from reading this document] e.g. This document is intended mainly for the business owners and end users of the Banner Student system to verify that their business requirements have been documented here completely, accurately and unambiguously. Technical staff will benefit when considering how to design a system to meet the business requirements. [Project Name] 7/26/2016 Classified: Internal Use Only Page 4 of 16 Document1 Project Overview [Provide an introduction to the Project (copy from Project Charter). This includes describing the business context of the project and an overview of the client’s operation. Include a high-level overview of each of the functional business areas.] Background [Provide a brief background on the history of the requirements, the problem that must be addressed, the issues, concerns, challenges, etc. Business Need Define the business need that this project will address [Describe why the project needs to be done at this point in time (copy from Project Charter).] Objectives [List the high level business needs that must be met by the defined solution.] 1. [Objective 1] 2. 3. 4. 5. [Project Name] 7/26/2016 Classified: Internal Use Only Page 5 of 16 Document1 Stakeholders [Identify the stakeholders for the project – departments, their clients, etc.] Name Title Department Describe involvement [Project Name] 7/26/2016 Classified: Internal Use Only Page 6 of 16 Document1 Requirements Guidelines These guidelines are for the document author. This section may be deleted. Description Requirements describe WHAT the system, process or product/service must do in order to fulfill the business need(s). Template Guidelines In each of the following tables, use the following guidelines: Req # – Use to uniquely identify each requirement. The number should be a sequential number starting at one and should not be prefixed or reset when starting a new requirement. Source – Enter the name of the person who identified the requirement. Organization – Enter the organization for the source of the requirement. Requirement Description –Define the requirement ensuring each accurately describes the functionality to be delivered. Requirement Owner – Enter the name of the owner of the requirement (person or group) Priority – Indicate if the requirement is High, Medium or Low. o High - Requirements identified as High are deemed critical to the operation of the proposed system. They represent features that the client cannot function without o Medium - Requirements identified as Medium are those that are not mission critical to the client’s business but could provide significant benefit to the organization. o Low - Requirements identified as Low are not critical to the operations of the proposed system, but would represent helpful or convenient features that would be beneficial to the client. [Project Name] 7/26/2016 Classified: Internal Use Only Page 7 of 16 Document1 Regulatory/Policy Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [In the table below, list any policies, standards or legal constraints that apply to this process. These are existing policies that MUN has identified or have been defined by external parties that the system must respond to. Paste here and list the source and date of the documentation.] Req # 1. Source Organization Graduate School of Graduate Studies Student Support Payroll Form (Nov 2011) Requirement Description Req. Owner For International Students, Graduate Assistantship Stop Date CANNOT exceed School of expiry date on graduate’s Social Insurance Number Graduate Studies Priority H 2. 3. Functional Requirements [List the functional requirements that are necessary to meet the business needs. Where requirements are particular to a location or subset of the employee population (e.g. exempt vs. non-exempt, note this as an aspect of the requirement. These statements should be measurable and finite enough to generate a technical design. Decompose broad processes and procedure statement into system parameters.] Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description Users completing payroll requests shall be able to enter more than one payment source on a graduate payroll request. Req. Owner Priority School of Graduate Studies H 2. 3. [Project Name] 7/26/2016 Classified: Internal Use Only Page 8 of 16 Document1 Approval Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [In the table below, list approval requirements for this process (if any). In the description, list whether an approval, formal review, or simply a notification is required.] Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description User shall be able to approve Payroll requests. Req. Owner Priority School of Graduate Studies H 2. 3. Report Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [In the table below, list report requirements necessary for this process. When defining a report requirement, be sure to describe how the report is used in the process, the source of the report, frequency (daily, weekly, ad hoc), and who uses the report. Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description User shall be able to report on unapproved payroll requests. Req. Owner Priority School of Graduate Studies H 2. 3. [Project Name] 7/26/2016 Classified: Internal Use Only Page 9 of 16 Document1 Data Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [In the table below, list data requirements (conversion, cleansing, retention, etc.). For data retention requirements, detail the source of data, how often the data must be accessed, whether or not this is a regulatory requirement and how many years the data must be retained] Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description User shall be able to approve Payroll requests. Req. Owner Priority School of Graduate Studies H 2. 3. Interfaces/Batch Process Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [In the table below, list interfaces that are necessary for this process (information that must be provided to other entities)]. Req # 1. Source John Smith Organization Registrar’s Office Requirement Description Req. Owner The system must pass class schedule information to the room booking system. Registrar’s Office Priority H 2. 3. 4. [Project Name] 7/26/2016 Classified: Internal Use Only Page 10 of 16 Document1 Performance Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [In this section, describe the requirements for speed, reliability, capacity, scalability, etc.] Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description Req. Owner The application shall clearly acknowledge all user requests within 0.5 seconds. School of Graduate Studies Priority H 2. 3. 4. Operational Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [In this section, describe the environments (hardware/software), availability, supportability, and recovery requirements.] Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description The Payroll system shall not have more than 5 hours of scheduled downtime per month and not more than an average of 1 hour of unscheduled downtime per month. Req. Owner Priority School of Graduate Studies H 2. 3. 4. [Project Name] 7/26/2016 Classified: Internal Use Only Page 11 of 16 Document1 Usability Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [Usability requirements identify what users’ abilities and expectations of usage experiences the product must conform to. Meant to address user friendliness and how the user interfaces (screens) are designed with consideration for the different types or users and their skill sets.] Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description The system will populate any effective date field with the current date when adding or updating a record. Req. Owner Priority School of Graduate Studies H 2. 3. 4. Security Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [Security requirements identify the security, confidentiality, integrity and privacy issues affecting access to the product, use of the product, and protection of the data the product uses or creates. Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description Req. Owner The system shall not require users to identify themselves multiple times during School of a single session (i.e., single sign on). Graduate Studies Priority H 2. 3. 4. [Project Name] 7/26/2016 Classified: Internal Use Only Page 12 of 16 Document1 Training Requirements If this section of the document is not required indicate with N/A and delete all content for the section below. [Training requirements identify all user, help desk and support training required, e.g. required materials, level of training, number of participants, duration of training, etc.] Req # 1. Source Jane Doe Organization School of Graduate Studies Requirement Description Req. Owner All users must attend basic system training before being granted access to the School of system. Graduate Studies Priority H 2. 3. 4. [Project Name] 7/26/2016 Classified: Internal Use Only Page 13 of 16 Document1 Assumptions, Dependencies and Constraints Assumptions [Identify any assumptions; factors that, for planning purposes are considered to be true, real or certain without proof or demonstration.] # Description 1. 2. 3. 4. Dependencies [Identify any factors that are linked together where each has some effect on the other. These may include things like availability of project resources, users or stakeholders, equipment, business processes and regulatory approvals.] # Description 1. 2. 3. 4. [Project Name] 7/26/2016 Classified: Internal Use Only Page 14 of 16 Document1 Constraints [Identify any factors that limit or place constraints on the development of the solution. These may include but are not limited to time and budget constraints, regulatory, technological or business realities.] # Description 1. 2. 3. 4. [Project Name] 7/26/2016 Classified: Internal Use Only Page 15 of 16 Document1 Appendix A: References If this section of the document is not required indicate with N/A and delete all content for the section below. [List external documents to which this document refers and their location e.g., URL, folder, etc.] References Location [Project Name] 7/26/2016 Classified: Internal Use Only Page 16 of 16