Sponsored Programs Guidance “Cradle to Grave” Award Financial Setup Summary: This section outlines the information the Office of Sponsored Program’s (OSP) Grant & Contracts Analyst needs to set up a new fund in the financial system (BANNER) which is typically provided by the Principal Investigator (PI), Award Notification, and approved FIN 312. Approved FIN 312 The FIN 312 provides OSP with the Project name, PI, Sponsor, type of grant (federal, state, private, etc.), project cost, match required, if any, project period and indirect cost rate applicable, if any. This form is attached to the proposal submitted to the sponsor that includes the plan of work, budget and budget narrative. The OSP analyst determines what type of fund number to assign based on the type of sponsor. All grant funds have five characters and begin with the number “2”. For example, federal awards where funding is drawn down from a letter of credit are assigned fund numbers with a “21” as the first two digits. Federal awards where funding is received by invoicing the sponsor are assigned “23” as the first two digits. For state awards the first two digits are “25” and private awards are “28”. If cost sharing (MATCH) is required, a fund number is assigned that corresponds to the same last three digits of the sponsored fund number and begins with “22” for “21” awards, “24” for “23” funds, etc. For example, if a fund number is 23555 the MATCH fund number would be 24555. Line item Budget The line item budget is used to set up the budget in the financial system by account number. Proposal Budget Narrative The budget narrative provides the OSP analyst with the detail needed to help determine what category an expenditure should fall in. The Arkansas Cooperative Extension Service offers its programs to all eligible persons regardless of race, color, national origin, religion, gender, age, disability, marital or veteran status, or any other legally protected status, and is an Affirmative Action/Equal Opportunity Employer. Executed copy of Award Generally the fund is not setup in the financial system until an executed copy of the Award is received by the OSP analyst. If the approved budget, project cost, project period, IDC’s or any other details differ from the proposal, the Award document dictates what information is used to setup the fund. The Award generally includes an approved budget and reporting and billing requirements. This information is relayed to the PI during the Bridge Conference and used to set up the fund in the billing system. Only OSP analysts are permitted to send official invoices to the sponsor. Subawards If there is a subaward in connection with the Award, OSP will need a copy of the subaward with relevant contact information, budget, a detailed statement of work and a Letter of Commitment.