INTERNATIONAL TELECOMMUNICATION UNION RADIOCOMMUNICATION STUDY GROUPS Source: Annex 3 to Document 8A/277-E 15 November 2005 English only Documents 8A/TEMP/138, 160, 148, 165, 134, 159, 155, and 129. Annex 3 to Working Party 8A Chairman’s Report CONSOLIDATION OF REPORTS FROM THE WORKING GROUPS AND RAPPORTEUR GROUPS OF WORKING PARTY 8A CONTENTS 1 2 3 4 5 6 7 8 9 10 1 Working Group 1 – Amateur and Amateur-Satellite Services Working Group 2 – Intelligent Transport Systems (ITS) Working Group 3 – Public protection, trunking and paging Working Group 4 – Interference and sharing Working Group 5 – New technology and services Working Group 7 – Wireless Access Systems, including RLANs Land Mobile Handbook Rapporteur Group Vocabulary Rapporteur Group Ad Hoc Group on Guide Joint Working Group 8A-8B on A.I. 1.13 Page 1 2 4 4 13 16 19 20 20 21 Working Group 1 – Amateur and Amateur-Satellite Services (Chairman: Mr. Paul Rinaldo, USA) Working Group 1 met twice to consider documents related to the amateur and amateur-satellite service, and to land mobile operating in bands below 30 MHz. 1.1 Consideration of documents At the opening WP 8A plenary, it was agreed that Documents 8A/204, 8A/209, 8A/216, 8A/224, 8A/250, 8A/231, 8A/233, 8A/236, 8A/238(Rev.1), 8A/243 and 8A/245 related to WRC-07 Agenda item 1.13 would be treated in a joint meeting of WP 8A and WP 8B. Working Group 1 considered the following remaining documents: Document 8A/225, working document toward a Draft New Handbook on the amateur service and amateur-satellite service, was considered. It was agreed that Mr. Paul Rinaldo is designated as the contact point for this document. It was further agreed that input Document 8A/225 would be carried forward to the next meeting and that administrations are invited to provide additional input D:\99025843.DOC 26.07.2016 -28A/277(Annex 3)-E contributions to complete the Handbook. The WG 1 reflector should be used in lieu of the Land Mobile Handbook reflector for the handbook on the amateur service and amateur-satellite service. Document 8A/250, preliminary draft new Recommendation – Characteristics of land mobile MF/HF systems, was considered and modified as per Annex 4, and is being carried forward to the next meeting of WP 8A. Document 8A/275, a liaison statement from WP 8D with a draft revision of Question 209-1/8 arrived after the meetings of WG 1. The status of draft CPM text on WRC-07 Agenda item 1.15 in Annex 6 to Document 8A/202 was agreed to be mature text. 1.2 Future work Objectives for the next meeting are: “progress the preliminary draft new Recommendation on characteristics of land mobile MF/HF systems – to continue consideration of Agenda item 1.13; – to continue development of the amateur services handbook. 1.3 Acknowledgement The Chairman wishes to thank the participants for their input contributions and constructive work during the meetings. 2 Working Group 2 – Intelligent Transport Systems (ITS) (Chairman: Mr. Paul Najarian, USA) 2.1 General Working Group 8A-2 on mobile Intelligent Transport Systems (ITS) held a successful session during the 17th Meeting of WP 8A, and produced the following output documents, after a careful consideration of all input contributions and other discussions: Annex 5: WG 2 considered Document 8A/232, which provided an amendment to Annex 8 of Document 8A/202, a working document toward a PDNR on integrated millimeter wave ITS radiocommunication systems. This working document provides a framework for the development of comprehensive draft new Recommendation(s) that cover the radiocommunication requirements and applications anticipated for mobile intelligent transport systems (ITS) operating in the millimeter wave. This document is carried forward to the next meeting (Annex 5). Administrations and other members are invited to review this document and invited to make contributions for the next meeting of WP 8A in order to advance this document. ITS Section in the SDR Report: As requested by WG 5, WG 2 completed the draft of the ITS section in the SDR Report. This draft was based on Documents 8A/252, 8A/226, and a U.S. “information-only” document that was distributed and considered in WG 5. Document 8A/261 was initially considered by WG 2; however, this document was later deferred by the contributor in favour of the U.S. “informationonly” document. LMH: WG 2 completed version one of Vol. 4 (ITS) of the LMH. This document is available on the LMH reflector. The LMH Rapporteur’s report provides details on this activity. D:\99025843.DOC 26.07.2016 -38A/277(Annex 3)-E WG 2 thanks the Rapporteur of the Land Mobile Handbook (Ms. Cindy Cook, Canada) for her steadfast effort to advance this work, and extends best wishes in her future endeavors. Guide to ITU Land Mobile Texts: WG 2 provided an update to the ITS text contained in the ITU Land Mobile Text (Doc. 8A/258). This update is reflected in Annex 14. The Chairman’s report of the ad hoc group on the Guide provides details on this activity (see Section 9 in this annex). Working Document on Vocabulary: WG 2 reviewed Annex 16 of Document 8A/202 with respect to the ITS terms defined therein. WG 2 provided an input to the Rapporteur on the Vocabulary. Regional Rapporteurs Reports: WG 2 was pleased to note the various ITS initiatives reported in Documents 8A/239, 8A/268 and 8A/270. WG 2 encourages the continuation of regional reporting on various land mobile activities or deployments. 2.2 1) 2) 3) 4) 5) 6) 7) 8) 2.3 1) 2) 3) 4) Planned and on-going activities during the 2004-2007 study period Completion of the Recommendation on next generation ITS radiocommunication systems – Open (see Doc. 8A/58 Annex 16 – Working document toward a preliminary draft new Recommendation on radiocommunication requirements of next generation intelligent transportation systems (ITS) ) Completion of Vol. 4 (ITS) of the Land Mobile Handbook – Open Completion of a Recommendation on the Application Sub Layer for DSRC – Completed Introduction of ITS land mobile applications and technologies in the millimeter wave – Working document toward a PDNR available at this meeting. Investigation on vehicle collision avoidance radar at 79 GHz – Maybe introduced at a later date as an integrated communication/radar system. Also, presented at the Seminar. – Integrated in the PDNR on millimeter wave applications. Potential interference studies and development of protection criteria (if necessary) for ITS radiocommunications in the 5 850-5 925 MHz band – Open Continue outreach and liaison activities with other international or regional organizations such as APT (ASTAP), ETSI, CITEL, IEEE, etc. – On going Support on-going seminars on new wireless technologies – On going Goals and Objectives for the 18th meeting of WP 8A (March 2006): Continue to develop a DNR on integrated millimeter wave ITS radiocommunication systems (see Annex 5) Complete second draft of Vol. 4 (ITS) of the Land Mobile Handbook Continue to develop a DNR on next generation ITS radiocommunication systems (see Doc. 8A/58 Annex 16 – Working document toward a preliminary draft new Recommendation on radiocommunication requirements of next generation intelligent transportation systems (ITS)) Review regional activities (ETSI, ASTAP, CITEL). The Chairman of WG 2 thanks all the colleagues and administrations that have contributed to advance the various ITS items. WG 2 looks forward to the next meeting of WP 8A in March 2006. D:\99025843.DOC 26.07.2016 -48A/277(Annex 3)-E 3 Working Group 3 – Public protection, trunking and paging (Chairman: Mr. Alan Jamieson, NZL) Working Group 3 met on one occasion and was attended by up to12 representatives. Two input documents were considered. The chair also prepared draft text for inclusion in Section 6 of a working document to be based on Document 8A/258 from Canada (see Annex 14). Document 8A/229 (Germany and 18 other CEPT countries) and Document 8A/249 (USA) proposed revisions to Annex 2 of PDNR [LMS.PP] as contained in Annex 6 of the Chairman’s report of the 15th meeting of WP 8A (refer to Document 8A/121). Annex 3 of the Chairman’s report of the 16th meeting of WP 8A (refer to Document 8A/202). Agreement was reached on text for the remaining issue in Annex 2 and the document as a whole was approved. Furthermore Working Group 3 agreed that the status of the document should be raised to a DNR and if approved by WP 8A the document should be submitted to SG 8 for final approval. Working Group 3 also noted with interest Section 4 of Document 8A/239 the report of the Region 2 Rapporteur on recent activities in Canada regarding PPDR applications in the 4 940-4 990 MHz band. Working Group 3 was also advised that CEPT countries have recently commenced studies on wideband and broadband PPDR applications noting that Resolution 646 (WRC-03) does not include provisions for such applications within Region 1. In regard to future work at future meetings of Working Party 8A, the objectives for Working Group 3 will be to: 1) Continue studies as directed by WRC-03 in the context of Resolution 646 (WRC-03) on implementation of technologies for future advanced PPDR solutions. 2) Consider proposals for revision of Report ITU-R M.2033. Finally, I would like to thank the participants of Working Group 3 for their contributions and cooperative approach to the discussions and in particular Mr Thomas Weilacher (Germany) for his assistance with the final text of the DNR. 4 Working Group 4 – Interference and sharing (Chairman: Mr. Bruno Espinosa, France) Working Group 4 met 5 times during the 17th meeting of WP 8A and considered 24 documents assigned to the WG and 3 annexes of the Report of the 16th meeting. One PDNR (on protection of land mobile systems from terrestrial digital video and audio broadcasting systems in the VHF and UHF shared bands) has been approved as a DNR for submission to SG 8, one PDNR, formerly referred as [LMS.CHAR] has been significantly amended with its scope slightly changed to focus on technical characteristics of trunked and conventional land mobile systems in the VHF and UHF bands, one working document towards a PDNR on technical characteristics of cellular digital LMS systems for sharing studies has been revised to become a PDNR. One working documents towards a PDN Recommendation and one working documents towards a PDN Report have been initiated on respectively methodologies for LMS sharing studies and technical characteristics for BWA studies to be used in sharing studies. Seven liaison statements were drafted. In addition, a note to the Director of the Radiocommunication Bureau and two documents attached to it have been produced on the inter-sessional planning activities for the RRC. D:\99025843.DOC 26.07.2016 -58A/277(Annex 3)-E 4.1 Land Mobile System Characteristics – Sharing WG 4 noted documents 8A/206 from WP 9D on the revision of ITU-R Recommendation F.1336 and Doc. 8A/215 from TG 1/8 on the progress of their studies on the impact of systems using UWB technology on land mobile systems. WG 4 considered Document 8A/218 from WP 8F asking WP 8A, WP 9B and WP 9D to review the characteristics contained in Annex 1 of this document for their sharing studies between IMT-2000 and fixed BWA systems including nomadic using various technologies within the 2.5-2.69 GHz band. It was agreed that, within the systems addressed in Document 8A/218, it was only required to review the characteristics of IEEE P 802.16e systems, the other systems being in the scope of SG 9. Document 8A/264 from the WiMax Forum provided confirmation of the validity of the characteristics sent by WP 8F on IEEE 802.16-2004 and P802.16e systems. It was noted that Document 8A/265 from the WiMax Forum contained some general information related to IEEE 802.16 standards that may assist further deliberations. Document 8A/260 from Arraycom contained a proposal for the development on a Working Document toward a PDNR for “Sharing Characteristics of BWA systems operating in the Mobile Service” and suggested to send such document to WP 8F. It included also the characteristics of ANSI’s newly adopted HC-SDMA standard. Document 8A/246 from the United States of America was of a general nature, expressing views on the work in development within WP 8A. It contained specific proposals to amend Doc. 8A/202, Annex 11, the working document on digital cellular land mobile station characteristics for sharing studies. Document 8A/255 from Canada proposed a possible way forward on the work on the development of deliverables on LMS characteristics for sharing studies. It was proposed to break the existing PDNR LMS.CHAR into several recommendations to deal with different types of mobile applications that have similar technical and operational characteristics. These recommendations on characteristics would follow a consistent format and focus on the desirable parameters for sharing studies. It was also suggested that a general Recommendation on the methodologies and procedures for sharing studies would be a useful tool and would help to simplify future characteristics documents. Document 8A/256 from Canada contained proposals to amend and simplify the PDNR LMS.CHAR which would focus on conventional and trunked systems below 470 MHz. It was pointed out that the frequency range may be extended to cover similar systems operating in bands up to 960 MHz band. After a general discussion on the principles, it was agreed that WG4 work on LMS characteristics and sharing would be organized as follows: - development of a working document towards a PDNR on the methodologies for sharing studies related to land mobile systems, - development of a PDNR based on the PDNR LMS.CHAR as amended by Canada in document 8A/256 on the characteristics of trunked and conventional LM systems, - development of a PDNR on technical and operational characteristics of digital cellular land mobile systems to be used in sharing studies based on the Annex 11 to Document 8A/202 and the proposals contained in Document 8A/246, D:\99025843.DOC 26.07.2016 -68A/277(Annex 3)-E - development of a working document towards a preliminary draft new report on Characteristics of Broadband Wireless Access systems operating in the Mobile Service for frequency sharing and interference analyses that will contain the relevant characteristics contained in Documents 8A/260 and 8A/264. Regarding the three last documents on LMS characteristics, it was agreed that the table and text describing the minimum desirable characteristics provided in the Canadian contribution 8A/255 should be used for future Recommendations on LMS characteristics. These recommendations should focus on only the characteristics needed for sharing studies. It was decided to set up a drafting group under the chairmanship of Mr. Suneil Kanjeekal (Canada) to work on the four deliverables mentioned above and to draft appropriate liaison statements to WP 8F and the standardisation organisations. As a result of the drafting group activities, the following output documents were produced: Working Document towards a PDN Recommendation M.[METH.SHAR.LMS] (Annex 6) o Outline for a working document on methodologies for LMS sharing studies based on Document 8A/255 with some material taken from the previous version of LMS.CHAR. o General outline, but includes a list. o Input is requested into the next meeting of WP 8A on the methodology. PDN Recommendation M.[LMS.CHAR.VHF-UHF] (Annex 7) o Replaces the old PDNR M.[LMS.CHAR] found in Annex 8 of Document 121 and focuses on conventional and trunked systems operating in the VHF and UHF bands. o Based on the contribution 8A/256. o Proposed to include a limited number of typical and representative set of characteristics rather than a full range of specific systems. o Administrations are asked to review the tables in Annex 8 of Doc 121 to ensure that no information contained in these tables that have been suppressed is still needed. o It was noted that some systems also exist in bands greater than 470 MHz, and the title was modified to reflect this. o Further input is requested into the next meeting of WP 8A on characteristics of systems in other frequency bands within this range in order to advance the PDNR into a DNR. o It was noted that there may be some overlap with the digital cellular recommendation (discussed below) because of the different uses of these bands in different countries. PDN Recommendation M.[LMS.CHAR.CELL] (Annex 8) o Provides technical and operational characteristics of digital cellular land mobile systems to be used in sharing studies o Annex 11 of Doc 202 was turned into a PDNR on this topic based on contribution 8A/246 which made modifications to Table 1 on the characteristics of digital cellular land mobile telecommunications systems for sharing studies. o The table was also formatted inline with the methodology and the proposal contained in Document 8A/255. o Further input is requested into the next meeting of WP 8A on characteristics of digital cellular systems in order to advance the PDNR into a DNR. o It was agreed to send a liaison statement to the relevant SDO’s to inform them of this recommendation and seek input (Section 4.1 in Annex 2). Working Document towards a PDN Report M.[LMS.CHAR.BWA] (Annex 9) o This working document was developed based on Documents 8A/260, 8A/264, 8A/265 and was formatted inline with the discussion in the methodology. D:\99025843.DOC 26.07.2016 -78A/277(Annex 3)-E o There was discussion whether this information is better captured in a Report or Recommendation and it was agreed that, for the time being, the option of a Report is chosen. Further consideration may be needed on the issue at the next WP 8A meeting. o Further input is requested into the next meeting of WP 8A on characteristics of BWA systems. o A liaison statement drafted by WG 7 (see Section 4.2 in Annex 2) has been sent to the relevant SDO’s to inform them, amongst other issues, of this PDN Report and seek input. Liaison to WP 8F o A reply liaison statement was sent to WP 8F (see Annex 2) regarding sharing studies in the 2 500 -2 690 MHz band to inform them of development of a working document towards a PDNR on BWA characteristics, PDNR M.[LMS.CHAR.BWA] (Annex 9). o Noted the characteristics of IEEE P802.16e in Annex 1 of the liaison statement from WP 8F and a confirmation of those characteristics as given in Doc 8A/264. 4.2 Work related to broadcasting issues - RRC 4.2.1 Protection of land mobile systems from terrestrial digital video and audio broadcasting systems in the VHF and UHF shared bands allocated on a primary basis WG 4 has continued the work on the PDNR on the protection of LMS from terrestrial digital broadcasting in the VHF and UHF bands. Documents 8A/212 and 8A/222 were two liaison statements produced by WP 9D and the IPG-1 respectively containing specific comments to the PDNR. WG 4 also considered the elements contained in Documents 8A/208 (WP 9D) and 8A/220 (IPG-1) related to the protection of the land mobile service interfered with by digital broadcasting. Document 8A/227 was submitted by Israel and proposed amendments to the PDNR based on the comments submitted by the WP 9D and the IPG. It included also editorial improvements to the PDNR, in particular its Annex 1. In Document 8A/269, comments were expressed by the Planning exercise team (PXT) on the absence of values of the overlap correction factor K in the case of 7 MHz DVB-T and values for this factor were proposed. A drafting group was created under the chairmanship of Mr. Haim Pistiner (Israel) to discuss these proposals in details and modify the PDNR as appropriate. The drafting group was also tasked to analyse the proposal related to Resolution COM4/6 made by the United Kingdom in Document 8A/262 and to check its consistency with the PDNR (See 4.2.2). The drafting group produced a revised version of the PDNR which included the proposals from Israel, corrections related to the overlap correction factor suggested by WP 9D and the PXT and was in accordance with the observations from the IPG. Additional slight amendments proposed during the final review of the document were also taken on board. It was agreed by WG 4 that the resulting version would be submitted to the WP 8A plenary for approval as a DNR (Annex 2). A liaison statement to WP 9D and WP 6E was drafted (Annex 2) to inform them about the results of WP 8A deliberations regarding the protection of LMS from digital broadcasting in the VHF and UHF bands. 4.2.2 Studies requested by the first session of the RRC on Resolutions COM4/2, COM4/6 and COM4/7 - Resolution COM4/2 - Development of protection criteria for terrestrial digital television systems interfered with by terrestrial services other than broadcasting D:\99025843.DOC 26.07.2016 -88A/277(Annex 3)-E No further work was done on this issue. - Resolution COM4/6 - Development of protection criteria for land mobile services using narrow-band frequency modulation interfered with by terrestrial audio broadcasting systems A proposal contained in Document 8A/262 related to Resolution COM4/6 was considered. After analysis of the proposal, it was noted that it was consistent with the PDNR developed by WP 8A and the proposal was endorsed. The proposal is summarised below. Proposal It is proposed that the field strengths to be protected for narrow-band FM mobile systems from T-DAB, in the band from 174 to 230 MHz, should be: Base station 7 dBV/m at 20 metres Mobile 15 dBV/m at 1.5 metres It is also proposed that the frequency separation protection ratios should remain as proposed in the Report from RRC-04. This proposal is reflected in the note to the Director of the Radiocommunication Bureau contained in Section 3 of Annex 2. - Resolution COM4/7 - Development of methods for the identification of administrations whose existing and planned digital and analogue assignments/allotments in the broadcasting service and assignments to other primary services may be affected by the application of the interim coordination procedures adopted by the first session of the Regional Radiocommunication Conference (Geneva, 2004) WG 4 noted Document 8A/244 sent by the Chairman of the RPG on the work performed by the SWG 1 of the WP of the RPG on the preparation of draft example regulatory texts to be considered by the RPG for inclusion in the draft new regional agreement. WG 4 started to develop a proposal for a chapter of the Annex 4 of the Agreement on limits relating to the protection of the mobile service from modifications of the Plan. This is based on trigger values criteria developed within CEPT and brought to the attention of WP 8A by the IPG Chairman in Document 8A/266 (Appendix B, sections B1 and B2 in particular). These criteria were reviewed and modified, where appropriate. Document 8A/272 that provides initial comments from the BR on Document 8A/266 was considered. The draft proposal is included in Attachment 1 to Section 3 in Annex 2, which provides additional remarks and identification of areas for further work. Attachment 1 to Section 3 in Annex 2 contains also comments from WP 8A on the section B.3 of the Appendix B of Document 8A/266, which deals with coordination triggers to protect the Broadcasting Service from other primary services. This document is attached to the note to the Director of the BR and is also sent to WP 6E (copy to WPs 7D, 9D and 8B) through a liaison statement (Annex 2). 4.2.3 Views from WP 8A on the working assumptions for RRC WG 4 noted Documents 8A/203 and 8A/208 giving views expressed by WP 8B and WP 9D respectively on the working assumptions for intersessional activities. D:\99025843.DOC 26.07.2016 -98A/277(Annex 3)-E At its July 2005 meeting, IPG-1 created a new set of working assumptions to be considered by ITU-R WPs. The working assumptions within the scope of WP 8A were provided in Document 8A/220. Regarding the generic protection ratios for LMS to be considered in the RRC process, WG 4 confirmed the validity of the assumptions amended by WP 9D and agreed by the IPG-1. Regarding the values of the overlap factor in the case of 7 MHz DVB-T, WG4 agreed that these values should be provided and endorsed the values proposed by the PXT in Annex 1 of Document 8A/269. WG4 produced a document (Attachment 2 to Section 3 in Annex 2) which summarises WP 8A’s views on the working assumptions identified by IPG-1 within the scope of WP 8A. This document is to be attached to the note to the Director of the BR. In Document 8A/221, the IPG invited various Working Parties to review the existing protection criteria for the radiocommunication service concerned interfered with by analogue broadcasting with a view to identifying the relevant criteria which should be applied. WG 4 had a review of the ITU-R deliverables and identified that the Report ITU-R M.1031-1 was addressing the issue of sharing between analogue broadcasting and the mobile service. Although this Report gives one example of protection criteria for one specific system in the mobile service (median field strength to be protected at 22 dBµV/m, with a protection ratio of 10 dB), WG 4 could not identify existing protection criteria applicable in general for the mobile service interfered with by analogue broadcasting. This was reported in the note to the Director of the BR (Section 3 in Annex 2). 4.2.4 Further work on RRC issues WP 8A intends to continue its work at its next meeting to assist the Intersessional activities on the protection criteria of the mobile service and technical requirements that will facilitate the coexistence between digital broadcasting and the systems in the mobile service. 4.3 Work related to WRC-07 Agenda items Working group 4 considered liaison statements received at this meeting from WP 8B and WP 9D on respectively WRC-07 Agenda items 1.5 and Recommendation 723 (WRC-03) where WP 8A has been identified as a supporting working party. In addition, a document from Canada dealing with WRC-07 Agenda item 1.11 was considered and documents received at the previous WP 8A meeting on WRC-07 Agenda item 1.2 and Rec. 723 were reviewed. 4.3.1 Agenda item 1.2 (Res. 742, Res 746) At its 16th meeting, WP 8A received in Document 8A/170 a liaison statement from WP 7C on sharing analyses between the EESS (passive) and the SRS (passive) on one hand and the fixed and mobile services on the other hand in the bands 10.6-10.68 GHz and 36-37 GHz to determine appropriate sharing criteria as requested by Resolutions 746 (WRC-03) and 742 (WRC-03) and a call for contribution was made for this 17th meeting regarding informations on the use of these bands by the mobile service. However, no contribution was received at this meeting. WG 4 analysed the request from WP 7C and drafted a reply to WP 7C (Annex 2) giving views from WP 8A on the methodology used by WP 7C in the studies. Concerning the required information on the characteristics concerning current or planned MS use of the 10.6-10.68 GHz and 36-37 GHz bands, WP 8A members are invited to submit contributions for the next WP 8A meeting. D:\99025843.DOC 26.07.2016 - 10 8A/277(Annex 3)-E 4.3.2 Agenda item 1.5 (Res. 230) In Document 8A/205 sent by WP 8B, WP 8A was informed about a list of candidate bands for further study to determine the feasibility of sharing between other primary radiocommunication services and Aeronautical Mobile Telemetry (AMT) operations. This list includes the 4 400-4 940 MHz, 5 925-6 700 MHz, 22.5-23.6 GHz, 24.75-25.5 GHz and 27.0-27.5 GHz bands. WG 4 considered Document 8A/274 that WP 8B sent to WP 8A during the meeting. This paper was referring to studies considered by WP 8B (8B/252) on the frequency sharing between fixed service (FS) and mobile service (MS) and wideband aeronautical mobile telemetry and telecommand (AMT) systems in the bands 4 400-4 940 MHz and 5 925-6 700 MHz. WP 8A members are requested to provide for the next WP 8A meeting information on the existing or planned use of the bands 4 400-4 940 MHz and 5 925-6 700 MHz by the mobile service and to submit comments on the analysis and assumptions contained in Document 8B/252. A short liaison statement to WP 8B was drafted (Annex 2). 4.3.3 Agenda item 1.11 (Res. 545) WG 4 noted in the relevant sections of Document 8A/246 from the United States of America related to WRC-07 Agenda Item 1.11 the need to provide characteristics of LMS and sharing studies to WP 6E in the framework of the preparation of WRC-07 Agenda item 1.11. WG 4 considered Document 8A/259 submitted by Canada. This document evaluates the potential impact of Broadcasting-Satellite Service (BSS) operating in the 620-790 MHz interference on land mobile systems used in the bands 764-770 MHz and 794-800 MHz for public safety applications. This study included the analysis of the interference from a single e BSS satellite into the land mobile systems and a statistical analysis of aggregate interference from a GEO at longitude 65˚W and a HEO at longitude 90˚ W, latitude 55˚ N and at a distance of 53 481 km. The pfd levels given in the Recommendation 705 were used as a basis. It was pointed out that an I/N of -12 for the protection of LMS was assumed for the study, which is not consistent with the information previously sent to WP 6E and WP 6S mentioning a required I/N of -6. It was therefore agreed to amend the study to include simulations and results with values of I/N of -6 and -12. The modified study was attached to a liaison statement to WP 6E and WP 6S (Annex 2) asking these two groups to review this study and to provide additional information. 4.3.4 Recommendation 723 (WRC-03): ENG WG 4 noted the liaison statement (Document 8A/208) from Working Party 9D that gives information on the work of WP 9D on a working document towards a Preliminary Draft New Recommendation “System characteristics for sharing with analogue and digital television outside broadcast (TVOB), electronic news gathering (ENG) and electronic field production (EFP) in the fixed service”. No further contribution was received on this issue. 4.3.5 Work plan for the work to be carried out by WP 8A on issues related to WRC-07 This work plan identifies the issues for which contributions are needed for the next WP 8A meeting in order to provide consolidated responses. D:\99025843.DOC 26.07.2016 - 11 8A/277(Annex 3)-E Agenda Item 1.2 (Res. 742) – Sharing between EESS/SRS (passive) and fixed/mobile services in 36-37 GHz Leading Group WP 7C Documents 8A/170 1.2 (Res 746, issue 2) 1.2 (Res. 746, issue 1) – Sharing GSO Meteo Satellite systems and FS, FSS, Ms in 18-18.4 GHz WP 7B 8A/70 1.5 (Res 230) – Consideration of mobile allocations for use by wideband aeronautical telemetry and associated telecommand WP 8B 8A/205, 8A/274 D:\99025843.DOC Issues WP 8A required action Working Party 7C would appreciate any information that could be provided concerning current or planned MS use of the 10.6-10.68 GHz and 36-37 GHz (typical transmitter powers, antenna gains, and bandwidths of MS stations). Deployment information (estimated number of transmitters in a reference area) is also necessary for the interference simulations being conducted. - Views on studies conducted by WP 7C (Doc. 7C/146-Annex 12) - Views on the draft CPM text (Doc. 7C/146-Annex 11) Sections 2/1.2/2.3/4 and 2/1.2/3.3/4 - Information and technical studies that may be required to address this Agenda item - Appropriateness of assigning the short- and long-term interference budget equally between space and terrestrial (fixed and mobile) services and of the equivalent number of interferers WP 8B has identified several bands as warranting further study to determine the feasibility of sharing between other primary radiocommunication services and Aeronautical Mobile Telemetry (AMT) operations. These bands include the 4 400-4 940 MHz, 5 925-6 700 MHz, 22.5-23.6 GHz, 24.75-25.5 GHz and 27.0-27.5 GHz bands. Initial studies (8B/252) have been conducted in WP 8B for the bands 4 400-4 940 MHz and 5 925-6 700 MHz. Some information has been sent to WP 7C (Annex 2). WP 8A members are requested to provide for the WP 8A March 2006 meeting information on the MS parameters and deployment characteristics in the 10.6-10.68 GHz and 36-37 GHz bands, to provide views and comments on the sharing studies provided in Annex 12 to Document 7C/146 and on the draft CPM text contained in the Annex 11 to Document 7C/146. - 26.07.2016 WP 8A members are requested to provide information on the existing or planned use of the band 18-18.4 GHz for MS and to provide comments on the annex to Document 8A/70 paying attention to Table 6. WP 8A members are requested to provide for the next WP 8A meeting information on the existing or planned use of the bands 4 400-4 940 MHz, 5 925-6 700 MHz, 22.5-23.6 GHz, 24.75-25.5 GHz and 27.0-27.5 GHz by the mobile service and to submit comments on the analysis and assumptions contained in Document 8B/252 for the 4 400-4 940 MHz and 5 925-6 700 MHz bands. - 12 8A/277(Annex 3)-E 1.11 (Res. 545) – protection of terrestrial services from BSS in the 620-790 MHz band Rec 723 (WRC-03): ENG 4.3.6 WP 6E WP 6P 8A/135, 8A/194 8A/139 The following points requested by WP 6E in Document 8A/194 should be addressed: – System characteristics of the land mobile service currently operating and planned to operate in the frequency band 620-790 MHz – Pfd levels for protection of land mobile services in the frequency band 620-790 MHz; and – Regulatory procedures and conditions under which BSS GSO and non-GSO BSS satellite networks/systems may operate in order to fully protect the terrestrial land mobile service in the frequency band 620-790 MHz. Working Party 6P drew the development of the preliminary draft new Report on Spectrum usage and operational requirements of terrestrial electronic news gathering to the attention of Working Party 8A WP 8A members have been requested to: - Provide information on the use of the band 620-790 MHz for the MS - To submit contributions to the next WP 8A meeting with the view of continuing the development of relevant text for the draft CPM text relating to WRC-07 AI 1.11 - To conduct sharing studies to determine the regulatory means required for the protection of the mobile service from BSS stations. Technical characteristics, proposals for CPM text and initial sharing studies have been sent to WP 6E and WP 6S (Annex 2). Additional information may be required. WP 8A members views are sought on: – System characteristics for sharing between land mobile, TVOB and ENG – Land mobile services currently operating in frequency bands assigned TVOB and ENG; and – Current status of regulatory procedures within administrations for sharing between land mobile, TVOB and ENG. Other WRC-07 Agenda items (1.6, 1.7, 1.17) No document was received on these agenda items which were consequently not addressed at this meeting. 4.4 Other issues WG 4 took note of Document 8A/258 from Canada proposing a guide to existing ITU texts on the land mobile service. Ms Reema Hafez, coordinator of the Ad hoc Guide group created by WP 8A, reported about the progress of the group, the output of this group being found in Annex 14. It was pointed out that Sections 3 and 4 on spectrum sharing and interference respectively need to be developed and that contributions from WG 4 are needed. It is proposed to work by correspondence on these sections of the guide and to provide inputs to the coordinator of the Ad Hoc group. D:\99025843.DOC 26.07.2016 - 13 8A/277(Annex 3)-E 4.5 Objectives for the 18th meeting The objectives for the 18th WP 8A meeting regarding WG 4 activities are the following: – progress the developments of the deliverables on technical characteristics of land mobile systems for the sharing studies (PDNRs M.[LMS.CHAR.VHF-UHF] and M.[LMS.CHAR.CELL] and the working document towards a PDN Report M.[LMS.CHAR.BWA]); – progress the development of the working document towards a PDNR M.[LMS.CHAR.METH] on the methodologies to be used in the sharing studies related to the land mobile service; – continue the work required on issues related to the RRC-06; – provide assistance to the relevant Working Parties on WRC-03 Agenda items 1.2, 1.5, 1.11 and Recommendation 723 (WRC-03) and if required, on WRC AI 1.6, 1.7 and 1.17. 4.6 Conclusion The WG 4 Chairman would like to thank Mr Haim Pistiner (Israel) and Mr. Suneil Kanjeekal (Canada) for their excellent work as drafting group chairmen, Ms. Reema Hafez (Canada) for her assistance in the drafting and all the WG 4 participants for their work and their good spirit of compromise. 5 Working Group 5 – New technology and services (Chairman: Mr. Hitoshi Yoshino, Japan) WG 5 met two times during the 17th meeting of ITU-R WP 8A from 22 – 28 September 2005. Around 25 delegates from Germany, Canada, Korea, the USA, Japan, New Zealand, the Netherlands, the UK, Ericsson, Lucent Technologies, IEEE and SDR Forum, participated in the meetings. The tasks assigned to WG 5 address new technologies and services and cellular (pre-IMT systems). Twelve input contributions and one informal contribution were attributed to WG 5, which were: – Software Defined Radio: Documents 8A/219 (WP 8F), 226 (J), 228 (Convenor SDR Ad-Hoc Group), 242 (IEEE), 252 (CAN), 253 (D), 261 (ArrayComm), Informal contribution (USA) – IP Applications over mobile systems: Documents 8A/214 (Ericsson, Motorola, Nokia, Siemens and Telecom Italia), 217 (WP 8F), 237 (KOR), 254 (CAN), 267 (KT Corporation). WG 5 established the two drafting groups to facilitate its work: DG (Chairperson) Terms of Reference DG 1 (Ms Cindy Cook, Canada) – Develop a working document toward a preliminary draft new (PDN) Report on Software Defined Radio in the Land Mobile Service [LMS.SDR] and – Develop a liaison statement to WP 8F DG 2 (Mr Hitoshi Yoshino, Japan) – Develop a working document towards a PDN Report or Recommendation ITU-R M.[IP CHAR] on key technical and operational requirements for access technologies to support IP applications over mobile systems and – Develop a liaison statement to WP 8F D:\99025843.DOC 26.07.2016 - 14 8A/277(Annex 3)-E 5.1 Software defined radio (SDR) Document 8A/219 was a liaison statement from WP 8F, which informed WP 8A of WP 8F’s response to the WP 8A’s suggestion in Document 8F/445, including the adoption of the revised WP 8A’s definition of SDR and provided its Draft New Report ITU-R M.[IMT.SDR]. Document 8A/226 proposed a new text on Intelligent Transport Systems (ITS) as a new section under Section 5 of the current working document (Annex 13 of Document 8A/202). Document 8A/228 was an update on progress of the WP 8A Ad-Hoc SDR Group, which has been taking place through the WG 5 reflector (wp8a-wg5@itu.int). It provided the updated working document towards a PDN Report ITU-R M.[LMS.SDR] and summarized information on suggested change to the current definitions from one organization during the Ad-Hoc activities. Document 8A/242 proposed additional changes to the current working document. It provided acronyms, proposed changes of spectrum management section, additional text on Cognitive Radio for Section 4.1 of illustration of advanced radio concept in Document 8A/228 and proposed modification to Figure 4 in the working document. Document 8A/252 proposed general and specific revisions to the working document towards a PDN Report ITU-R M.[LMS.SDR] together with the views that the common definition between WP 8A and WP 8F should remain unchanged and that WP 8A’s SDR Report should keep consistency with WP 8F’s SDR Report by reviewing them, e.g. overlap or discrepancies of the text. Document 8A/253 proposed that the definition that is only related to SDR should be kept in a PDN Report [LMS.SDR] and all other definitions that are out of scope from a viewpoint of Question 230-1/8 should be removed from the document. It also proposed a modification to Dynamic Frequency Selection (DFS) definition, deletion of Figure 1 and related text in the current working document and addition of the text on technical characteristics. Document 8A/261 proposed a revised text on ITS for Annex C of the current working document, addressing that the important need to bridge the gap between the short lifecycles of telecommunications systems and networks, and longer design lifecycles of vehicles. Informal contribution on SDR from the USA was assigned to WG 5. It proposed modifications to the working document towards a PDN Report ITU-R M.[LMS.SDR]. The proposed texts relating to an SDR application to ITS were separately considered at WP 8A WG 2. The developed text was provided to WG5 for the inclusion in the working document. Based on these contributions together with the provided text on ITS, WG 5 developed the working document towards a PDN Report ITU-R M.[LMS.SDR] and successfully completed its work on a PDN Report ITU-R M.[LMS.SDR] (Annex 2). WG 5 also decided to develop a liaison statement to WP 8F to inform it of the completion of the PDN Report ITU-R M.[LMS.SDR] (Annex 2). 5.2 IP Applications over mobile systems Document 8A/214 provided information on IP over mobile systems which has been carried out by 3GPP. Provided information contained both features currently available and future developments currently under study in 3GPP. Document 8A/217 was a liaison statement from WP 8F, which informs WP 8A that WP 8F has decided to start work on the development of the working document towards a PDN Report or Recommendation ITU-R M.[IP CHAR] in response to Question ITU-R 223 which is jointly assign to WPs 8A and 8F. It also informs WP 8A that WP 8F sees that the first step in addressing Q.223/8 is the development of a document delineating the essential technical and operational high level D:\99025843.DOC 26.07.2016 - 15 8A/277(Annex 3)-E characteristics required in mobile systems to support IP applications. The framework of the working document was also attached to the liaison statement. Document 8A/237 proposed a text on location information services for mobile internet systems for inclusion in the working document on IP applications over mobile systems. It provided a method to overcome the limit of existing Internet services and to facilitate convergence between broadcasting and communications. It suggested that the proposed method is very valuable to Location Based Service (LBS) and ITS applications. Document 8A/254 proposed a preliminary schedule for the development of the joint document on IP applications over mobile systems between WPs 8A and 8F. It also proposed working list of reference material for the development of the joint working document towards a PDN Report or Recommendation ITU-R M.[IP CHAR]. It finally proposed two alternative texts for the working document toward a PDNR ITU-R M.[IP CHAR]; one addressed the requirement for mobile systems to support IP applications based on IETF documents, and the other addressed the capabilities of mobile systems based on 3GPP documents. Document 8A/267 proposed a protocol for improving UDP performance over wireless networks and its application to mobile robot control, in which both real-time operation and reliability of control data were taken into account. Based on these contributions, WG 5 discussed working method for IP applications over mobile systems in response to Q.223/8. WG 5 reached a common view that the first step in addressing Q.223/8 is the development of a document delineating the essential technical and operational characteristics required in mobile systems to support IP applications. WG 5 also decided to start its work on IP applications over mobile systems by jointly develop through liaison with WP 8F a single working document toward a PDNR ITU-R M.[IP CHAR], taking into consideration that Q.223/8 is jointly assigned to WPs 8A and 8F. WG 5 developed a proposed joint workplan as shown in Table 1. TABLE 1 Proposed workplan for the joint development of the working document towards a PDNR ITU-R M.[IP CHAR] Meeting Dates WP 8A 2006-05 2006-08 Work completed 2007-05 D:\99025843.DOC Work completed 2006-12 2007-06 WP 8A and WP 8F inform SG 8 of the progress 2006-01 2007-06 Work started 2005-11 2006-09 Description 2005-10 2006-03 SG 8 2005-06 2005-09 WP 8F Seek adoption Further work if required Further work if required Seek adoption if required 26.07.2016 - 16 8A/277(Annex 3)-E WG 5 also develop its view that it is premature to decide whether the working document should be a Report or Recommendation at this stage, and that working document could be a Preliminary Draft New Recommendation if it can adequately address requirements for mobile systems to support IP applications, while the document would be a Preliminary Draft New Report if it only describes the capabilities of the existing mobile systems to support IP applications. Base on the above views as well as contributions to this meeting, WG 5 developed the working documents towards a PDNR ITU-R M.[IP CHAR] (Annex 10) and a liaison statement to WP 8F (Annex 2). 5.3 Future work At the next meeting of WP 8A, WG 5 plans to continue the development of the working document toward a PDNR ITU-R M.[IP CHAR].WP 8A encourages Administrations and other members to submit materials on IP applications over mobile systems. WP 8A encourages participants to stay abreast of WP 8F’s activities on this topic. WG 5 continues its studies on Adaptive Antenna (Question ITU-R 224-1) and welcomes contributions for the development of Recommendations, Reports or Handbooks, which will follow Recommendation ITU-R M.1678 and Report ITU-R M.2040. WG 5 further continues its studies on Software Defined Radio (Question ITU-R 230-1) and welcomes contributions for the development of Recommendations, Reports or Handbooks, which will follow Report ITU-R M.[LMS.SDR]. WG 5 continues to contribute to the development of the working document on vocabulary focusing on new technologies and services, including IP applications over mobile systems, SDR and Adaptive Antenna. Finally the WG 5 Chairman would like to thank Ms Cindy Cook for her excellent chairmanship to complete SDR Report and all participants for their contributions to work of the group. 6 Working Group 7 – Wireless Access Systems, including RLANs (Chairman: Mr. Stephen Bond, UK) 6.1 Introduction WG 7 met three times and considered Documents: 8A/234 (Japan), 8A/257 (Canada), 8A/273 (USA), related to Resolution 229 (WRC-03); and further considered, 8A/211 (WP 9B), 8A/223 (IEEE), 8A/235 (Korea), 8A/247 (USA), 8A/251 (USA) and 8A/265 (WiMAX Forum), related to development of the PDNR M.[8A/BWA]. 6.2 Resolution 229 - DFS Document 8A/234, from Japan, proposed a modification of Recommendation ITU-R M.1652 with an objective of creating common test methods for WAS/RLANs to facilitate global standardization. Documents 8A/248 and 8A/273, from the USA, proposed the creation of a separate report or recommendation to compliment Recommendation ITU-R M.1652, and further proposed the creation of a WP 8A correspondence group to take forward the work. Document 8A/257, from Canada, presented the results of DFS testing for information. These tests were particularly focused on the requirements to protect meteorological radars. The meeting supported the work undetaken by each of these administrations in response to Resolution 229 (WRC-07) and noted that other administrations are also active in this area. The proposed correspondence group was supported by WG 7 as the most efficient way to progress the work and terms of reference as follows: D:\99025843.DOC 26.07.2016 - 17 8A/277(Annex 3)-E WG 7 CORRESPONDENCE GROUP FOR DEVELOPMENT OF TEXT RELATING TO TESTING PROCEDURES FOR THE IMPLEMENTATION OF DYNAMIC FREQUENCY SELECTION At the September 2005 WP 8A meeting it was decided to establish a correspondence group to address the development of text relating to testing procedures for the implementation of Dynamic Frequency Selection (DFS). Delegates are urged to join the WG 7 e-mail reflector that will be used by this group (wp8a-wg7@itu.int) and to provide contributions for the March 2006 WP 8A meeting. The input contributions to-date have been taken into account in Annex 11 as baseline text for the Correspondence Group. This group will accomplish its work primarily by electronic means in between meetings. The terms of reference for this group are as follows: 1) Develop a generic Recommendation/Report on testing procedures for implementation of Dynamic Frequency Selection 2) Include suitable Administration test procedures as annexes that would be referenced by the Recommendation/Report as a means of providing conformance testing for DFS functionality. These procedures should include equipment setup, test methodology, and detection requirements. 3) to consider appropriate modification of M.1652 to align text with the document being prepared by the Correspondence Group. 4) Complete its work prior to 2009. Convenor Charles Glass (USA) cglass@ntia.doc.gov It should be noted that the proposals from Japan superseded the existing working document in Annex 14 of the Chairman’s report of the previous WP 8A meeting, and were incorporated into the document carried forward in Annex 11. 6.3 BWA Document 8A/234, contained a liaison statement from WP 9B informing WP 8A of developments in BWA in their area of responsibility. It was agreed that WP 8A should provide an informative response along similar lines, in the interest of continued good co-operation. Document 8A/223, from the IEEE proposing development of the working document towards PDNR M.[8A/BWA]. This proposal modified the existing working document to become a recommendation addressing a single standard for a radio interface for IEEE 802.16. Document 8A/235, from Korea, proposing development of the PDNR M.[8A/BWA]. It was agreed by the group to consider an updated version of this document identified within WG 7 as 8A/235 rev 1. This document made a number of detailed changes to the existing working document, whilst maintaining the reference to the IEEE 802.16 radio interface. Document 8A/247, from the USA proposing a new question to address the fact that Question 212/8 is concerned with nomadic wireless access, whilst the PDNR M.[8A/BWA] encompasses the broader category of BWA (i.e. covering mobile and nomadic). Document 8A/251, from the USA proposing modification of the PDNR M.[8A/BWA] to broaden the range of standards recommended. D:\99025843.DOC 26.07.2016 - 18 8A/277(Annex 3)-E Document 8A/265, from the WiMAX Forum – after careful consideration (in the presence of the WiMAX Forum and the WG 4 Chairman) it was agreed that this document would be more appropriate for consideration by WG 4. The proposal for a new question was opposed by one administration on the grounds that: it was not necessary since Q 212/8 was adequate for this purpose; it would be more appropriate to review all questions at the end of the study period, rather than consider one in isolation; and if it were agreed that Q 212/8 was not relevant to this work then Q 107/8 would be. After extensive discussion, it was agreed to proceed with development of a working document towards a new question, addressing Broadband Wireless Access in the mobile service so as to compliment Q 212/8. One administration indicated that they could accept this way forward but may revisit the issue in subsequent discussions. The preliminary draft question was eventually submitted to WP 8A (Annex 2). The proposals for modification of the working document towards a PDNR M.[8A/BWA] suggested two possible courses of action: a recommendation for a single standard; and a recommendation addressing multiple standards. There were widely differing views on how to proceed on this issue. Following lengthy debate, it was decided to proceed with two working documents to be attached to the Chairman’s report as a basis for further work. In future meetings it will be necessary to decide on whether to proceed with either or both of these documents, to combine the documents, or to take some other course of action. One sector member reserved their position and indicated that they may revisit the discussion. The working documents can be found in Annex 12 and Annex 13. It was agreed to liaise this information to standards development organizations, copied to WP 9B and WP 8F a copy of the liaison can be found in Annex 2. 6.4 Output documents WG 7 produced the following output documents: - Establishment of a DFS correspondence group (Section 6.2 above and Annex 11) - Liaison to SDO’s on BWA (Annex 2) - Draft new question ITU-R[8A/BWA] (Annex 2) - WD PDNR M.[8A/NWA] (Annex 12) - WD PDNR M.[8A/BWA] (Annex 13) 6.5 Objectives for the next meeting WG 7 proposes that the objectives for the next meeting should be: – To progress the development of the working documents towards a PDNR M.[8A/BWA] and M.[8A/BNWA]. – Review the report from the correspondence group on Res 229 DFS and take appropriate action. 6.6 Chairman’s comments The WG 7 Chairman thanked all participants of the group for their constructive participation, and particularly thanks Charles Glass for successfully chairing an exceptionally challenging drafting group. D:\99025843.DOC 26.07.2016 - 19 8A/277(Annex 3)-E 7 Land mobile handbook rapporteur group (Rapporteur: Ms. Cindy Cook, Canada) The Land Mobile Handbook (LMH) group met once at this WP 8A session with approximately ten delegates in attendance. The group discussed the progress made on Volume 4 of the LMH since the 16th meeting of WP 8A. The editor, Dr. Jongtaek Oh (Korea, Rep. of), gave an update on which sections are mostly completed and which sections still require additional input. The group also discussed how to solicit input from countries in Europe and Region 2 in order to finalize the document. WG 2 (ITS) held a meeting and completed the first draft of Volume 4 of the LMH on ITS. The first draft is an extensive document (about 77 pages) and is available on the LMH reflector. Its completion was made possible due to participation and regular contribution through the LMH reflector since the 16th meeting of WP 8A. WG 2 also reviewed the outstanding text necessary for the completion of Vol. 4. A second and final draft is scheduled for review and completion by February 2006. Also discussed at the LMH meeting were possible topics for additional volumes. Several suggestions were made and one, a volume on BWA, has been added to the schedule. Mr. Charles Glass (U.S.A.) has volunteered to be editor for the BWA volume. The other suggestions were: – new technologies, systems and applications; – PPDR (who, what, technologies, etc.); – mobile services and applications excluding voice; – IP applications over mobile. I will be stepping down as Rapporteur for the LMH. It has been recommended that Reema Hafez (Canada) resume her duties as the Rapporteur from this point forward. I would like to thank the participants for their hard work in progressing Volume 4 of the LMH so quickly and encourage those who are interested in participating in the work on this and further volumes of the LMH to join, and contribute to, the LMH reflector (lmhbook@itu.int) activities. Contact: Ms. Cindy Cook Industry Canada D:\99025843.DOC Tel: +1 613 998-3874 Fax: +1 613 952-5108 E-mail: cook.cindy@ic.gc.ca 26.07.2016 - 20 8A/277(Annex 3)-E TABLE 1 Schedule for Completion of the Work on the Volumes of the Handbook Editor Topic Volume Work to be completed Date Mr. José Costa, Canada Fixed Wireless Access Volume 1 Revision 1 Published1 July 2001 Working Party 8F Principles and approaches on evolution to IMT-2000 Volume 2 Published2 1997 Dispatch and paging systems Volume 3 To be published Completed ITS Volume 4 Revisions to current DSRC section Completed First draft of Vol. 4 Completed Completion of Vol. 4 February 2006 Table of Contents February 2006 Mr Michel Pierrugues, France Suneil Kanjeekal, Canada Dr Jongtaek OH, Korea (Rep. of) Mr. Charles Glass, USA 8 Broadband Wireless Access (BWA) Volume 5 Vocabulary rapporteur group (Acting Rapporteur: Mr. Christian Risone, France) A working document towards a preliminary draft new recommendation has been developed (see Annex 15), based on the work done in the previous meeting (Annex 12 to Doc. 8A/121 and Annex 16 to Doc. 8A/202). It has felt relevant to send this document to the Coordination Committee for Vocabulary (CCV) (see Annex 2). Inputs for the next meeting have been encouraged in order to progress the work. 9 Ad hoc group on guide (Coordinator: Mrs. Reema Hafez, Canada) The Ad Hoc Guide group met once in order to discuss input contribution 8A/258, proposing a guide to existing ITU texts on the land mobile service. It was agreed by the participants that such a guide should be produced and further discussions took place on the details. It was agreed that the guide would be most suitable in the form of a webpage that could be updated at each meeting of WP 8A if necessary, and would not require Study Group 8’s approval. There was also general agreement that the topics provided in Document 8A/258 adequately cover the currently completed work on LMS within the ITU. Regarding the missing text under each topic, it was decided that each of the relevant WP 8A Working Groups work through correspondence between now and the next meeting, in order to develop this text. The section on Intelligent Transportation Systems has been reviewed and revised by Working Group 2; in addition, text has ____________________ 1 http://www.itu.int/publications/productslist.aspx?lang=e&CategoryID=R-HDB&product=R-HDB-25 2 http://www.itu.int/publications/productslist.aspx?lang=e&CategoryID=R-HDB&product=R-HDB-30 D:\99025843.DOC 26.07.2016 - 21 8A/277(Annex 3)-E been added to the section on Public Protection and Disaster Relief by Working Group 3. Both of these changes are reflected in the latest version of the guide in Annex 14. A question was raised on whether or not this guide should also contain ongoing work, in addition to completed work. After some discussion, it was agreed that only completed work will be included. Therefore, WP 8A Working Groups are encouraged to work through correspondence and send any new text to the Ad Hoc Guide Coordinator, who will then submit a consolidated input to the next meeting of WP 8A. 10 Joint Working Group 8A-8B on A.I. 1.13 (Coordinator: Mr. Pekka Lansman, Finland) 10.1 Documents for approval Revised draft CPM-text for 1.13 (Annex 16) Liaison statement to Working Parties 6E and 9C (Annex 2) Some administrations indicated that the method 5/1.13/11.10 is not in accordance with Resolution 351 and therefore changes to Appendix 17 should only relate to the maritime mobile service and not other services. 10.2 Documents to carry forward Documents 8A/224 (8B/199) and 8A/243 (8B/280) Regulatory and procedural considerations for issue E (Annex 17) 10.3 Consideration of the 1.13-related Input Documents for WPs 8A and 8B: D:\99025843.DOC 26.07.2016 - 22 8A/277(Annex 3)-E 8A doc 8B doc Document name Handling of the document - 8B/137 USA: GMDSS modernization and accommodation of maritime MF/HF (2-30 MHz) digital services – analysis of Appendix 17 and proposed modifications This document is mostly superseded by Document 8B/233. Any missing information was brought forward by USA during the drafting of CPM text. 8A/199 8B/180 WP 6E LS: WRC-07 Agenda item 1.13 draft CPM text The information in this doc is included in Documents 8A/216, 8B/194. 8A/202 Annex 4 8B/186 WP 8A LS: Draft CPM text for WRC-07 Agenda item 1.13, Res. 729 taking into account the mobile service requirements The information in this doc is included in Documents 8A/216, 8B/194. 8A/202 Annex 5 8B/187 WP 8A LS: Draft CPM Text On The Issue Formerly Known As Issue (X) responding to the overall objective of Agenda item 1.13 The information in this doc is included in Documents 8A/216, 8B/194. 8A/204 8B/182 Annex 3 WP 8B: LS preliminary draft new Recommendation ITU-R M.XXX This document has no direct implications to the CPM text. It was handled in WG 8A-1. Technical characteristics of HF radio equipment for the exchange of data and email in the Maritime Mobile Service 8A/209 8B/191 WP 9C LS: Draft CPM text proposal for WRC-07 Agenda item 1.13 taking into account the fixed service requirements The information in this document is included in Documents 8A/216, 8B/194. 8A/216 8B/194 Coordination Group: Report of the first meeting of the Coordination Group for AI 1.13 Combination of draft CPM text coming from Working Parties 6E, 8A, 8B and 9C. The document was used as the basis for drafting and a revised draft CPM text on 1.13 was produced. 8A/224 8B/199 IARU: Draft elements for CPM text on Agenda item 1.13 regarding the amateur service Parts of the doc were used, when revising the CPM text for 1.13. More discussion is required about the proposal concerning 7 200-7 300 kHz. The document should be carried forward to the next meetings of WP 8A and WP 8B. - 8B/204 IMO: Outcome of the second meeting of a joint IMO/ITU experts group for WRC-07 preparation The doc does not contain direct text proposals. Parts of the document are included in Docs. 8A/236 / 8B/270. Indication for need of more maritime spectrum was noted. 8B/206 Telenor AS: Frequency requirements for HF mail The doc was taken into account, as appropriate, when revising the CPM text for 1.13. - 8B/209 CIRM: Use of HF spectrum by the maritime community The doc was noted, including the indication for need of more maritime spectrum. - 8B/210 CIRM: Clarification of Article 52.217 The doc was taken into account, as appropriate, when revising the CPM text for 1.13. - 8B/211 Australia: Present Uses of Appendix 17 The document was noted for information. D:\99025843.DOC 26.07.2016 - 23 8A/277(Annex 3)-E - 8B/233 USA: GMDSS Modernization and accommodation of maritime MF/HF (2-30 MHz) digital services analysis of Appendix 17 The document was taken into account, as appropriate, when revising the CPM text for 1.13. The changes proposed for Appendix 17 are not in the format of Appendix 17. Option is to develop the document into a PDNR. 8A/230 8B/251 USA: United States fixed and mobile HF requirements Relevant parts of the document are included in other USA submissions. The information in this document was noted. 8A/231 8B/257 USA: Development of CPM text for WRC-07 Agenda item 1.13 This doc was already handled by the first plenaries of WP 8A and WP 8B. 8A/233 8B/262 USA: Draft CPM text for WRC-07 Agenda item 1.13 The doc was taken into account, as appropriate, when revising the CPM text for 1.13. 8A/236 8B/270 France, UK: Proposed modification to the draft CPM text for WRC-07 Agenda item 1.13 submitted by the coordination group The doc was taken into account, as appropriate, when revising the CPM text for 1.13. 8A/238 R1 8B/272 R1 Canada: Proposal on draft CPM text for WRC-07 Agenda item 1.13 The doc was taken into account, as appropriate, when revising the CPM text for 1.13. 8A/243 8B/280 USA: Working document toward CPM text for WRC-07 Agenda item 1.13 The doc should be carried forward to the next meeting with the possibility of developing it into a draft new Report. 8A/245 - RUS: Comments on usage of frequency adaptive systems in relation to drafting the text for CPM report on WRC-07 A.I. 1.13 The doc relates to parts of the CPM Report that is in the responsibility of WP 9C. Attention of WP 9C is drawn to this in a liaison statement. D:\99025843.DOC 26.07.2016