802.11 Nov 2009 Closing Plenary Reports Date: Authors: Name

advertisement
Nov 2009
doc.: IEEE 802.11-09/1162r0
802.11 Nov 2009 Closing Plenary Reports
Date: 2009-11-20
Authors:
Name
Company
Adrian Stephens
Intel
Corporation
Submission
Address
Phone
email
+44 792 008
4900 (mobile)
adrian.p.stephens@intel.com
Slide 1
Adrian Stephens, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
• This document is a digest of the closing reports of all
802.11 sub-groups for presentation at the Nov 2009
closing plenary meeting.
Submission
Slide 2
Adrian Stephens, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Agenda for 2009-11-17
•
•
•
•
•
•
•
•
•
Roll Call / Contacts / Reflector
Go round table and get brief status report
Review action items from previous meeting
Numbering Alignment process
Amendment Ordering / ANA Status / Draft Snapshots
Lessons learned from TGw/TGn RevCom
Lessons learned from initial editing of TGn
Style Guide for 802.11 09/1034r0
Conference Calls
Submission
Slide 3
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems)
Nov 2009
Nov 2009
doc.: IEEE 802.11-09/1162r0
Draft Development Snapshot
Changes from last
report shown in red.
T
G
Published or Draft Baseline Documents
802.11
k
r
y
w
n
z
z
2007
2008
2008
2008
10.0
11.0
6.0
p
2007
2008
2008
2008
10.0
11.0
5.0
9.0
v
2007
2008
2008
2008
2009 2009
6.0
9.0
7.03
u
2007
2008
2008
2008
2009 2009
6.0
9.0
7.0
8.0
s
2007
2008
2008
2008
9.0
10.0
4.0
6.01
5.01
6.01
3.04
m
b
2007
Inc
2008
Inc
2008
Inc
2008
Inc
-
-
-
-
-
-
-
aa
2007
2008 2008 2008
9.0
10.0
4.0
6.0
6.0
7.0
3.0
Submission
p
v
u
s
mb
1.03
aa
-
0.02
Most current doc
shaded green.
Source
MEC
Style
Guide
Word
Yes
2007
Menzo
Wentink
17-July
Frame 7.2
Yes
2009
Wayne Fisher
2-Nov
Frame 7.2
No
2007
Emily Qi
18-Nov
Frame 7.2
Yes
2007
Necati
Canpolat
18-Nov
Frame 8.0
No
2007
Kazuyuki
Sakoda , protem
18-Nov
Frame 7.2
No
2009
Adrian
Stephens
12-May
Hang Lui
18-Nov
No
Editor
Slide 4
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems)
Snapshot
Date
Nov 2009
doc.: IEEE 802.11-09/1162r0
802.11 Style Guide
• See 11-09-1034-00-0000-wg11-style-guide.doc
Submission
Slide 5
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1110r2 (part) by Peter Ecclesine (Cisco Systems)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Closing Report
Date: 2009-11-20
Authors:
Name
Company
Clint Chaplin
Samsung Electronics
Submission
Address
75 W. Plumeria Drive
San Jose, Ca 95134
Phone
email
+1 408 544 5815
clint.chaplin@gmail.com
Slide 6
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
Closing report for WNG SC for November
2009, Atlanta, Georgia, USA
Submission
Slide 7
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung)
November 2009
doc.: IEEE 802.11-09/1162r0
• Three presentations at this meeting
– Continuous network discovery using Opportunistic Scanning (11-091207-01) – Marc Emmelmann
• Straw Poll: Should IEEE 802.11 WNG receive further presentations analyzing if
existing mechanisms can be used to support seamless handoff for (highly) mobile
users?
• Result: Yes - 21; No - 0; Abstain - 4.
– Time-based ranging technology for IEEE802.11 (11-09-1212-00) – Dong
Kyoo Kim
– IEEE802.11 for High Speed Mobility (11-09-1000-02) – Hiroki Nakano
• Does WNG think that we need further presentations exploring the need for support
for mobile communication.
• Result: Yes - 25; No - 0; Need More Discussion - 3; Don’t Care - 1.
• Minutes
– 11-09-1208r0
• Plans for January 2010
– 2 hour session
Submission
Slide 8
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1288r0 by Clint Chaplin, Chair (Samsung)
Nov 2009
doc.: IEEE 802.11-09/1162r0
November 2009 TGmb Closing Report
Date: 2009-11-19
Authors:
Name
Matthew Gast
Submission
Affiliations
Address
Phone
email
Trapeze Networks
5753 W. Las Positas Blvd,
Pleasanton, CA 94588 USA
+1 (925) 474-2273
msg@trapezenetworks.com
Slide 9
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
Closing report for TGmb for November 2009 plenary
meeting in Atlanta, Georgia, USA.
Submission
Slide 10
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGmb Status
Time to (re)circulate…
Photo credit: Matthew Gast; used with permission (duh)
Submission
Slide 11
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
doc.: IEEE 802.11-09/1162r0
Accomplishments
• No interpretation requests received
• Comment processing from LB149 is complete
– Asking for recirculation ballot
– 15 days is standard recirculation time, we have requested
approximately four weeks due to holiday season and incorporation
of 802.11w-2009
• Roll-up of 802.11n-2009 will commence in parallel to
letter ballot
– Recirculation anticipated in March 2010 that includes 802.11n2009
Submission
Slide 12
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
doc.: IEEE 802.11-09/1162r0
Onward to January
• No change to end date in plan of record
– Staying in working group ballot longer
• Requesting weekly teleconferences every Friday for 90
minutes at 11 am ET beginning January 29
• Goal: Recirculation letter ballot after March meeting
Submission
Slide 13
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
doc.: IEEE 802.11-09/1162r0
Revised TGmb Plan of Record
(changes from start of week underlined)
 May 2008 – Issue Call for Comment/Input
 July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals





Sept 2008 – PAR revision process started
Nov 2008 – close receipt of new input
Nov 2008 – WG/EC approval of PAR Revision
Dec 2008 – NesCom/SASB approval PAR Revision
May 2009 – First WG Letter ballot
– (includes All published Amendments as of May 2009)
 Nov 2009 – Recirc start
• May 2010 – Form Sponsor Pool (45 days)
• July 2010 – Sponsor Ballot Start
– (Include all published amendments as of July 2010)
• November 2010 – Sponsor Recirc
• March 2011 – WG/EC Final Approval
• June 2011 – RevCom/SASB Approval
Submission
Slide 14
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
doc.: IEEE 802.11-09/1162r0
References
• Agenda: 11-09/1134r10
• Minutes: 11-09/1190r0
Submission
Slide 15
Adrian Stephens, Intel Corporation
from slide 7 of 11-09/1291r0 by Matthew Gast, Trapeze Networks
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGp Closing Report
Date: 2009-09-24
Author:
Name
Lee Armstrong
Submission
Affiliations
Employer:
Armstrong
Consulting,
Inc.
Affiliation:
USDoT
Address
Phone
email
132 Fomer Road
Southampton, MA
01073
USA
+1 617 620
1701
LRA@tiac.net
Slide 16
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
TGp closing report for November meetings
Submission
Slide 17
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
doc.: IEEE 802.11-09/1162r0
November Meetings Summary
• LB158 completed since September meeting, passed, no new
comments
• Sponsor Ballot #0 started, will close on 22 November
• Current comment resolution document, 11-09-1200-02-000p,
represents the 49 comments received as of Wednesday afternoon
• 4 time slots during the week
• Majority of meeting time in discussions of key comments, not in
voting on resolutions
Submission
Slide 18
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Status
• D9.0 is the current draft
• Waiting on ballot closing this weekend
• TGp designated as P802.11p Comment Resolution
Committee (CRC)
• Weekly teleconferences planned for every Thursday @
1500 Piscataway time will be CRC meetings
• Plan is to complete comment resolution prior to
January meetings
Submission
Slide 19
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1289r0 by Lee Armstrong (Armstrong Consulting, Inc.)
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGs Atlanta Closing Report
Date: 2009-11-20
Author:
Name
Address
Affiliation
Phone
Email
Dee Denteneer
HTC 37; 5656 AE
Eindhoven; The
Netherlands
Philips
+31 40
2749743
Dee.Denteneer@phil
ips.com
Submission
Slide 20
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1243r1 by Dee Denteneer
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
TGs closing report for the November 2009 meeting.
Resolved outstanding comments and ready to go to
recirculation.
Submission
Slide 21
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1243r1 by Dee Denteneer
Nov 2009
doc.: IEEE 802.11-09/1162r0
Status
• TGs passed LB 147 with 79% approval rate (May 2009)
• Before the meeting:
• Comment resolution spreadsheet 11-09/471r18 with
118 comments open
• Most recent TGs Draft is D3.04
• After meeting
• Most recent TGs comment resolution spread sheet is
11-09/471r23, with resolutions to all comments
• An annotated agenda for TGs at this meeting in 1109/1099r9
• The TGs draft minutes will be uploaded as 11-09/1223r0
Submission
Slide 22
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1243r1 by Dee Denteneer
Nov 2009
doc.: IEEE 802.11-09/1162r0
Next Steps
• Produce Draft 4.0 and go to recirculation
• TGs is holding teleconferences on Wednesdays through the
January Plenary at 4pm (ET)for up to 1½ hours on the
Following Dates
• December 2, January 6, January 13
• Goal for the November 2009 TGs meeting in Los
Angeles, USA:
– Start resolving comments received in recirculation
Submission
Slide 23
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1243r1 by Dee Denteneer
Nov 2009
doc.: IEEE 802.11-09/1162r0
• Motion:
– Having approved comment resolutions for all of the comments
received from LB#147 on P802.11s Draft 3.0 as contained in
document 11-09/471r23,
– Instruct the editor to prepare Draft 4.0 incorporating these
resolutions and,
– Approve a Working Group Recirculation Ballot of at least 15 days
asking the question “Should P802.11s Draft 4.0 be forwarded to
Sponsor Ballot?”
• Moved by Theodorus Denteneer on behalf of TGs
• TGs vote:
– Moved: Guido Hiertz Seconded: Dan Harkins Result: y: 9-n: 0-a: 0
Submission
Slide 24
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1243r1 by Dee Denteneer
Nov 2009
doc.: IEEE 802.11-09/1162r0
Moved to schedule TGs teleconferences on
December 2 , January 6, and January 13 at 4pm for a
maximum of 90 minutes to resolve comments and
discuss agendas.
Approved by unanimous consent
Submission
Slide 25
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1243r1 by Dee Denteneer
Nov 2009
doc.: IEEE 802.11-09/1162r0
Closing Report
Date: 2009-11-20
Authors:
Name
Stephen McCann
Submission
Company
Research in Motion
(RIM) UK Ltd
Address
200 Bath Road, Slough,
Berkshire, SL1 3XE, UK
Slide 26
Phone
email
+44 1753 667099
smccann@rim.com
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1279r2 by Stephen McCann, RIM
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
Closing report for TGu Interworking with
External Networks for November 2009,
Atlanta, Georgia, USA
Submission
Slide 27
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1279r2 by Stephen McCann, RIM
November 2009
doc.: IEEE 802.11-09/1162r0
• Initial Sponsor Ballot (#0) progress
– Initial meeting of TGu CRC
– Resolved 83 technical comments this week, with 73 remaining
– 6 submissions presented and approved to resolve comments
• 11-09-1120r5
– Next sponsor re-circulation ballot in early January 2010
• Teleconferences
– Wednesdays at 11 ET (from 2nd December 2009)
• Plans for January 2010
– Review CRC sponsor ballot activities
– Continue to resolve sponsor ballot comments
Submission
Slide 28
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1279r2 by Stephen McCann, RIM
November 2009
doc.: IEEE 802.11-09/1162r0
• Expert Review
– List of 10 experts compiled (11-09-1271r0)
– Send out invitation emails to participate
– For positive responses, then send copies of IEEE 802.11u
D8.0 for review and comments to further the draft (with
time duration)
– TGu chair will then place response comments into future
re-circulation sponsor ballot.
Submission
Slide 29
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1279r2 by Stephen McCann, RIM
Nov 2009
doc.: IEEE 802.11-09/1162r0
November 2009 Closing Report
Date: 2009-11-19
Authors:
Name
Dorothy Stanley
Submission
Affiliations
Address
Phone
Aruba Networks 1322 Crossman Ave +1 630-363Sunnyvale, CA
1389
94089
email
dstanley@arubanetworks.
com
Slide 30
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
This document contains the TGv closing report for
November 2009.
Submission
Slide 31
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Goals and Accomplishments
• Comment resolution from Initial Sponsor Ballot
– 327 comments, 208 resolutions completed, 119 remain
• Teleconferences
– Dec 1, 8, 15, Jan 12, noon-2pm Eastern
Submission
Slide 32
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Output Documents
• 11-09-1290-00-000v-TGv-November-2009-closingreport.ppt
• 11-09-1130-03-000v-November-2009-agenda.ppt
• 11-09-1166-00-000v-November-2009-meeting notes
Submission
Slide 33
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGv Timeline – Updated Sept, 2009
• Initial Working Group Letter Ballot: July 07 – completed
– Jan 08 – D2.0, May 08 – D3.0, Nov 08 – D4.0
• Re-circulation Working Group Letter Ballot: November 08 (D4.0)
– Mar 09 – D5.0, May 09 – D 6.0, July 09 – D7.0, D7.0(unchanged)
• Form Sponsor Ballot Pool: August 09 (was June 09)
• Initial Sponsor Ballot: Oct 09
– Oct 09 – D7.0 (was Sept 09)
• Approved Sponsor Ballot: Nov 09
– Jan 09 – D8.0, Feb D9.0, March D10.0, April D11.0
– May 12th ( or so) for Revcom June Approval
• Final WG/EC Approval: July 2010
• RevCom/Standards Board Approval: June 4th/June 5th(or so)
• Note: TGv PAR is authorized through Dec 2010
Submission
Slide 34
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Goals for Nov 09 - Jan 2010
• Complete initial Sponsor Ballot comment resolution
• Recirculation Sponsor Ballot
Submission
Slide 35
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
doc.: IEEE 802.11-09/1162r0
References
Submission
Slide 36
Adrian Stephens, Intel Corporation
from slide 7 of 11-09/1290r0 by Dorothy Stanley (Aruba Networks)
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGz Atlanta Closing Report
Date: 20 November 2009
Authors:
Name
Menzo Wentink
Submission
Company
Address
Phone
email
Qualcomm
Straatweg 66,
Breukelen, the
Netherlands
+31-65-1836231
mwentink@qualcomm
.com
Slide 37
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1292r0 by Menzo Wentink (Qualcomm)
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGz Accomplishments in November
• TGz made significant progress in reaching consensus
on comments received on the initial sponsor ballot
– The comments are in 11-09/1185r0
– Text submissions are in 11-09/1218r4 (TDLS discovery), 1109/1281r0 (TDLS path switch) and 11-09/1230r3 (Off-channel
selection)
• We expect to start a first recirculation sponsor ballot
after the Los Angeles meeting in January
Submission
Slide 38
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1292r0 by Menzo Wentink (Qualcomm)
Nov 2009
doc.: IEEE 802.11-09/1162r0
802.11aa – Robust Audio Video Transport Streaming
Atlanta Closing Report
Date: 2009-11-18
Authors:
Name
Affiliation
Address
Phone
email
Ganesh
Venkatesan
Alex Ashley
Intel
Corporation
NDS Ltd
JF3-336 2111NE
25th Ave
One London Road,
Staines, Middlesex,
TW18 4EX,
England
+1 503 334
6720
+44 1784
848770
Ganesh.Venkatesan
@intel.com
aashley@nds.com
Submission
Slide 39
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
TGaa Closing Report for the IEEE 802.11 Atlanta,
Georgia Session (November 2009)
Submission
Slide 40
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Goals for the session
•
•
•
•
Submission
Continue listening to technical proposals and adopting
corresponding text into the TGaa draft
Joint meeting with 802.11ac on approaches to OBSS
Joint meeting with 802.1AVB
Resolve comments from Internal review of Draft D0.01/D0.02
Slide 41
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Technical Presentations
Document
number
Title
1150/r1
Feedback-jamming Multicast ARQ results
with capture effect
Jochen Miroll
1139/r3
OBSS Management Text
Graham Smith
1138/r2
Outline of Proposed OBSS Solution
Graham Smith
1137/r1
EDCA Bandwidth Factor
Graham Smith
1136/r1
AP Shut Out Neighborhood Effect
Graham Smith
0926/r5
Interworking with 802.1Qat
Ganesh Venkatesan
1215/r0
Non-contentious (internal review)
comments assigned to BrianH
Brian Hart
1251/r0
Intra-AC Prioritization Use Cases
Alex Ashley
1157/r1
Explain OBSS issue as well as possible
simulation scenarios for OBSS in TGac
Takatori Yasushi
Submission
Author(s)
Slide 42
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Accomplishments
1. Listened to 9 technical presentations
2. Adopted resolutions to some internal review
comments into TGaa draft (1215r0)
3. Listened to the complete OBSS solution and
adopted the corresponding (updated) text
(1139r3)
4. Brainstormed on intra-AC prioritization Use
Cases
5. Met jointly with 802.1AVB
6. Approved 09/926r5 as the guiding document
describing the work that needs to be done in
802.11aa and 802.1Qat
Submission
Slide 43
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Joint meeting with 802.1AVB
1. Presented a solution to support 802.1Qat in 802.11 (09/926r5)
2. Presented a draft version of changes to 802.11 in order to support
802.1Qat in 802.11.
3. Status Update on 802.11aa
4. Status Update on 802.1AVB
1.
2.
3.
802.1AS may have up to 2 recirculations before starting sponsor ballot
802.1Qat has planned a recirculation before starting sponsor ballot
802.1Qav is ratified
5. Goals for the March 2010 joint meeting
1.
Submission
Complete changes to 802.11 in order to support 802.1Qat and have the changes
included in a 11aa draft
Slide 44
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Goals for the January Interim
Enter January 2010 session with TGaa Draft 0.03
Adopt text corresponding to all remaining PAR topics into
TGaa Draft in the January meeting
Work towards completing Draft 1.0 by March 2010
Submission
Slide 45
Adrian Stephens, Intel Corporation
from slide 7 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Teleconferences
Mondays 11:00-12:30 Hrs ET on the
following days:
Nov 30, 2009
Dec 14, 2009
Jan 11, 2010
Submission
Slide 46
Adrian Stephens, Intel Corporation
from slide 8 of 11-09/1269r0 by Ganesh Venkatesan, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGac November 2009 Closing Report
Date: 2009-11-19
Authors:
Name
Affiliations
Osama Aboul-Magd
Samsung Electronics
Submission
Address
Phone
email
613-599-5078
Osama53@rogers.com
Slide 47
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
This document is the closing report for the TGac for the
November 2009 session.
Submission
Slide 48
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Work Completed
• Selection of ad hoc group chairs is completed
–
–
–
–
PHY (Vinko Erceg, Minho Cheong, Raja Banerjea)
MAC (Matthew Fischer, Allan Zhu, Jae Seung Lee)
MU-MIMO (Brian Hart, Robert Stacey, Sameer Vermani)
Coexistence (Youhan Kim, Eldad Perahia, Yasushi Takatori)
• Ad Hoc groups conducted their first meetings with focus on
procedure discussion. Ad Hoc group reports are included in:
–
–
–
–
PHY  09/1261r0
MAC  09/1260r1
MU-MIMO  09/1262r0
Coexistence  09/1265r2
• The TG accepted a new revision of the Functional Requirements
and Evaluation Methodology document (09/0451r8).
• The TG agreed on an initial guideline for Ad Hoc scope
(09/1175r1).
• Technical Presentations.
Submission
Slide 49
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
doc.: IEEE 802.11-09/1162r0
January 2010 Goals
• Plan to continue with Ad Hoc group meetings with focus to further
define the scope and work items for each ad hoc.
• Submissions
Submission
Slide 50
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
doc.: IEEE 802.11-09/1162r0
Conference Call Times
• December 3, 2009
– PHY Ad Hoc  21:00 -22:00 ET
• December 17, 2009
– MAC Ad Hoc  20:00 – 21:00 ET
– MIMO-MU Ad Hoc  11:00 –12:00 ET
• January 7, 2010
– Coexistence Ad Hoc  20:00 – 22:00 ET
• January 14, 2010
– PHY Ad Hoc  11:00 -12:00 ET
Submission
Slide 51
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1277r1 by Osama Aboul-Magd (Samsung)
Nov 2009
doc.: IEEE 802.11-09/1162r0
TGad November 2009 Closing Report
Date: 2009-11-19
Authors:
Name
Eldad Perahia
Submission
Company
Address
Phone
email
Intel
Corporation
2111 NE 25th Ave
Hillsboro, OR 97124
503-712-8081
eldad.perahia@intel.com
Slide 52
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
This document is the closing report for the TGad for the
November 2009 session.
Submission
Slide 53
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Work Completed (1/2)
• Evaluation Methodology
–
–
–
–
–
09/1160, Proposed Evaluation Methodology Additions, John Barr
09/1216, Internet traffic modeling, Sai Nandagopalan
09/1213, 60GHz Impairments Modeling, Vinko Erceg
09/1222r1, Hard disk drive traffic model, Eldad Perahia
09/1229, Application of 60 GHz Channel Models for Comparison
of TGad Proposals, Alexander Maltsev
– 09/296r12, Update to Evaluation Methodology document, Eldad
Perahia
– 09/1210, Coexistence Techniques, Tuncer Baykas
• Motion to adopt 09/0296r12 as the first draft of the TGad
evaluation methodology failed 24/20/7
Submission
Slide 54
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Work Completed (2/2)
• Channel Modeling, Tues PM2, Wed PM2, Th AM2
– 09/1252, Inter Cluster Parameters of Living Room Channel Model for 60
GHz WLAN Systems, Alexander Maltsev
– 09/1152, 60-GHz Living-Room Channel Measurements, Tian-Wei Huang
– 09/1169, Human Body Blockage - Guidelines for TGad MAC
development, Thomas Kürner
– 09/1170, Modeling the human induced 60 GHz channel dynamics,
Thomas Kürner
– 09/1165, 60 GHz Cubicle Wall Reflectivity, Chris Hansen
– 09/1232, Intra-cluster response model and parameter for channel modeling
at 60GHz (Part2), Hirokazu Sawada
• Other technical submissions
– 09/1153, 60GHz Beamforming, Carlos Cordeiro
– 09/1168, SCR Design and Performance Assessment, John Stine
• Call for Proposals
– Motion to adopt 09/1206r0 as the TGad call for proposals passed 50/0/19
– Chair to announce in WG and email reflector
Submission
Slide 55
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Call for Proposals
•
•
https://mentor.ieee.org/802.11/dcn/09/11-09-1206-00-00ad-draft-call-forproposals.doc
Two types of proposals
– New Techniques
– Complete Proposals
•
•
Definition in https://mentor.ieee.org/802.11/dcn/09/11-09-0935-03-00adselection-procedure.doc
Notification of intent to present: December 18, 2009
– Must email both TG chair and WG chair
– Date applies to proposers of both New Techniques and Complete Proposals
•
For New Techniques presented in March 2010
– Date that material must be on mentor: February 28, 2010
•
For New Techniques presented in May 2010
– Date that material must be on mentor: May 2, 2010
•
For Complete Proposals presented in May 2010
– Date that material must be on mentor: May 2, 2010
Submission
Slide 56
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Goals for January 2010
• Continue working on task group documents
• Technical contributions
Submission
Slide 57
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
Conference call times
• Dec 10
– 10:00-12:00 ET
– Evaluation Methodology
• Jan 7
– 10:00-12:00 ET
– Channel Model
Submission
Slide 58
Adrian Stephens, Intel Corporation
from slide 7 of 11-09/1117r0 by Eldad Perahia, Intel Corporation
Nov 2009
doc.: IEEE 802.11-09/1162r0
IEEE 802.11
TV White Spaces Study Group
Closing Report
Date: 2009-11-20
Authors:
Name
Rich Kennedy
Submission
Affiliations
Address
Phone
email
Research In
Motion
7305 Napier Trail
Austin, TX 78729
+1-972-207-3554
rikennedy@rim.com
Slide 59
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
This presentation is the closing report for the Atlanta
meeting of the IEEE 802.11 TVWS SG.
Submission
Slide 60
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Agenda
• Introduction
• Administrative items including
• Review and respond to the received comments on the 802.11 TVWS
PAR and 5C
– 11-09-0934-05-tvws-par-nescom-form-plus-5c
• Plan for the IEEE 802 Wireless Interim in Los Angeles [January 18th
through 22nd]
• Request teleconferences
Submission
Slide 61
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Accomplishments
• Reviewed all of the received comments on the 802.11
TVWS PAR and 5C
– Responses in 11-09-1240-04-tvws-replies-to-comments-on-80211-tvws-par-5c
• Edited the PAR and 5C document and uploaded it
– 11-09-0934-08-tvws-par-nescom-form-plus-5c
• Selected one teleconference slot to request
– 20:00 ET on January 12th
• Discussed the plan for now until the January interim
Submission
Slide 62
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Documents
• 11-09-1240-04-tvws-replies-to-comments-on-802-11-tvws-par-5c
• 11-09-0934-08-tvws-par-nescom-form-plus-5c
Submission
Slide 63
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Thanks to all who participated!
See you in LA
Submission
Slide 64
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1286r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
QoSMAN SG Closing Report – Nov 2009
Date: 2009-11-19
Authors:
Name
Affiliations
Address
Phone
email
Michael Montemurro
Research in Motion
4701 Tahoe Blvd.
Mississauga, ON. Canada.
L4W 0B4
+1-905-629-4746
mmontemurro@rim.com
Submission
Slide 65
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
This document is the closing report for the QoSMAN SG
for the November 2009 session.
Submission
Slide 66
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Work Completed
• Thanks to Stephen McCann as acting Secretary for the group.
– Minutes: https://mentor.ieee.org/802.11/dcn/09/11-09-1209-00-00qm-minutesnovember-2009.doc
• Discussion on the process moving forward as a Task Group
• Processed PAR and 5C comments:
– https://mentor.ieee.org/802.11/dcn/09/11-09-1241-03-00qm-qosman-par-commentresolutions.xls
• Completed and accepted the PAR and 5C document
– https://mentor.ieee.org/802.11/dcn/09/11-09-0942-08-00qm-qosman-par-nescomform-plus-5cs.doc
• A Teleconference has been planned for January 14 at 11:00h ET.
• Motions to approve PAR comment resolutions and PAR and 5C
document.
Submission
Slide 67
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Motion to approve QOSMAN PAR
comment resolutions
Move to accept the QOSMAN PAR comment resolutions
in document https://mentor.ieee.org/802.11/dcn/09/1109-1241-02-00qm-qosman-par-commentresolutions.xls.
• Moved: Stephen McCann
• Seconded: Paul Lambert
• Vote: Yes – 6, No – 0, Abstain – 1.
• Motion Passes.
Submission
Slide 68
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
SG Motion
Believing that the QoSMAN PAR and Five Criteria
contained in the documents referenced below meet
IEEE-SA guidelines,
Request that the QoSMAN PAR and the Five Criteria
contained in document 11-09-0942-07-00qm-qosmanpar-nescom-form-plus-5cs.doc be forwarded to the
802.11 WG for approval of the full Working Group.
• Moved: Paul Lambert
• Seconded: Stephen McCann
• Vote: Yes – 6, No – 0, Abstain – 0.
Submission
Slide 69
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
802.11 WG Motion
Believing that the QoSMAN PAR and Five Criteria contained in the
documents referenced below meet IEEE-SA guidelines,
Request that the QoSMAN PAR and the Five Criteria contained in
11-09-0942-07-00qm-qosman-par-nescom-form-plus-5cs.doc be
posted to the IEEE 802 Executive Committee (EC) agenda for WG
802 preview and EC approval to submit to NesCom.
• Moved by Michael Montemurro on behalf of the IEEE 802.11
QOSMAN SG
QOSMAN SG vote:
Moved: Paul Lambert, Seconded: Stephen McCann, Result: 6-0-0
Submission
Slide 70
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Task Group Process Strawman
• Prepare a Requirements Document
– Consider use cases to justify requirements
– Use previous submissions as a basis
– Prioritize the requirements (mandatory/optional)
• Solicit individual proposals
• First Draft
Submission
Slide 71
Adrian Stephens, Intel Corporation
from slide 7 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
January 2009 Goals
•
•
•
•
Begin work as a Task Group
Elect Task Group Officers: Chair, Editor, and Secretary
Establish a timeline.
Create a requirements and use cases document for management
frame prioritization.
Submission
Slide 72
Adrian Stephens, Intel Corporation
from slide 8 of 11-09/1211r1 by Michael Montemurro, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Closing Report
Date: 2009-11-20
Authors:
Name
Andrew Myles
Submission
Company
Address
Phone
Cisco
email
andrew.myles@cisco.con
Slide 73
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
Closing report for JTC1 ad hoc for
November 2009, Atlanta, Georgia, USA
Submission
Slide 74
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
doc.: IEEE 802.11-09/1162r0
JTC1 ad hoc discussed the WAPI NP
proposal & wrote two liaisons to SC6
• Progress in Atlanta
– Discussed China NB’s proposal for a WAPI NP in ISO/IEC
– Wrote letter (11-09-1254r1) to SC6 responding to claims that 802.11 isn
insecure in the WAPI NP proposal
– Wrote letter to SC6:
• Reporting recent and planned future activities in the IEEE 802.11 Working
Group
• Flagging an intention to submit certain documents to ISO/IEC using the PDSO
process
• Offering JTC1 and SC6 National Bodies the opportunity to submit comments
into the Sponsor Ballot process
• Plans for Jan 2010
– Consider any JTC1 liaison issues
– Start technical evaluation of WAPI
Submission
Slide 75
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
doc.: IEEE 802.11-09/1162r0
JTC1 ad hoc approved a liaison to SC6
relating to ISO/IEC JTC 1/SC6 N 14123
• Motion
– The IEEE 802.11 JTC1 ad hoc recommends to the IEEE 802.11 WG and
IEEE 802 ExCom that the letter contained in 11-09-1254r1 be liaised to
ISO/IEC JTC1/SC6. This letter provides a response to some of the
material liaised to the IEEE staff in ISO/IEC JTC 1/SC6 N 14123. The
letter should be sent to the SC6 Secretariat. It should also be CC’ed to the
individuals and organisations addressed by the e-mail that notified IEEE
staff about ISO/IEC JTC 1/SC6 N 14123. IEEE staff should be authorised
to make any necessary editorial changes
• Moved: David Hunter
• Seconded: Jerry Thrasher
• Result 11/0/0
Submission
Slide 76
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
doc.: IEEE 802.11-09/1162r0
802.11 WG will consider a liaison to SC6
relating to ISO/IEC JTC 1/SC6 N 14123
• Motion
– The IEEE 802.11 JTC1 ad hoc and IEEE 802.11 WG recommends to the
IEEE 802 ExCom that the letter contained in 11-09-1254r1 be liaised to
ISO/IEC JTC1/SC6. This letter provides a response to some of the
material liaised to the IEEE staff in ISO/IEC JTC 1/SC6 N 14123. The
letter should be sent to the SC6 Secretariat. It should also be CC’ed to the
individuals and organisations addressed by the e-mail that notified IEEE
staff about ISO/IEC JTC 1/SC6 N 14123. IEEE staff should be authorised
to make any necessary editorial changes
• Moved:
• Seconded:
• Result:
Submission
Slide 77
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
doc.: IEEE 802.11-09/1162r0
JTC1 ad hoc approved a liaison to SC6
relating to plans to use the PSDO
• Motion
– The IEEE 802.11 JTC1 ad hoc recommends to the IEEE 802.11 WG and
IEEE 802 ExCom that the letter contained in 11-09-1273r1 be liaised to
ISO/IEC JTC1/SC6. This letter documents recent and planned future
activities in the IEEE 802.11 Working Group, flags an intention to submit
certain documents to ISO/IEC using the PDSO process, and offers JTC1
and SC6 National Bodies the opportunity to submit comments into the
Sponsor Ballot process. The letter should be sent to the SC6 Secretariat.
The IEEE 802.11 Working Group Chair should be authorised to make any
necessary editorial changes.
• Moved: Dan Harkins
• Seconded: Jim Raab
• Result 12/0/0
Submission
Slide 78
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
doc.: IEEE 802.11-09/1162r0
802.11 WG will consider a liaison to SC6
relating to plans to use the PSDO
• Motion
– The IEEE 802.11 JTC1 ad hoc and IEEE 802.11 WG recommends to IEEE
802 ExCom that the letter contained in 11-09-1273r1 be liaised to
ISO/IEC JTC1/SC6. This letter documents recent and planned future
activities in the IEEE 802.11 Working Group, flags an intention to submit
certain documents to ISO/IEC using the PDSO process, and offers JTC1
and SC6 National Bodies the opportunity to submit comments into the
Sponsor Ballot process. The letter should be sent to the SC6 Secretariat.
The IEEE 802.11 Working Group Chair should be authorised to make any
necessary editorial changes.
• Moved:
• Seconded:
• Result:
Submission
Slide 79
Adrian Stephens, Intel Corporation
from slide 7 of 11-09/1284r0 by Andrew Myles, Cisco
Nov 2009
doc.: IEEE 802.11-09/1162r0
IEEE 802.11
Regulatory Ad Hoc Committee
Closing Report
Date: 2009-11-20
Authors:
Name
Rich Kennedy
Submission
Affiliations
Address
Phone
email
Research In
Motion
7305 Napier Trail
Austin, TX 78729
+1-972-207-3554
rikennedy@rim.com
Slide 80
Adrian Stephens, Intel Corporation
from slide 1 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Abstract
This presentation is the closing report for the Atlanta
meeting of the IEEE 802.11 Regulatory Ad Hoc
Committee.
Submission
Slide 81
Adrian Stephens, Intel Corporation
from slide 2 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Agenda
• Introduction
• The regulatory summaries
– North America
– European Union
– Asia
• FOCUS:
– Input to ERM TG11 on EN 300 328 v1.8.1
– FCC changes in the 5GHz band
Submission
Slide 82
Adrian Stephens, Intel Corporation
from slide 3 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Accomplishments
• Provided updates on relevant regulatory actions
• Discussed the status of the revision of ERM TG11
– Called for more participation to prevent unwanted regulations
• Discussed the impact of new 5 GHz certification rules
– FCC KDB 443999
– “devices will not permit operations on channels which overlap the 5600 - 5650
MHz band”
– Operation in 5250 – 5350 MHz and 5470 – 5725 MHz bands is restricted to indoor
– With these stipulations, certification can begin again
• Discussed the just released (17 November) Ofcom consultation on
“Geolocation for Cognitive Access”
– Responses due 9 February 2010
– Will plan response on conference calls
Submission
Slide 83
Adrian Stephens, Intel Corporation
from slide 4 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Documents
• 11-09-1141-01-0reg-atlanta-meeting-plan-and-agenda-nov-2009
• http://fjallfoss.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?
switch=P&id=41732
• http://www.ofcom.org.uk/consult/condocs/cogaccess/cogaccess.pdf
Submission
Slide 84
Adrian Stephens, Intel Corporation
from slide 5 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Nov 2009
doc.: IEEE 802.11-09/1162r0
Thanks to all who participated!
See you in Atlanta
Submission
Slide 85
Adrian Stephens, Intel Corporation
from slide 6 of 11-09/1287r0 by Rich Kennedy, Research In Motion
Download