University of Kentucky Hazard Mitigation Plan Update Steering Committee Meeting 3 February 27, 2015 Chief Joe Monroe UK Police Department Captain Tom Matlock UK Crisis Management and Preparedness Laurel Wood Business Continuity Coordinator R. Josh Human Director Andrea S. Pompei Lacy Project Manager Agenda 1. Vulnerability to Hazards 2. Updating the Five Year Action Plan 3. FEMA Funding Opportunities Plan Development Timeline 1. 2. 3. 4. Risk Assessment Mitigation Strategy Plan Review & Evaluation Plan Adoption Fall 2014 Spring 2015 Agency and Public Involvement Steering Committee Meetings Kick-off meeting Introducing hazard vulnerability Developing a mitigation strategy Draft plan review Individual Stakeholder Meetings Data collection Mitigation Strategy Plan Maintenance Public Information: Web Page http://www.uky.edu/EM/hazardmitigationplan.html RISK ASSESSMENT Risk Assessment Requirement: • What damage could occur? • What is the history of hazards at UK? • Where are our assets? • Where are our vulnerabilities? Hazards Identified for the 2015 HMP Severe Storm Tornado Winter Storm Hailstorm Flood Extreme Heat Drought Karst/Sinkhole Earthquake Wildfire Mine Subsidence Landslide Dam Failure Risk Assessment Includes 3 parts/sections….. Identify Hazards Hazards that could affect UK Profile Hazards Historic events that affected UK Assess Vulnerability Identified areas based on exposure (assets) and risk. What data is used to determine Vulnerability? Vulnerability Score = Exposure Score + Hazard Score Exposure: Critical facilities Building Replacement Values Building Content Value Building Condition Hazardous Materials Animal Counts Population Hazard: Hazard occurrences Insurance Data Staff Identified Hazard losses Insurance Data Staff Identified Geographic extent State Plan Grid Data Exposure Score Is the sum of the following 7 weighted variables…. 1. Population Score (30%) Data derived from 3 sources. System wide identified population (49,129), Staff (23,330 97% located 22,598), Students (18,011) and Housing (8,527) 2. Building Value Score (20%) Insurance replacement costs from EBARS and if no entry in EBARS we used State insurance database from UK Risk Management 3. Building Content Score (20%) Insurance content value (EBARS) 4. Critical Facilities Rank (10%) Stakeholders identified 24 facilities Exposure Score Is the sum of the following 7 weighted variables…. 5. Building Condition Score (10%) Data derived from EBARS, if no EBARS entry assumed bad condition 6. HAZ/MAT Score (5%) Data derived from Occupational Health & Safety CHEMATICS (Chemicals), Environmental Health & Safety (Fuel) and Physical Plant (Fuel) 7. Animal Score (5%) Division of Animal Laboratory Services Data Sources for Hazard Scores Hazard Type Data Source Dam/Levee Failure State Hazard Mitigation Plan “Hazard Score” grids (KDOW Dam Points and Inundation) Drought State Hazard Mitigation Plan “Hazard Score” grids (U.S. Palmer Drought Severity Index data) Earthquake State Hazard Mitigation Plan “Hazard Score” grids (PGA and Soil Types) Extreme Temperature State Hazard Mitigation Plan “Hazard Score” grids (Sheldus County level loss and occurrence data) Flood 33% Flood Count (Stakeholder), 33% Flood Damages (Stakeholder), 33% State Hazard Mitigation Plan “Hazard Score” grids (DFIRM Area and SRL/RL Properties) Hailstorm 50% Hail Count and 50% State Hazard Mitigation Plan “Hazard Score” grids (NWS/NOAA radar 25 mile radius calculation) Data Sources for Hazard Scores Hazard Type Data Source Karst/Sinkhole 33% Sinkhole Count (Stakeholder), 33% Sinkhole Damages (Stakeholder), 33% Karst “Hazard Score” grid from SHMP (Data from KGS Karst and Sinkhole layers) Severe Storm 33% Sinkhole Count (Stakeholder), 33% Sinkhole Damages (Stakeholder), 33% Karst “Hazard Score” grid from SHMP Tornado State Hazard Mitigation Plan “Hazard Score” grids (NWS/NOAA radar 25 mile radius calculation) Severe Winter Storm 33% Winter Storm Count, 33% Winter Storm Damages, and State Hazard Mitigation Plan “Hazard Score” grids (Sheldus County level loss and occurrence data) Data Sources for Hazard Scores Hazard Type Mine Subsidence Data Source Wildfire State Hazard Mitigation Plan “Hazard Score” grids (USGS NLCD Land Cover and KDF fire points) Landslide 33% Count (Stakeholder), 33% Damages (Stakeholder), 33% Landslide “Hazard Score” grid from SHMP (USGS and KGS layers) State Hazard Mitigation Plan “Hazard Score” grids (AML) Calculating the Scores Step 1: Each building received an rank from 0 - 1 1 = highest value 0 = lowest value Composite Exposure Score: All of the data was classified into 4 categories using the Natural Breaks classification choice (which breaks data into like classes) Severe High Moderate Low Mapping Your University’s Hazard Vulnerability Identifying vulnerable properties Target project areas Use assessment results to drive other planning initiatives. MITIGATION STRATEGY Mitigation Strategy What are our mitigation goals and actions? How will the Plan be integrated into planning mechanisms? Mitigation Strategy Guides the selection of activities to mitigate and reduce potential losses based on the risk assessment. Our Strategy contains: 1. Goals 2. Action Items Components of a Mitigation Strategy Goals: What long-term outcomes do you want to achieve? Action Items: What specific actions will the university take to reduce risk to hazards? Action Plan: How will the actions be prioritized and implemented? Mitigation Goals 1. Protect lives 2. Protect Property 3. Policies and Practices 4. External Partnerships 5. Education and Outreach GOAL 1 Protect lives and reduce injuries from hazards and threats. GOAL 1: Protect Lives • Construct Retention and • Construct safe rooms channel modification • Evacuation Support Kits projects • Connecting 4-H Camps to city sewer GOAL 2 Protect university property, organizational information, and research from hazards and threats. GOAL 2: Property Protection • Install lightning protection • UK/Nicholasville Road Flood Mitigation Project • Connect 4-H camps to sewer lines • Alumni Drive Culvert Replacement • Assess structural conditions of buildings GOAL 2: Property Protection GOAL 3 Enhance existing, or develop new University policies and practices that are designed to reduce damaging effects from hazards and threats. GOAL 3: Policies and Practices • Complete development of • Create and enforce building emergency action university design and plans construction standards • Develop BMP’s for stormwater management GOAL 4 Build stronger partnerships between government, educational institutions, business, and the community. GOAL 4: Partnerships • Assign member of UK • Encourage incorporation of committee to other hazard educational materials into workgroups school education programs GOAL 5 Build disaster preparedness through mitigation education and outreach. GOAL 5: Education and Outreach • Develop a campus CERT program • Identify and procure addition warning communication systems • Build more awareness of UK Alert • Create training and informational videos Next Steps: Update Mitigation Strategy Final Steering Committee Meeting March