REQUEST FOR EXPRESSIONS OF INTEREST AND STATEMENTS OF QUALIFICATIONS Title: Resurfacing of Bear Creek Park Running Track Reference No.: 1220-050-2011-011 FOR MINOR WORKS PROJECTS RDO 2011 07 08 RFEOI/SOQ #1220-050-2011-011 Page 1 of 22 REQUEST FOR EXPRESSIONS OF INTEREST AND STATEMENTS OF QUALIFICATIONS PRE-QUALIFICATION OF GENERAL CONTRACTORS TABLE OF CONTENTS 1. INTRODUCTION................................................................................................................03 1.1 Purpose ...................................................................................................................03 1.2 Definitions ................................................................................................................03 1.3 Description of Construction Contracts ......................................................................04 2. INSTRUCTIONS TO RESPONDENTS ..............................................................................04 2.1 Closing Time and Address for Submission Delivery .................................................04 2.2 Information Meeting .................................................................................................04 2.3 Receipt of Submissions ...........................................................................................04 2.4 Number of Copies ....................................................................................................05 2.5 Late Submissions ....................................................................................................05 2.6 Amendments to Submissions ..................................................................................05 2.7 Inquiries ...................................................................................................................05 2.8 Addenda ..................................................................................................................05 2.9 Opening of Submissions ..........................................................................................06 2.10 Status Inquiries ........................................................................................................06 3. SUBMISSION FORM AND CONTENT ..............................................................................06 3.1 Package ..................................................................................................................06 3.2 Form of Statement of Qualifications .........................................................................06 3.3 Signature .................................................................................................................07 4. EVALUATION AND SELECTION ......................................................................................07 4.1 Evaluation Team ......................................................................................................07 4.2 Evaluation Criteria ...................................................................................................07 4.3 Litigation ..................................................................................................................08 4.4 Additional Information ..............................................................................................08 4.5 Interviews ................................................................................................................08 5. GENERAL CONDITIONS ..................................................................................................09 5.1 No Obligation ...........................................................................................................09 5.2 Respondent’s Expenses ..........................................................................................09 5.3 No Claims ................................................................................................................09 5.4 Conflict of Interest ....................................................................................................09 5.5 Solicitation of Council Members and City Staff .........................................................09 5.6 Confidentiality ..........................................................................................................09 SCHEDULE A SCHEDULE B SCOPE OF SERVICES SAMPLE FORM OF SUBMISSION Appendix A Appendix B Appendix C Principal Projects Completed in the Past Five Years Similar or Related Projects Completed Major Projects Underway as of the Date of Submission RFEOI/SOQ #1220-050-2011-011 Page 2 of 22 REQUEST FOR EXPRESSIONS OF INTEREST AND STATEMENTS OF QUALIFICATIONS 1. INTRODUCTION 1.1 Purpose The purpose of this Request For Expressions of Interest and Statements of Qualifications (the “RFEOI/SOQ”) is to: (a) invite submissions from respondents that describe the desire, expertise and capability of the respondent to participate in the Project described in Schedule A; and (b) select a respondent or respondent(s) who may be invited to participate in an Invitation to Tender (the “ITT”) process. This RFEOI/SOQ is a general call intended to capture the maximum number of eligible contractors together with company specific information about the contractor responding to the call. All information shall be reviewed by the City’s project manager, design team and the City. It shall be at the discretion of the City to accept or reject responses from any contractor who elects to submit a prequalification submission. The City reserves the right to not accept any submission and to reissue this prequalification at the sole discretion of the City. The City does not obligate itself in any way as a result of this RFEOI/SOQ. Only the execution of a written contract agreement following a formal tendering process will obligate the City in accordance with the terms and conditions of any agreement. It is anticipated that only pre-qualified general contractors will be permitted to submit tenders for the Resurfacing of Bear Creek Park Running Track. However, the City also reserves the right to permit any contractor to provide a tender and award any work described in this document through other means. Solicitation packages are anticipated to be issued in July 2011. To ensure adequate competition, the City reserves the right to reissue this prequalification to additional contractors as needed. 1.2 Definitions In this RFEOI/SOQ the following definitions shall apply: “City” means the City of Surrey; “City Representative” has the meaning set out in section 2.7 hereof; “City Website” means www.surrey.ca; “Closing Time” has the meaning set out in section 2.1; “Evaluation Team” means the team appointed by the City; “Information Meeting” has the meaning set out in section 2.2; “Preferred Respondent(s)” means the Respondent(s) selected by the Evaluation Team; “Respondent” means an entity that submits a Submission; RFEOI/SOQ #1220-050-2011-011 Page 3 of 22 “Submission” means a submission submitted in response to this RFEOI/SOQ; “RFEOI/SOQ” means Request for Expressions of Interest and Statements of Qualifications; and, “Services” has the meaning set out in Schedule A. 1.3 Description of Construction Contracts Once pre-qualified, successful Respondents shall be invited to submit tenders through the City’s ITT process. (a) The tenders will be issued for a minimum two weeks. (b) The requirement for a 10% bid bond is anticipated. (c) The schedules for the construction and scope of work are provided in Schedule A. (d) The form of the contract for the project will be the Master Municipal Construction Documents (MMCD – January 1996 (Rev. April 2000) Agreement (Gold Edition), modified by the City’s supplemental general conditions, supplementary specifications and supplementary standard drawings (as applicable) and other requirements of the City. (e) The general contractors will have full control and responsibility for the construction site during the construction periods for all the work. 2. INSTRUCTIONS TO RESPONDENTS 2.1 Closing Time and Address for Submission Delivery Submissions must be received at the office of: Acting Purchasing & AP Manager Address: City of Surrey – Purchasing Section 6645 – 148 Street Surrey, B.C. V3S 3C7 Fax: 604-599-0956 E-mail for PDF Files: purchasing@surrey.ca on or before the following date (the “Closing Time”): 2.2 Time: 3:00 p.m., local time Date: July 22, 2011 Information Meeting At the time of issuance of this RFEOI/SOQ a meeting has not been scheduled. 2.3 Receipt of Submissions The City expressly reserves the right to waive formalities or to reject any or all Submissions or to accept a Submission either in whole, or in part, which is deemed most favourable to the interests of the City. If a Submission contains a defect or fails in some way to comply with the requirements, which in the sole discretion of the City is not material, the City may waive the defect and accept the Submission. RFEOI/SOQ #1220-050-2011-011 Page 4 of 22 Any response to this RFEIO/SOQ may become part of any contract into which the City enters with the successful Respondent. The City is under no obligation to award a contract as a result of this RFEOI/SOQ and reserves the right to terminate the RFEOI/SOQ process at any time. 2.4 Number of Copies Faxed or emailed PDF Submissions are permitted, but a Respondent bears all risk that the City’s equipment functions properly so that the City receives the Submission on time. If the Respondent prefers to submit a hard copy, the Respondent should submit the original unbound Submission and 1 hard copy (2 in total) 2.5 Late Submissions Submissions received after the Closing Time will not be considered or accepted. 2.6 Amendments to Submissions Submissions may be revised by written amendment, delivered to the location set out above, at any time before the Closing Date but not after. An amendment must be signed by an authorized signatory of the Respondent in the same manner as provided in section 3.3. Fax amendments are permitted, but such fax may show only the change to the Submission section(s). A Respondent bears all risk that the City’s fax equipment functions properly so as to facilitate timely delivery of any fax amendment. 2.7 Inquiries All inquiries related to this RFEOI/SOQ are to be directed in writing to the person named below (the "City Representative"). Information obtained from any person or source other than the City Representative may not be relied upon. Name: Address: Kam Grewal, Acting Purchasing & AP Manager 6645 – 148 Street, Surrey, B.C. V3S 3C7 Fax: Email: 604-599-0956 purchasing@surrey.ca The City will attempt to respond to all reasonable inquiries but reserves the right not to respond to inquiries. Respondents finding discrepancies or omissions in the RFEOI/SOQ documentation or having doubts as to the meaning or intent of any provision should immediately notify the City Representative. If the City determines that an amendment is required to this RFEOI/SOQ, the City Representative will issue an addendum in accordance with section 2.8. No oral conversation will affect or modify the terms of this RFEOI/SOQ nor be relied upon by any Respondent. 2.8 Addenda If the City determines that an amendment is required to this RFEOI/SOQ, the City Representative will post a written addendum on the City Website that will form part of this RFEOI/SOQ. No amendment of any kind to the RFEOI/SOQ is effective unless it is posted in a formal written addendum on the City Website. Upon submitting a RFEOI/SOQ #1220-050-2011-011 Page 5 of 22 Submission, Respondents will be deemed to have received notice of all addenda that are posted on the City Website. 2.9 Opening of Submissions The City intends to open Submissions in private but reserves the right to open Submissions in public at its sole discretion 2.10 Status Inquiries All inquiries related to the status of this RFEOI/SOQ, including whether or not a Respondent has been selected, should be directed to the City Website and not to the City Representative. 3. SUBMISSION FORM AND CONTENT 3.1 Package Submissions to be in a sealed package, marked on the outside with the Respondent’s name, title of the project and reference number. 3.2 Form of Statements of Qualifications Interested parties are required to submit the following information which will be used in the evaluation of prequalification of Respondents. (a) A completed Expressions of Interest and Statements of Qualification statement in the form attached as Schedule B – including Appendices A through C; (b) Submit a copy of your firm’s Health, Safety and Environmental Policy; (c) Submit a copy of your firm’s Quality Assurance and Quality Control procedures and details of recent performance achievement and accreditation awarded; (d) Submit copies of current insurance and limits for PL/PD, GL and Automobile; (e) Declaration of ability to provide a Performance Bond and Labour and Material Payment bond and relevant bonding capacity available; (f) Provide a current Worksafe BC Clearance Certificate. (g) Confirmation of ability to undertake the work commencing and completing in early fall 2011; and, (h) Respondent shall indicate if it is involved in any litigation, or any pending litigation, of any contractual dispute. The City reserves the right to request Respondents to submit additional information as may be required to complete or evaluate the Submissions. RFEOI/SOQ #1220-050-2011-011 Page 6 of 22 3.3 Signature The legal name of the person or firm submitting the Submission should be inserted in Schedule B. The Submission should be signed by a person authorized to sign on behalf of the Respondent and include the following: (a) If the Respondent is a corporation then the full name of the corporation should be included, together with the names of authorized signatories. The Submission should be executed by all of the authorized signatories or by one or more of them provided that a copy of the corporate resolution authorizing those persons to execute the Submission on behalf of the corporation is submitted; (b) If the Respondent is a partnership or joint venture then the name of the partnership or joint venture and the name of each partner or joint venturer should be included, and each partner or joint venturer should sign personally (or, if one or more person(s) have signing authority for the partnership or joint venture, the partnership or joint venture should provide evidence to the satisfaction of the City that the person(s) signing have signing authority for the partnership or joint venture). If a partner or joint venturer is a corporation then such corporation should sign as indicated in subsection (a) above; or (c) If the Respondent is an individual, including a sole proprietorship, the name of the individual should be included. 4. EVALUATION AND SELECTION 4.1 Evaluation Team The evaluation of Submissions will be undertaken on behalf of the City by an Evaluation Team appointed by the City (the “Evaluation Team”), which may consist of one or more persons. The Evaluation Team may consult with others including City staff members, third party consultants and references, as the Evaluation Team may in its discretion decide is required. The Evaluation Team will give a written recommendation for the selection of a Preferred Respondent or Preferred Respondents to the City. The City will make the final decision regarding any Respondent or terminate the RFEOI/SOQ process at its sole discretion. The City will then advise all Respondents and the selected Respondent (if one is chosen) in writing of the City's decision. 4.2 Evaluation Criteria The Evaluation Team will compare and evaluate all Submissions to determine the Respondent’s strength and ability to provide the Services in order to determine the Submission, or Submissions, which are most advantageous to the City, using the following criteria: Criterion 1: Experience, Reputation and Resources – The Respondent’s experience, reputation and resources as applicable to the performance of the Services; Criterion 2: Background and Experience of all key personnel proposed; Criterion 3: Principal projects completed in the past five years in Appendix A; RFEOI/SOQ #1220-050-2011-011 Page 7 of 22 Criterion 4: Suitability of Respondent’s proposed track surfacing system; Criterion 5: Similar or related projects completed in Appendix B; Criterion 6: Major projects underway as of the date of submission in Appendix C; and Criterion 7: Compliance with the City’s desired minimum qualification requirements, as outlined in Schedule A - Services (Item 4). Refer Schedule A - Services for the additional minimum qualifications and other requirements desired by the City for both the Respondent and the Respondent’s proposed key personnel. The Evaluation Team may apply the evaluation criteria on a comparative basis, evaluating the Submissions by comparing one Respondent’s Submission to another Respondent’s Submission. Specific weightings are not assigned to the individual evaluation criteria. All criteria considered will be applied evenly and fairly to all Submissions. Submissions will be reviewed and evaluated with the objective of developing a short-list of prequalified firms who will be invited to submit tenders for the proposed work. Solicitation packages are expected to be issued in late July, 2011, immediately after the RFEOI/SOQ evaluation process is completed. 4.3 Litigation In addition to any other provision of this RFEOI/SOQ, the City may, in its absolute discretion, reject a Submission if the Respondent, or any officer or director of the Respondent submitting the Submission, is or has been engaged directly or indirectly in a legal action against the City, its elected or appointed officers, representatives or employees in relation to any matter. In determining whether or not to reject a Submission under this section, the City will consider whether the litigation is likely to affect the Respondent’s ability to work with the City, its consultants and representatives and whether the City’s experience with the Respondent indicates that there is a risk the City will incur increased staff and legal costs in the administration of the Contract if it is awarded to the Respondent. 4.4 Additional Information The Evaluation Team may, at its discretion, request clarifications or additional information from a Respondent with respect to any RFEOI/SOQ, and the Evaluation Team may make such requests to all Respondents or only to selected Respondents. The Evaluation Team may consider such clarifications or additional information in evaluating a Submission. 4.5 Interviews The Evaluation Team may, at its discretion, invite some of the Respondents to appear before the Evaluation Team to provide clarifications of their Submissions. In such event, the Evaluation Team will be entitled to consider the answers received in evaluating Submissions. RFEOI/SOQ #1220-050-2011-011 Page 8 of 22 5. GENERAL CONDITIONS 5.1 No Obligation This RFEOI/SOQ is not a tender and does not commit the City in any way to pre-qualify a Preferred Respondent(s), or to proceed to negotiations for an agreement, or to award any agreement, and the City reserves the complete right to at any time reject all Submissions, and to terminate this RFEOI/SOQ process. 5.2 Respondent's Expenses Respondents are solely responsible for their own expenses in preparing, and submitting a Submission, and for any meetings, negotiations or discussions with the City or its representatives and consultants, relating to or arising from this RFEOI/SOQ. 5.3 No Claims The City and its representatives, agents, consultants and advisors will not be liable to any Respondent for any claims, whether for costs, expenses, losses or damages, or loss of anticipated profits, or for any other matter whatsoever, incurred by the Respondent in preparing and submitting a Submission, or participating in subsequent solicitation requests, negotiations for an agreement, or other activity related to or arising out of this RFEOI/SOQ, including in the event the City accepts a non compliant Submission or otherwise beaches the terms of this RFEOI/SOQ. 5.4 Conflict of Interest Respondents shall disclose any potential conflicts of interest and existing business relationships they have with the City, its elected or appointed officials or employees. The City may reject a Submission from any Respondent that the City judges would be in a conflict of interest if the Respondent is awarded a contract. The City may rely on such disclosure. 5.5 Solicitation of Council Members and City Staff Respondents and their agents will not contact any member of the City Council or City staff with respect to this RFEOI/SOQ, other than the City Representative named in section 2.7, at any time prior to the award of an agreement or the termination of this RFEOI/SOQ, and the City may, at its discretion, reject the Submission of any Respondent that make any such contact. 5.6 Confidentiality All Submissions become the property of the City and will not be returned to the Respondent. All Submissions will be held in confidence by the City unless otherwise required by law. Respondents should be aware the City is a "public body" defined by and subject to the Freedom of Information and Protection of Privacy Act of British Columbia. RFEOI/SOQ #1220-050-2011-011 Page 9 of 22 SCHEDULE A - SERVICES Resurfacing of Bear Creek Park Running Track 1. PROJECT BACKGROUND & OVERVIEW The project includes resurfacing of a eight-lane running track facility located at Bear Creek Park, 13750 – 88th Avenue, Surrey, BC. The site is an important track and field asset within the City, hosting many school and community track and field competitions throughout the year. The track is also used extensively for informal walking and jogging by the community and local sports groups. The track has been reconstructed and resurfaced since its initial installation, with the latest restoration occurring approximately 12 years ago when a second coat of 5 mm thick polyurethane-bound EPDM surfacing material was applied. The surfacing currently consists of a 10 to 12 mm thick polyurethane bound SBR base layer with two red EPDM top coats totaling 5 to 7 mm. The total thickness of the existing track surfacing is 15 to 17 mm (one base coat with two top coats). The track surface is generally in good structural condition, however, the surface has worn to an unacceptable level with substantial loss of texture. In addition, the lines have faded and minor delamination has occurred along the inner and outer edges. 2. PROJECT SCOPE The scope of work generally includes resurfacing the entire running track as well as resurfacing of the jump and throw event areas using a minimum 5 mm thick impermeable, polyurethane-bound red Ethylene Propylene Dien Polimerisat (EPDM) rubber granule synthetic track surfacing material. In addition, re-leveling of some relatively minor areas of the main track and high jump area will be needed to correct unevenness and poor surface drainage. Additional miscellaneous related work includes removal of a surplus javelin runway located on the north side of the track, replacement of the pole vault box/landing area and repair of any isolated areas of surface delamination. Drainage improvements include the installation of approximately 15 new trench drain style catch basins within the existing inner concrete edger, connection of the new catch basins to the track drainage system and restoration of any disturbed sections of concrete curbing around each catch basin. RFEOI/SOQ #1220-050-2011-011 Page 10 of 22 3. PROJECT TIMELINE The City anticipates the project timelines will be as follows: Activity Solicitation issued Respondents Timeline to shortlisted August 2, 2011 (ITT Issue Date) Announce Shortlist August 2, 2011 Issue Invitation To Tender (ITT) and August 2 to August 16, 2011 Solicitation Period Evaluation & Selection Process (ITT) August 18, 2011 Award of a Contract August 22, 2011 Project Completion September 19, 2011 [Note to Respondents: the Award of a Contract date is subject to change] The City intends to meet these dates but reserves the right to change any date at its sole discretion. Respondents and their agents will not contact any member of the City Council or City staff with respect to this RFEOI/SOQ, other than the City Representative named in section 2.7, at any time prior to the award of an agreement or the cancellation of this RFEOI/SOQ. 4. ADDITIONAL MINIMUM QUALIFICATION REQUIREMENTS Company Experience: The Respondent shall submit documented experience with polyurethane track surfacing as well as track re-surfacing within the past 5 years. In addition, the Respondent should provide three written references from three different organizations for which the Respondent has, within the past five years, performed work that is similar in nature and complexity to the project described herein, which reference should include the contact name, title, organization name, address, current telephone and facsimile numbers, and a short description of the work performed by the Contractor. Key Personnel (including Crew Superintendent): The Respondent should provide information on the background and experience of all key personnel proposed to provide the Goods and Services (use the spaces provided and/or attach additional pages, if necessary). Also, provide a resume for the proposed Crew Superintendent of the resurfacing running track team giving details of experience, qualifications, etc. At a minimum, the Crew Superintendent’s resume shall include total years of relevant experience, number of track surfacing projects completed, number of resurfacing projects completed, and experience with the application methods and surfacing materials proposed for the Bear Creek Park project. The Crew Superintendent shall have a minimum of 8 years of relevant running track synthetic surfacing experience, with experience in track resurfacing using the surfacing proposed for Bear Creek track. RFEOI/SOQ #1220-050-2011-011 Page 11 of 22 SCHEDULE B RESPONDENT’S REQUEST FOR EXPRESSIONS OF INTEREST AND STATEMENTS OF QUALIFICATIONS (RFEOI/SOQ) This document is intended to provide information on the capacity, skill, and experience of the Contractor. Respondent may supplement information requested with additional sheets if required. Project Title: Resurfacing of Bear Creek Park Running Track Type of Pre-Qualification: Construction Work Project No.: 1220-050-2011-011 Submitted To: Acting Purchasing & AP Manager Address: City of Surrey – Purchasing Section 6645 – 148 Street Surrey, B.C. V3S 3C7 Fax: 604-599-0956 E-mail for PDF Files: purchasing@surrey.ca A. SUBMITTED BY FIRM NAME: 1. Full Legal Name of Firm 2. Address 3. Phone No. 4. Email: Fax No. B. LEGAL STRUCTURE OF COMPANY: 5. Corporation __________ Partnership __________ Individual ____________ 6. If Corporation/Partnership, year incorporated/organized: ___________________________. 7. Names and addresses of authorized signatories: C. FINANCIAL REFERENCES: 8. Bank Name: Location: Contact Person(s): Phone No.: Fax No. Email: RFEOI/SOQ #1220-050-2011-011 Page 12 of 22 9. Bonding Firms Name: Address: Contact Person(s): Phone No.: Fax No. Email: 10. Insurance: Insurance Company: CGL Policy Limit: $ E&O Policy Limit $ Contact Person(s): Phone No.: Fax No. 11. Annual value of construction work for the past five years: 20__________ $ 20__________ $ 20__________ $ 20__________ $ 20__________ $ 12. Annual value of related civil work constructed over the past five years (if different from Response 11, above): 20__________ $ 20__________ $ 20__________ $ 20__________ $ 20__________ $ 13. Principal projects completed in the past five years. Listed in Appendix “A”. (As attached) 14. Similar or related projects completed. Listed in Appendix “B”. Refer to the additional minimum qualification requirements indicated in Schedule A – Services. (As attached) 15. Major projects underway this date. Listed in Appendix “C”. (As attached) 16. Key administrative/operational personnel proposed for the project, attach resume of qualifications and experience: (e.g. Principal in Charge, Project Manager, etc.) Name: _________________________________ Title / Position: __________________________________ _________________________________ __________________________________ _________________________________ __________________________________ RFEOI/SOQ #1220-050-2011-011 Page 13 of 22 17. Site personnel proposed for the project, attach resume of qualifications and experience: (e.g. Project manager, Track Surfacing Crew Superintendent, etc.). Refer to the additional minimum qualification requirements indicated in Schedule A – Services. Name: _________________________________ Title / Position: __________________________________ _________________________________ __________________________________ _________________________________ __________________________________ 18. Has your firm or any predecessor firm defaulted on a contract or had work terminated for non-performance within the last five (5) years? If so, on a separate sheet describe the project, owner, date and circumstances/reasons. 19. Additional Information: What other information is not requested here but which you think the City should consider in evaluating your company? Comments This Submission is submitted this __________ day of _________________________, 2011. I/We have the authority to bind the Respondent. ___________________________________ ______________________________________ (Name of Respondent) (Name of Respondent) ___________________________________ ______________________________________ (Signature of Authorized Signatory) (Signature of Authorized Signatory) ___________________________________ ______________________________________ (Print Name and Position of Authorized Signatory) (Print Name and Position of Authorized Signatory) RFEOI/SOQ #1220-050-2011-011 Page 14 of 22 APPENDIX A PRINCIPAL PROJECTS COMPLETED IN THE PAST FIVE YEARS: Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ RFEOI/SOQ #1220-050-2011-011 Fax: ______________________ Page 15 of 22 APPENDIX A (cont’d) Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ RFEOI/SOQ #1220-050-2011-011 Fax: ______________________ Page 16 of 22 APPENDIX A (cont’d) Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ RFEOI/SOQ #1220-050-2011-011 Fax: ______________________ Page 17 of 22 APPENDIX A (cont’d) Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ Project Title: ______________________________________________________________ Project Location: ______________________________________________________________ Project Scope: ______________________________________________________________ Contract Value ($): ______________________________________________________________ Completion Date: ______________________________________________________________ Fax: ______________________ Role (ie: General Contractor, Sub): ______________________________________________________________ Name of Owner (or Consultant): ______________________________________________________________ Refer To (Contact): ______________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ______________________________________________________________ RFEOI/SOQ #1220-050-2011-011 Fax: ______________________ Page 18 of 22 APPENDIX B SIMILAR OR RELATED PROJECTS COMPLETED: Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ RFEOI/SOQ #1220-050-2011-011 Fax: ________________________ Page 19 of 22 APPENDIX B (cont’d) Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ RFEOI/SOQ #1220-050-2011-011 Fax: ________________________ Page 20 of 22 APPENDIX C MAJOR PROJECTS UNDERWAY AS OF THE DATE OF SUBMISSION: Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ RFEOI/SOQ #1220-050-2011-011 Fax: ________________________ Page 21 of 22 APPENDIX C (cont’d) Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Project Title: ________________________________________________________________ Project Location: ________________________________________________________________ Project Scope: ________________________________________________________________ Contract Value ($): ________________________________________________________________ Completion Date: ________________________________________________________________ Fax: ________________________ Role (ie: General Contractor, Sub): ________________________________________________________________ Name of Owner (or Consultant): ________________________________________________________________ Refer To (Contact): ________________________________________________________________ Telephone/Fax Numbers: Phone: _______________________ E-Mail of Project Reference: ________________________________________________________________ Fax: ________________________ Revised: 2011-07-08 RDO RFEOI/SOQ #1220-050-2011-011 Page 22 of 22