Sacramento City College Unit Plans Completed Spring 2003

advertisement

Sacramento City College

Unit Plans

Completed Spring 2003

Department Name: Assessment

Department Spokesperson: Ivor McVarish

Division Dean: Myra Borg

Place an X in the boxes of included elements:

Accomplishments

X

X

Three-Year Plan

X

Action Plan

X Budget Request

X Budget Narrative

X Key Performance Indicators

Assessment Department / Accomplishments 2002 – 2003

#

1a

1b

2a

2b

Goal 1: Increase the efficiency of computerized testing in SCC Computerized Testing Lab.

Linkage to

Action Item Year-End Status and Accomplishments other Plans

Increase the number of computer stations by eight for a total of

27 stations to alleviate wait-lists.

PT2, PT3,

M3

There are now 27 student stations in the lab, including 2 ADA stations.

Incorporate all the data bases that hold test results into a universal data base and have it available on Computer #21 in SS

#121. Each student would be checked for prior testing. This would not necessarily facilitate check-in but might eliminate much repeat testing. Universal data base would expedite finding results when students request duplicates in SS#121

PT2, PT3,

M3

All data back to 1994 is now in one database

(ASAP). This database can be accessed from all staff computers through ASAP Look.

Students are being checked for prior tests when they enter the lab.

Goal 2: Increase access to test results for authorized personnel.

SCC Counselors have access to test results on the computers in PT2, PT3, Counselors now have access to all assessment their offices reducing the need for counselors to come to

Assessment for duplicates.

M3 records back to 1994 through ASAP Look.

Streamline the process for retrieval of results at outreach centers by allowing access to results on Outreach Counselors office computer.

PT4, M3 Outreach centers now have access to all assessment results back to 1994 through ASAP

Look.

3a

4a

Goal 3: Design and conduct a study of the effectiveness of the SAC Program.

Work with SCC Research to collect and analyze data prior to Project is on hold pending reevaluation of goal. redesigning the SAC program. PT2, M3

Goal 4: Create a universal data base of test results.

Assessment staff to work with College Board of Tech support,

CAPP Associates, SCC Computer Services to consolidate data bases.

M3

All data back to 1994 is now in one database

(ASAP).

4b

Prepare test data in a single format in preparation for PeopleSoft system. M3

Data can be provided to PeopleSoft in any format they choose through ASAP.

Goal 5: Make Assessment results available to SCC Counselors on the computers in their offices.

Assessment staff will work with ARC Assessment to adapt their Project cancelled as no longer necessary due to

5a software to our system.

5b Investigate PeopleSoft system capabilities. improvements in ASAP/CAPP software.

Project is ongoing.

Assessment Department / Accomplishments 2002 – 2003

#

Goal 6: Assessment Counselor to regularly update campus on Assessment matters.

Action Item

6a Use e-mail for monthly updates

6b

6c

Attend Counselor meetings

Conduct faculty/staff survey and continuing student survey in preparation for Assessment Self-Study for the

Matriculation Site Visit.

Linkage to other Plans

M3

M3

M3

Year-End Status and Accomplishments

Keyfile has removed need for email updates

Meeting are attended as necessary to update and educate counselors about Assessment issues.

Project on hold pending more information about scheduling of site visit.

Goal 7: Update office equipment and software.

7a Replace copier with more efficient desktop model PT3, M3 Remains an assessment need.

7b

Prepare computers to be compatible with PeopleSoft. PT3, M3 Complete as far as we know. More information on

PeopleSoft requirements needed.

7c

Replace monitors in lab and Assessment Center with flat screen monitors to reduce flicker and save space.

PT3, M3 Remains an assessment need.

Goal 8: Staff to continue with computer training.

Staff members to improve their knowledge of computer systems and software by continuing to take training offered

PT5, M3 Staff is making good progress with regard to continuing computer training.

8a by the District and classes at SCC when appropriate for their work schedules.

Other Accomplishments:

Keyfile implemented for storage and access of Competency and ATB results. Access provided to Financial Aid and Admissions &

Records.

Lab hours have been extended an additional five hours each week.

Delivery time for assessment results to most students has been cut from up to 24 hours during busy times to a few minutes.

Converted EFL and ESL ATB testing from paper and pencil to computerized version compatible with ASAP database and software.

Online orientation now offered in the lab during all open testing hours.

Upgraded the testing lab to automatically print reports and capture data.

Completed installation and training on new Study Behavior Inventory Assessment.

Online computerized assessment testing made available at outreach centers.

Modified placement system and software to accommodate course renumbering.

Successfully piloted onsite online testing at Delta High School.

1.

2.

3.

Three-Year Plan

Assessment Department

Long Range Plan

Provide valid, reliable and fair assessment information to student and staff related to competency, course and program eligibility, education goals and performance.

Provide specialized assessments for aptitude, interests, study skills, and referral to additional services when needed.

Provide valid Ability-to-Benefit testing on a walk-in basis.

2004-2005 2005-2006 2006-2007

X

X

X

X

X

X

X

X

X

4.

5.

6.

Publicize and clarify the process of assessment for students, staff and the general public.

Assist with systematic research planning for assessment viability and impact issues.

Increase ratio of enrolled students tested to non-enrolled students.

7. Decrease ratio of retests to first-time tests.

Increase number and ratio of students

8. participating in online orientation in the

Assessment lab.

9.

10.

Continue to identify and work with SAC schools that can be converted to onsite computerized application, testing and orientation.

Continue to upgrade assessment instruments and systems as improved technology becomes available.

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

#

1a

1b

Assessment Department / Action Plan 2003 – 2004

Action Item

Goal 1: Improve testing conditions in the lab.

Linkage to Other

Plans

Year-end Status and Accomplishments

Replace existing monitors with flat screen monitors to reduce flicker and provide desk space for paper and pencil testing and use of scratch paper for math.

Complete software and hardware installation and training to comply with ADA requirements

DAG1, DOE7, M3,

PT7

DAG1, DOE7, Title

5, M3, PT7

2a

Goal 2: Increase ratio of enrolled students tested to non-enrolled students.

Continue to publicize new “enroll first” policy

M2, M3, PT3, PT7,

PT9

2b

Check all students testing in the lab for student ID numbers to verify enrollment.

M2, M3, PT7, PT9

M2, M3, PT7, PT9 2c Track progress.

Goal 3: Decrease ratio of retests to first-time tests..

3a Confirm retest policy with faculty and counselors

3b Publicize policy

3c Check students for prior test at the door to the lab.

M3, PT3, PT7

M3, PT7

M3, PT7

3d Track progress M3, PT7

Goal 4: Increase number and ratio of students participating in online orientation in the Assessment lab.

DSS2, DAG1,

DAG8, AB3, Title5,

4a Continue to improve and promote online orientation.

M3, PT3, PT4, PT7,

PT9

4b

Automate presentation of orientation after assessment.

DSS2, DAG1,

DAG8, AB3, Title5,

M3, PT4, PT7, PT9

4c Track number of students participating in the lab.

DSS2, DAG1,

DAG8, AB3, Title5,

M3, PT4, PT7, PT9

Assessment Department / Action Plan 2003 – 2004

Goal 5: Continue to identify and work with SAC schools that can be converted to onsite computerized application, testing and orientation.

5a

5b

Identify at least one additional potential school and expand program.

Work with identified high school staff to coordinate program.

DSS8, DAG8,

DAG9, M3, PT4,

PT7, PT9

DSS8, DAG8,

DAG9, M3, PT4,

PT7, PT9

5c

6a

7a

7b

Conduct surveys to track satisfaction and improve program and process.

Locate and organize validation research data

DSS8, DAG8,

DAG9, M3, PT4,

PT7, PT9

Goal 6: Work with faculty and counselors to establish recency recommendations for assessment scores.

Meet with research department and discuss research

M3, PT3, PT7, PT9 feasibility and/or design

Goal 7: Prepare for Matriculation Site Visit

Coordinate with Research Department to conduct disproportion impact studies

AB3, Title5, M3,

PT3

AB3, Title5, M3,

PT3

7c

Monitor publicized prerequisite information for accuracy and compliance with Title 5.

7d Send staff member to CCCAA swat team training

7e Invite CCCAA team to visit the Assessment Center.

AB3, Title5, M3,

PT3

AB3, Title5, M3

AB3, Title5, M3,

PT3

Goal 8: Establish KPIs

1a Evaluate data to determine beneficial KPIs

2a

Work with Capp and Associates to add KPIs to standard reporting menu options.

MA3, PT3

MA3, PT3

Line

#

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Description

27 flat screen monitors

Classified Temp help

Operating

Budget

Increase

Totals

Assessment Department Budget Request 2004 - 2005

Instruction

Supplies

Computers Equipment Furniture

16,000

16,000

New

Program

Start-up

Marketing

Materials

Remodel

Space

Faculty

Hires

Staff

Hires

Student

Hires

Temp

Hires

10,000

10,000

Line

#

Description

1 27 flat screen monitors

6

7

8

9

2

3

4

5

10

11

12

13

14

15

Classified Temp help

Budget Narrative 2004 – 2005

Assessment Department

Total

Amount

Priority

Rank

16,000

10,000

1

1

Justification

Improve resolution, reduce flicker and glare and provide increased desk space in assessment lab.

Replace lost PFE funds needed to maintain sufficient staff.

Key Performance Indictors for Assessment Department

5/1/02 to 5/1/03

Score/Test Description Total Tests Taken Retests

Placement and Graduate Competency

20 ESL Essay

21

22

23

CPT Reading

CPT Sent Skills

CPT Arithmetic

906

8204

7428

6087

86

1001

831

708

24

25

26

28

31

32

33

34

39/40

9/12

CPT Algebra

CPT CLM

LOEP Reading

LOEP Language

Companion Reading

Companion Sent Skills

Companion Arithmetic

Companion Algebra

Celsa

DTMS

Total Tests Given

Total Students Tested

Career Interest Inventories

Myers Briggs

Strong Interest

Study Skills

SBI

Other

ATB

239

1166

30

98

37,135

10,730

5605

2191

1089

1090

1506

1496

644

435

1,079

25

95

0

0

1

1

0

28

3,967

733

332

112

113

11

10

0

Not calculated

HIGH

SCHOOL

American

Legion

Burbank

Capital City

Christian

Brothers

Davis

Davis School for Ind. Stud.

Delta

Discovery

Fremont

Hiram

Johnson -

Main

Hiram

Johnson -

West

Kennedy

Martin Luther

King

McClatchy

Natomas

Charter

River City

Senior Assessment for College Comparison

1997 1998

8 canceled

120

24

20

101

35

31

1999

3

90

31

22

2000

38

40

52

32

-

2001 canceled canceled

41

4

42

62

2002

18

2003

34

94 66 canceled canceled

23

74

5 canceled Canceled canceled canceled canceled

26

15

124

73

174

8 canceled Canceled canceled canceled

127

85

20

8

93

38

173

145

64

31 discont.

95

80

153

154

47

89

71

128

140

12

33

20

29

-

117

49

166

220

47

117

24

29

-

116

71

69

10

190

17

117

36

80

8

23

17

-

140

49

159

5

241

27

116

Sacramento 96

Sarah Jones 5

St. Francis 46

Yolo 10

126

10

34

5

138

6

53

20

110 canceled

34

27

92

14

19 canceled

118 discont.

39

9

147

-

34

5

TOTAL 966 883 923 806 1,039 1,018 1,187

1

2

3

4

Delta High School Onsite Online Matric Survey

Good Average Poor

The online application was clear and easy to complete

The assessment test directions were clear and understandable

I understand the Orientation content and feel ready to meet with a Counselor

I was able to complete the New Student

Orientation Review successfully

15

15

13

12

8

8

8

9

2

2

3 5 The overall process was… 20

SCC Counselor ASAP Look Survey

All counselors were survey – twelve responded

Response Count

Very satisfied

Satisfied

7

3

Not satisfied

Don’t use it

Don’t know how to use it

1

1

Download