LRO Project Organization
Lunar Reconnaissance Orbiter Project (LRO)
Code 431
Lunar Reconnaissance Orbiter
(LRO)
Project Manager
C. Tooley
400
LRO Project
Scientist
G. Chin
Dpty. Proj. Scientist
J. Keller
Avionics Systems
Engineer
P. Luers
500
600
LRO Mission
System Engineer
M. Houghton (Acting)
Mission Flight
Engineer
M. Houghton
Spacecraft
Systems Engineer
M. Pryzby
I & T Systems
Engineer
J. Baker
Program Financial
Manager
W. Sluder
200
Resource Analysts
TBD
Operations
Manager
R. Schweiss
GN&C
Systems
E. Holmes
500
500
500
Reliability/Mission
Success Engineers
L. Lee
K. Deily
400
Safety Manager
D. Bogart
Manufacturing
Engineer
N. Virmani
Scheduling
A. Eaker
CM/DM
D. Yoder
Materials Engineer
P. Joy
MIS
A. Hess
J. Brill
RM Coordinator
A. Rad
300
Contamination Ctrl.
C. Lorenston
Launch Vehicle
Manager
T. Jones
400
400
500
*Matrixed Support from Program Office
INSTRUMENTS
500
Payload
Systems Engineers
J. Baker
L. Hartz
M. Reden
System Assurance
Manager
R. Kolecki
General Business
K. Yoder
400
500
400
CRaTER
D. Spence
Diviner
D. Paige
LROC
M. Robinson
LAMP
S. Stern
LEND
I. Mitrofanov
LOLA
D.Smith
Boston University
UCLA
Northwestern Univ.
SWRI
ISR, Moscow
GSFC
Current LRO GSFC Manpower
Summary
•XX Civil Servants
• XX Support Service Contractors
500
C & DH
Q. Nguyen
Mechanical
G. Rosanova
Contracting
Officer
J. Janus
Program Support
Manager
K. Opperhauser
Mission Business Mgr.
J. Smith
Payload Systems
Manager
A. Bartels
Software/Hardware
Systems Engineer
C. Wildermann
Program
DPM(s)/Resources
TBD
R. Kinder
T. Ajluni
Operations System
Engineer
R. Saylor
Procurement
Manager
TBD
ACS
Hardware
J. Simpson
Communications
J. Soloff
Electrical
R. Kinder
NASA’s Goddard Space Flight Center
Propulsion
C. Zakrzwski
Flight Dynamics
M. Beckman
D. Folta
ACS Analysis
J. Garrick
Software
M. Blau
Power
T. Spitzer
GDS
R. Saylor
Thermal
C. Baker
06/09/2005
04 - 2
LRO WBS
NASA’s Goddard Space Flight Center
04 - 3
LRO Project Procedures &
Guidelines Flow Down
NASA Procedural Requirements Including NPR 7120.5 NASA Program and Project Management Processes and Requirements
NASA On-Line Directive Information System http://nodis3.gsfc.nasa.gov/
GSFC Procedural Requirements and Technical Rules Including GPR 7120.1 NASA Program and Project Management Processes and Requirements
Goddard Directive Management System http://gdms.gsfc.nasa.gov/
RLEP Program Plan
430-PLAN-000008
LRO Requirements
ESMD-RQMT-0010
Status Key
Released
In CCB Baseline Review
Draft in Development Review
LRO Project Plan
431-PLAN-000002
LRO Integrated Independent
Review Plan
431-PLAN-000007
LRO Work Breakdown
Structure& Dictionary
431-WBS-000001
RLEP Mission Assurance
Requirements
430-RQMT-000006
LRO Safety Plan
431-PLAN-xxxxxx
LRO Reliability Plan
431-PLAN-xxxxxx
NASA’s Goddard Space Flight Center
LRO Systems Engineering
Management Plan
431-PLAN-000005
LRO Configuration
Management Plan
431-PLAN-xxxxxx
RLEP Continuous Risk
Management Plan
430-PLAN-000004
LRO Mission Requirements
Document
431-RQMT-000004
LRO Mission Verification
Plan
431-PLAN-000003
LRO Risk Management
Implementation Plan
431-PLAN-xxxxxx
Sibling Mission Level 2
Requirements
Documents (13)
LRO Integration & Test
Plan
431-PLAN-xxxxxx
LRO Instrument & Subsystem
Performance Assurance
Implementation Plans (7)
Instrument Contracts & In-House System Implementation Plans
04 - 4
LRO Project Control & Reporting
Monthly Cycle
Instrument Monthly Reporting
•Contract 533 Reports – Cost Plan, Act & Var.
•Schedule Status
•Cost & Workforce variance Analysis
•Budget Reserve Liens/Encumbrances
•Technical Progress& Problems
•Technical Resource margins
•Top Risks and Ranking
Spacecraft Subsystems & Ground System Monthly
Reporting
•SSC 533 Reports – Cost Plan, Act & Var.
• H/W Procurement Cost & Performance
•Schedule Status
•Cost & Workforce Variance Analysis
•Budget Reserve Liens/Encumbrances Requested
•Technical Progress& Problems
• Risks Reported thru Systems Meetings
Project Analysis & Synthesis
• Cost Variance & Analysis
• Work Force variance & Analysis
• Performance Milestone Status
• Reserve Status
• Schedule Slack
•Technical Resource margins
• Risk Identification & Ranking
Mission Systems
• Technical Risk Review, Analysis, &
Tracking
• Technical Resource Margins
• Integration & Test plan/schedule
• Technical Progress & Problems
NASA’s Goddard Space Flight Center
Report
•RLEP
•Pre-MSR (400)
•MSR/QSR (GSFC PMC
w/ESMD Attend)
• LRO generates legacy GSFC reporting products
• At Phase C Project level EVM products will be added.
04 - 5
LRO Project Risk Management Flow
Project
Risk Reporting
Risk
Management
Board
Trade-off
Safety
Risks
Technical
Performance
Risks
Project Control &
Implementation
Risks
Constraints
• System Safety, Payload Safety, &
Launch Site Safety
• Industrial Safety, Ground Safety,
Facility Safety, & OSHA
• Performance/Design Requirements
• Mission Success Assessments/Reliability & Risk
Assessment
• Cost Plan, Act & Var.
• Cost & Workforce Variance Analysis
• Technical Performance Margins & Variance
• Integration & Test Progress & Problems
• Hazard Analysis – PHA, SHA, &
OSHA
• Technical Risk Review, Analysis, & Tracking
• Budget Reserve Liens/Encumbrances
Requested
• Mission Assurance Assessment/Risk
Assessment – Matrix, FTA, & PRA (as
needed)
• Unresolved Technical & Operations Risks
• Residual Risks and Ranking
• Residual Risks and Ranking
• Residual Risks and Ranking
• Unresolved Programmatic Risks
• Risks Reported thru Systems Meetings
• Unresolved Safety Risks
NASA’s Goddard Space Flight Center
04 - 6
LRO Risk Management
Tracking, Ranking, & Reporting Example
Rank &
Trend
5
L
I 4
K
E
L 3
I
H
O 2
O
D
1
6
2
8
R
Baseline LRO Tracking Accuracy
Potentially Insufficient for LOLA
Investigation
3
*
R
Deployment and Articulation Systems Cost
4
*
M
LROC Optical Design Immaturity
5
*
M
LOLA Design Maturity Behind Schedule
W
RLEP Transfer To Ames
*
M
Propulsion Tank Forging Availability
8
*
M
Solar Array Technology
9

M
GSFC Work Force Management
10

W
7
6
2
1
3
4
5
7
CONSEQUENCES
Criticality
High
Med
Low
L x C Trend
M – Mitigate
 Unchanged
A – Accept
New since Last month
*
Approach
 Decreasing (Improving)
 Increasing (Worsening)
*
Mini-RF/Mini-SAR Addition to LRO
*
5
9
M
2
4
10

Risk Title
W – Watch
Reduction of FY05 budget
Risk Statement
Approach & Plan
Comments/Status
If: The grassroots cost estimate
for the deployment and
articulation systems is
significantly underestimated.
Then: There is a possibility of
significant LRO mission cost.
Research: Perform detailed
analysis of RFI responses and
develop both technical and
acquisition alternatives.
In Progress – RFI responses
rec’d and summarized. Wide
range of vendor cost
estimates.
3
M
NASA’s Goddard Space Flight Center
• RM Board is comprised of core systems
team and senior project management.
Meets monthly.
• Process is guided by Risk Management
Coordinator on Project Staff.
• Identification of Risks accomplished by
both grassroots risk identification at
instrument/subsystem level and top down by
management/systems identification of
mission risks.
• Specialized techniques applied by systems team
for reliability and safety assessments.
 Both reliability engineer and safety
engineer are part of systems team.
R – Research
LRO Risk # LROP-22 (in database) as reported 6/30/05
Rank
LRO Manages Risk Continuously
1
3
1
Approach
• LRO will develop PRAs for critical mission events
04 - 7
LRO Lifecycle Cost Estimate
Development
• LRO LCC estimate is in process.
POP 04-1 (FY06)
Initial Guiding Boundary Conditions
• 2008 launch
•Delta II class LV
•Accommodate Investigations sought
by ORDT/AO
• $400M cost target put forth in FAD
Conceptual Cost Estimates
• Parametric estimate based on historical
data for recent mission with similarities
• Application of simple CERs by Project
Refined Grassroots Estimates
• Done at subsystem level
- Subsystem estimates prelim. design based
- Instruments per proposals, C/D/E contracts
In Progress
POP 05-1 (FY07)
Initial Grassroots Estimates
• Done at subsystem level
- Subsystem estimates experience based
- Instruments per AO
LCC estimate for Confirmation Process
• Results from reconciliation of Grassroots
& RAO estimates. Reviewed by GSFC PMC
GSFC RAO Cost Modeling
• Mission input data defined/delivered
by Project
In Progress
NASA’s Goddard Space Flight Center
04 - 8
Download