LRO SRR Project Management NASA’s Goddard Space Flight Center 04 - 1 LRO Project Organization Lunar Reconnaissance Orbiter Project (LRO) Code 431 Lunar Reconnaissance Orbiter (LRO) Project Manager C. Tooley 400 LRO Project Scientist G. Chin Dpty. Proj. Scientist J. Keller Avionics Systems Engineer P. Luers 500 600 LRO Mission System Engineer M. Houghton (Acting) Mission Flight Engineer M. Houghton Spacecraft Systems Engineer M. Pryzby I & T Systems Engineer J. Baker Program Financial Manager W. Sluder 200 Resource Analysts TBD Operations Manager R. Schweiss GN&C Systems E. Holmes 500 500 500 Reliability/Mission Success Engineers L. Lee K. Deily 400 Safety Manager D. Bogart Manufacturing Engineer N. Virmani Scheduling A. Eaker CM/DM D. Yoder Materials Engineer P. Joy MIS A. Hess J. Brill RM Coordinator A. Rad 300 Contamination Ctrl. C. Lorenston Launch Vehicle Manager T. Jones 400 400 500 *Matrixed Support from Program Office INSTRUMENTS 500 Payload Systems Engineers J. Baker L. Hartz M. Reden System Assurance Manager R. Kolecki General Business K. Yoder 400 500 400 CRaTER D. Spence Diviner D. Paige LROC M. Robinson LAMP S. Stern LEND I. Mitrofanov LOLA D.Smith Boston University UCLA Northwestern Univ. SWRI ISR, Moscow GSFC Current LRO GSFC Manpower Summary •XX Civil Servants • XX Support Service Contractors 500 C & DH Q. Nguyen Mechanical G. Rosanova Contracting Officer J. Janus Program Support Manager K. Opperhauser Mission Business Mgr. J. Smith Payload Systems Manager A. Bartels Software/Hardware Systems Engineer C. Wildermann Program DPM(s)/Resources TBD R. Kinder T. Ajluni Operations System Engineer R. Saylor Procurement Manager TBD ACS Hardware J. Simpson Communications J. Soloff Electrical R. Kinder NASA’s Goddard Space Flight Center Propulsion C. Zakrzwski Flight Dynamics M. Beckman D. Folta ACS Analysis J. Garrick Software M. Blau Power T. Spitzer GDS R. Saylor Thermal C. Baker 06/09/2005 04 - 2 LRO WBS NASA’s Goddard Space Flight Center 04 - 3 LRO Project Procedures & Guidelines Flow Down NASA Procedural Requirements Including NPR 7120.5 NASA Program and Project Management Processes and Requirements NASA On-Line Directive Information System http://nodis3.gsfc.nasa.gov/ GSFC Procedural Requirements and Technical Rules Including GPR 7120.1 NASA Program and Project Management Processes and Requirements Goddard Directive Management System http://gdms.gsfc.nasa.gov/ RLEP Program Plan 430-PLAN-000008 LRO Requirements ESMD-RQMT-0010 Status Key Released In CCB Baseline Review Draft in Development Review LRO Project Plan 431-PLAN-000002 LRO Integrated Independent Review Plan 431-PLAN-000007 LRO Work Breakdown Structure& Dictionary 431-WBS-000001 RLEP Mission Assurance Requirements 430-RQMT-000006 LRO Safety Plan 431-PLAN-xxxxxx LRO Reliability Plan 431-PLAN-xxxxxx NASA’s Goddard Space Flight Center LRO Systems Engineering Management Plan 431-PLAN-000005 LRO Configuration Management Plan 431-PLAN-xxxxxx RLEP Continuous Risk Management Plan 430-PLAN-000004 LRO Mission Requirements Document 431-RQMT-000004 LRO Mission Verification Plan 431-PLAN-000003 LRO Risk Management Implementation Plan 431-PLAN-xxxxxx Sibling Mission Level 2 Requirements Documents (13) LRO Integration & Test Plan 431-PLAN-xxxxxx LRO Instrument & Subsystem Performance Assurance Implementation Plans (7) Instrument Contracts & In-House System Implementation Plans 04 - 4 LRO Project Control & Reporting Monthly Cycle Instrument Monthly Reporting •Contract 533 Reports – Cost Plan, Act & Var. •Schedule Status •Cost & Workforce variance Analysis •Budget Reserve Liens/Encumbrances •Technical Progress& Problems •Technical Resource margins •Top Risks and Ranking Spacecraft Subsystems & Ground System Monthly Reporting •SSC 533 Reports – Cost Plan, Act & Var. • H/W Procurement Cost & Performance •Schedule Status •Cost & Workforce Variance Analysis •Budget Reserve Liens/Encumbrances Requested •Technical Progress& Problems • Risks Reported thru Systems Meetings Project Analysis & Synthesis • Cost Variance & Analysis • Work Force variance & Analysis • Performance Milestone Status • Reserve Status • Schedule Slack •Technical Resource margins • Risk Identification & Ranking Mission Systems • Technical Risk Review, Analysis, & Tracking • Technical Resource Margins • Integration & Test plan/schedule • Technical Progress & Problems NASA’s Goddard Space Flight Center Report •RLEP •Pre-MSR (400) •MSR/QSR (GSFC PMC w/ESMD Attend) • LRO generates legacy GSFC reporting products • At Phase C Project level EVM products will be added. 04 - 5 LRO Project Risk Management Flow Project Risk Reporting Risk Management Board Trade-off Safety Risks Technical Performance Risks Project Control & Implementation Risks Constraints • System Safety, Payload Safety, & Launch Site Safety • Industrial Safety, Ground Safety, Facility Safety, & OSHA • Performance/Design Requirements • Mission Success Assessments/Reliability & Risk Assessment • Cost Plan, Act & Var. • Cost & Workforce Variance Analysis • Technical Performance Margins & Variance • Integration & Test Progress & Problems • Hazard Analysis – PHA, SHA, & OSHA • Technical Risk Review, Analysis, & Tracking • Budget Reserve Liens/Encumbrances Requested • Mission Assurance Assessment/Risk Assessment – Matrix, FTA, & PRA (as needed) • Unresolved Technical & Operations Risks • Residual Risks and Ranking • Residual Risks and Ranking • Residual Risks and Ranking • Unresolved Programmatic Risks • Risks Reported thru Systems Meetings • Unresolved Safety Risks NASA’s Goddard Space Flight Center 04 - 6 LRO Risk Management Tracking, Ranking, & Reporting Example Rank & Trend 5 L I 4 K E L 3 I H O 2 O D 1 6 2 8 R Baseline LRO Tracking Accuracy Potentially Insufficient for LOLA Investigation 3 * R Deployment and Articulation Systems Cost 4 * M LROC Optical Design Immaturity 5 * M LOLA Design Maturity Behind Schedule W RLEP Transfer To Ames * M Propulsion Tank Forging Availability 8 * M Solar Array Technology 9 M GSFC Work Force Management 10 W 7 6 2 1 3 4 5 7 CONSEQUENCES Criticality High Med Low L x C Trend M – Mitigate Unchanged A – Accept New since Last month * Approach Decreasing (Improving) Increasing (Worsening) * Mini-RF/Mini-SAR Addition to LRO * 5 9 M 2 4 10 Risk Title W – Watch Reduction of FY05 budget Risk Statement Approach & Plan Comments/Status If: The grassroots cost estimate for the deployment and articulation systems is significantly underestimated. Then: There is a possibility of significant LRO mission cost. Research: Perform detailed analysis of RFI responses and develop both technical and acquisition alternatives. In Progress – RFI responses rec’d and summarized. Wide range of vendor cost estimates. 3 M NASA’s Goddard Space Flight Center • RM Board is comprised of core systems team and senior project management. Meets monthly. • Process is guided by Risk Management Coordinator on Project Staff. • Identification of Risks accomplished by both grassroots risk identification at instrument/subsystem level and top down by management/systems identification of mission risks. • Specialized techniques applied by systems team for reliability and safety assessments. Both reliability engineer and safety engineer are part of systems team. R – Research LRO Risk # LROP-22 (in database) as reported 6/30/05 Rank LRO Manages Risk Continuously 1 3 1 Approach • LRO will develop PRAs for critical mission events 04 - 7 LRO Lifecycle Cost Estimate Development • LRO LCC estimate is in process. POP 04-1 (FY06) Initial Guiding Boundary Conditions • 2008 launch •Delta II class LV •Accommodate Investigations sought by ORDT/AO • $400M cost target put forth in FAD Conceptual Cost Estimates • Parametric estimate based on historical data for recent mission with similarities • Application of simple CERs by Project Refined Grassroots Estimates • Done at subsystem level - Subsystem estimates prelim. design based - Instruments per proposals, C/D/E contracts In Progress POP 05-1 (FY07) Initial Grassroots Estimates • Done at subsystem level - Subsystem estimates experience based - Instruments per AO LCC estimate for Confirmation Process • Results from reconciliation of Grassroots & RAO estimates. Reviewed by GSFC PMC GSFC RAO Cost Modeling • Mission input data defined/delivered by Project In Progress NASA’s Goddard Space Flight Center 04 - 8