Site Update Action Teams CREATING ACTION

CREATING
ACTION
PLANS
Site Update
Action Teams
 Colonial-Cambridge All Rights Reserved
Dreaming-Doing Continuum
ACTI
ON PLA
NS
 Colonial-Cambridge All Rights Reserved
CREATING
ACTION
PLANS
The Stages of Revisions
Meeting #
CREATING
ACTION
PLANS
Stage
1
2
3
4
5
6
7*if needed
Tactic Analysis
Hopes & Dreams/Review
planning team notes
Result Statements
Action Plans
Cost Benefit Analysis
Finalize plans/prepare for
presentation to Planning Team
 Colonial-Cambridge All Rights Reserved
CREATING
ACTION
PLANS
Tactic
• Type Tactic Here
 Colonial-Cambridge All Rights Reserved
Action Plans…
CREATING
ACTION
PLANS
•Provide explicit directions for action
•Describe what is required to realize results
 Specific tasks or activities
 Separately-assignable
 Latitude for on-time, on-site decisions
*understand that not all plans will be
implemented right away (within 3 years)
 Cost & benefit analysis
 Colonial-Cambridge All Rights Reserved
Finalize your plans
CREATING
ACTION
PLANS
• Post one Action Plan at a time & make
sure that it fully supports the result
statement. (If we do all of this, will we see
the result?)
• Make changes as necessary
• Get it typed up! 
 Colonial-Cambridge All Rights Reserved
Cost-Benefit Analysis
CREATING
ACTION
PLANS
Examine your work
What benefits will this plan create?
Tangibles and intangibles
What will it truly cost?
Tangibles and intangibles
Is this an adequate return on investment?
 Colonial-Cambridge All Rights Reserved
CREATING
ACTION
PLANS
Tangible
benefits
Forecast the quantitative advantages





Lower costs
Higher scores
More graduates
Additional revenue
Etc.
 Colonial-Cambridge All Rights Reserved
CREATING
ACTION
PLANS
Intangible benefits
Forecast the qualitative advantages




Improved morale
Higher self-esteem
Greater sense of involvement
Etc.
 Colonial-Cambridge All Rights Reserved
Tangible costs
CREATING
ACTION
PLANS
Approximate expenditures
• This will be used for site budgeting so it needs to be pretty
specific (subs, extra assignment, time, etc)
Funds for:
Supplies
Staff
Equipment
Consulting services
Etc.
 Colonial-Cambridge All Rights Reserved
Intangible costs
CREATING
ACTION
PLANS
Estimate the likely negative consequences
Qualitative issues:
Opportunities that will be missed if we do not do this
are _____, _____, _____???
Stress among ______?
Controversy among _____?
Frustration with ______?
Anxiety about ______?
Increased work load
Etc.
 Colonial-Cambridge All Rights Reserved
CREATING
ACTION
PLANS
Assignment
Draft a cost-benefit analysis for each
action plan.
When you think you have all of the
costs/benefits, see if they are
balanced! *We want to be able to justify our
plan…that the benefits clearly outweigh the costs.
 Colonial-Cambridge All Rights Reserved
CREATING
ACTION
PLANS
Next week’s plan
• Finalize Cost-Benefit Analyses
• Last draft of all plans
• Prepare for Planning Team
 Colonial-Cambridge All Rights Reserved