FAR Clauses
52.215-2, Audit and Records—Negotiation (Jun 1999) – Alternate II (Apr 1998) –
The basic clause is already called out in Corpdocs, but Alternate II applies if you are a
nonprofit or educational institution.
52.227-1, Authorization and Consent (Jul 1995) – Alternate I (Apr 1984) – The basic
clause is already called out in Corpdocs, but Alternate I also applies to you if your
contract is for research and development.
52.245-5, Government Property (Cost Reimbursement, Time-and-Material, or
Labor-Hour Contracts) (May 2004) – Alternate I (Jun 2003) – Applicable if
Government Property is furnished in the performance of this cost reimbursable or time
and material Contract. “Lockheed Martin” replaces “Government” or “United States,”
except in the phrases “Government property”, “Government-furnished property”, and in
references to title to property. “Lockheed Martin Procurement Representative” replaces
“Contracting Officer.” Paragraphs (g)(1), (g)(2), and (g)(3) are deleted and replaced with
the following: "Contractor assumes the risk of, and shall be responsible for, any loss or
destruction, or damage to, Government property covered by this clause. Contractor shall
not be liable for reasonable wear and tear to Government property or for Government
Property properly consumed in the performance of this Contract.” The following is
added as paragraph (m): “Contractor shall provide to LOCKHEED MARTIN immediate
notice of any disapproval, withdrawal of approval, or non-acceptance by the Government
of its property control system.”
52.246-9, Inspection of Research and Development (Short Form) (Apr 1984).
Applicable if you will be performing research and development work. “Government”
means “Lockheed Martin and the Government.”
DFARS Clauses
252.225-7012, Preference for Certain Domestic Commodities (Jun 2004).
(Applicable for all purchase orders/subcontracts with deliverables.)
252.225-7025, Restriction on Acquisition of Forgings (Apr 2003) (Applicable if you
will be delivering any items containing restricted forging items as listed in this clause.)
252.225-7030, Restriction on Acquisition of Carbon, Alloy, and Armor Steel Plate
(Apr 2003). Applicable to all purchase orders and subcontracts for carbon, alloy, and
armor steel plate in Federal supply class 9515 or described by American Society for
Testing Materials (ASTM) or American Iron and Steel Institute (AISI) specifications,
furnished as a deliverable item under the prime contract.
252.242-7005, Cost/Schedule Status Report (Mar 2005) Applicable if your contract is
other than firm-fixed-price, 12 months or more in duration, and has critical or significant
Document No. ATC083
1
Document No. ATC083
1/22/08
tasks related to the prime contract. “Government” and “Contracting Officer” mean
“Lockheed Martin.”
252.243-7002, Requests for Equitable Adjustment (Mar 1998). (Applies to all
purchase orders/subcontracts over $100,000.)
252.245-7001, Reports of Government Property (May 1994). (Applicable if
Government Property is provided or acquired under this Contract. Contractor shall
submit its required reports to Lockheed Martin. In paragraph (a)(3), change October 31
to October 10.)