Stakeholder Comment Form AESO AUTHORITATIVE DOCUMENT PROCESS Amendment of ISO OPP 503 NOTE: The AESO is asking market participants to provide an initial indication of their support for, or opposition to, the specific ISO OPP rule changes referenced below. Such an initial indication assists in the AESO’s practical understanding of the receptivity of the industry to the proposed changes. The AESO thanks in advance all market participants who choose to respond. With regard to the specific ISO OPP rule changes and their implications, such responses are without prejudice to the rights of market participants under the Act, any regulations, or related decisions of the Commission. Date of Request for Comment: Period of Consultation: 2009/11/19 2009/11/19 through 2009/12/04 Comments From: Date [yyyy/mm/dd]: Contact: Phone: E-mail: G1 Definitions to ISO Rules No change (mark with ”x”) Support Oppose No Comment Reason for Stakeholder Positions: Alternate Proposal: Proposed ISO OPP Rule Changes: 2009-November-19 Page 1 of 6 OPP 503 Empress Area Operation 1. Purpose To define the policies and procedures for the ISO to manage motor starts in the Empress area. (mark with ”x”) Support Oppose No Comment Reason for Stakeholder Positions: Alternate Proposal: 2. Background The ISO must coordinate the simultaneous starts of multiple motors, 25,000 hp or larger, in order to control under voltage conditions in the area. Specific operating conditions must be met before starting the 54,000 hp motor at Sand Hills to limit the effect of under voltage in the area. If specific conditions are not met, starting the motor may affect the reliability of the system. (mark with ”x”) Support Oppose No Comment Figure 1 shows the transmission system in the Empress area. Reason for Stakeholder Positions: Alternate Proposal: 3. 3.1 Policy Switching Amoco Empress (T163S) capacitor banks Depending on the real-time system conditions and when practical, one capacitor bank at Amoco Empress (T163S) must be put into service when any of the following conditions occurs: (mark with ”x”) Support Oppose No Comment (a) One Sheerness unit is out of service; (b) Depending on the real-time system conditions and when practical, the second capacitor bank at Amoco Empress (T163S) must be put into service when both Sheerness units are out of service. Proposed ISO OPP Rule Changes: 2009-November-19 Page 2 of 6 3.3 Motor starting at Sand Hills (second bullet amendment) The ISO must deny the request for approval to start the 54,000 hp motor at Sand Hills if the motor start could adversely affect system reliability or if the following conditions are not met: Both Sheerness generators are online, unless the SC approves starting the motor with one generator offline. (see Section 5.1 and Section 5.2). Reason for Stakeholder Positions: Alternate Proposal: 4. Responsibilities 4.1 ISO Outline, in the System Coordination Plan submitted to the SC, transmission facility owners (TFOs) and generation facility owners (GFOs), any transmission outages that would affect the motor starting capabilities in the area. 4.2 Empress area DTS customers (mark with ”x”) Support Oppose No Comment The following is a list of DTS customers in the Empress area: Confidential Table 1 provides contract levels for DTS customers and Confidential Table 2 provides customer contact information. Reason for Stakeholder Positions: Alternate Proposal: 5. 5.2 System Controller Procedures Starting the 54,000 hp motor at Sand Hills with two Sheerness units online The SC must: Proposed ISO OPP Rule Changes: 2009-November-19 (mark with ”x”) Support Oppose No Comment Page 3 of 6 1. 2. Ensure all required system conditions are met for the motor start. Deny any request for a motor start if any of the conditions stated in Section 3.3 are not met, or if the ISO assesses that the motor start could adversely affect system security. 5.3 Starting the 54,000 hp motor at Sand Hills with one Sheerness unit online The SC must: 2. Deny the customer’s request for a motor start, with the exception of both Sheerness generators online, if any of the conditions stated in Section 3.3 are not met, or if the ISO assesses that the motor start could adversely affect system security. Reason for Stakeholder Positions: Alternate Proposal: 6. Figures and Tables Proposed ISO OPP Rule Changes: 2009-November-19 (mark with ”x”) Page 4 of 6 Support Oppose No Comment Figure 1 Empress Area To A774S To A763S A767S Oyen 6L09 240 kV Lines M 138 kV Lines 914S Bindloss 69 kV Lines Metering points 7LA760 164S Empress Liquids M 760AL 204S Sandy Point To A801S 934L 7L760L 869L 230S Wardlow 950L 341S Sand Hills 601L 871L M 132S Ware Junction 951L M 931L 163S Amoco Empress 1002L 275S Jenner 944L 945L 1011L 562S Cypress To T28S 669L 658L 668L M To 895S 100L 760L 649S Chappice Lake 394S Empress 697L 830L 41S Medicine Hat A840S McNeill 172L 9LS1M To Saskatchewan To 532S Reason for Stakeholder Positions: Alternate Proposal: Proposed ISO OPP Rule Changes: 2009-November-19 Page 5 of 6 Please return this form with your comments by 2009/12/04 to: Jason Murray Manager Operations Services E-mail: opp_comments@aeso.ca Phone: (403) 705-5230 Fax: (403) 705-5252 Proposed ISO OPP Rule Changes: 2009-November-19 Page 6 of 6