Photolithography Area Status Thursday , February 03, 2011 General Information / Lab Activities Good morning All. Here is the morning Litho status report. No airflow in aisle L102(SVG coat/develop aisle) due to transfer fan problem. Due to this failure, there will be a loss of temperature, humidity and particulate control. Repairs are in progress. Please consider this as it relates to the sensitivity of your process. Please check back in Coral for latest tool updates and current equipment status. Thanks... The Litho Team Exposure Tools Status Comments Priority ASML Stepper Problem Energy Sensor Temp out of Range 1 EVAlign UP EVAlign2 UP EVG-Imprint UP Karl Suss 1 UP Karl Suss 2 UP Manual Coaters Status EVGSpraycoat Down Computer Down 2 Headway UP Laurel UP Coaters Process Status Optimizing process 3 SVGCoat SVGCoat2 3612 Process Up 3617 Process Up 220-7 Process Problem 3612 Process Up 955-0.7 Process Up 220-3 Process Up Developers Status SVGDEV UP SVGDEV2 UP Ovens / Hotplates Status BLUEM UP Blue M 90 C. UP Blue M 110 C UP Blue M 150 C UP Temperature Drift. Controller on order Temperature Drift. Controller on order Fusion DOWN Hotplate experiments UV-Cure UP White-Oven UP YES Vapor Prime UP Hotplates- Laurel-left UP Laurel- right UP Headway UP Torrey Pines- left UP 90 Deg C UP 115 Deg C UP Torrey Pines- Right UP Metrology/Inspection Status Alpha-Step 500 UP Nanospec 2-Litho UP Nanospec 1-Etch UP P2 Profiler PROBLEM Error -11 on Unload, reset to recover Microscpoes- #1 Leica/Analytical UP #2 Ergolux/Drytek2 UP #3 Olympus/Litho UP #4 Nikon Optiphot/Litho UP #5 Nikon/Litho UP #6 Leitz/Bosch UP #7 Leitz/Diffusion UP #8 Olympus/Litho UP #9 Olympus/Litho UP Miscellaneous Status EVBond UP KSBonder UP KSCoat UP Camera App and Data OK 4 Litho SRD UP