WESLEYAN \\ U N I V E R S I T Y Facilities 170 Long Lan e M i d d l e t o wn , C o n n e c t i c u t 0 6 4 5 7 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #2 Date: May 28, 2015 To: Bidders of Record Project: Bid Package Cross Street Sidewalk Replacement Between Fountain Avenue And Pine Street Annual Major Maintenance FY 16 SPECIAL NOTE: Addendum #1 information shall supersede the information contained in the Contract Documents This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated December 20, 2014, 5/22/2015 and May 2015 and related addenda and clarifications. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. Bid / Construction Schedule Bids due: June 1, 2015 @ 2:00PM Selection of successful bidders: June 2, 2015 Construction Start Date: June 3, 2015 Project Completion Date: August 14, 2015 http://www.wesleyan.edu/construction/majormaint/FY_16/FY_16.html Housing Opens/Students Arrive on campus: August 14, 2015 1. For the sanitary sewer services listed in the alternates, Do we trench back to sewer mainline in Cross st and start lateral at this point or lower just enough to avoid conflict with new drainage or to have enough cover with proper pitch? a. Require enough coverage with proper pitch. If it can be performed from the location at the lower walk, that would be great. 2. Also, one of the houses listed for new sewer is #107. It appears from the sewer as-builts the sewer lateral to house #107 is coming from the back of house on Pine street. Not sure the reason for new sewer lateral, if in fact the as-built is correct and lateral is coming in from Pine street. I would think that House #115 would possibly be a potential conflict for lack of cover on pipe a. You are correct. It enters the house from the back yard from Pine. Reconfirmed in the field today. b. Entrance of sanitary at 115 Cross St is from Fountain Ave south of the corner at Pine. There is a cleanout located on the south elevation at the corner of the jut out for the bathrooms. Electrical source for site lighting shall be from 109 Cross Street panel. This is an existing 200 am electrical panel. Coordination with Eversource for the lowering of existing gas service lines. Matt DeSimone Jr. is the construction technician. 203-317-4420 Major Maintenance FY16 Project Number 2016000026 ADDENDUM #21 Pre-Bid Conference -Page 1 5/28/15 Existing gas service line at 107 Cross Street is plastic. Excavation by site contractor shall be required to splice additional plastic pipe to lower service. Existing gas services at 109 Cross St and 113 Cross St are galvanized pipe. Gas service is in close proximity of existing domestic water service. Same excavation shall be used to install new plastic gas service to be snaked through existing galvanized pipe. Excavation of a bell hole at top of gas main in the street will be required by site contractor. Eversource will provide sand for padding of new gas line at these locations. Revised proposal form attached. Major Maintenance FY16 Project Number 2016000026 ADDENDUM #21 Pre-Bid Conference -Page 2 5/28/15