WESLEYAN \\ U N I V E R S I T Y Facilities 170 Long Lan e M i d d l e t o wn , C o n n e c t i c u t 0 6 4 5 7 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #1 Date: May 27, 2015 To: Bidders of Record Project: Bid Package Cross Street Sidewalk Replacement Between Fountain Avenue And Pine Street Annual Major Maintenance FY 16 SPECIAL NOTE: Addendum #1 information shall supersede the information contained in the Contract Documents This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated December 20, 2014, 5/22/2015 and May 2015. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. PreBid Meeting Minutes & Site Walks; May 22, 2015 Bid / Construction Schedule Bids due: June 1, 2015 @ 2:00PM Selection of successful bidders: June 2, 2015 Construction Start Date: June 3, 2015 Project Completion Date: August 14, 2015 http://www.wesleyan.edu/construction/majormaint/FY_16/FY_16.html Housing Opens/Students Arrive on campus: August 14, 2015 The prebid meeting addressed the following items: 1. Schedule: Completion dates shall be strictly adhered to. 1. Coordination of the work is critical. 2. Safety: Zero accidents. All contractors shall practice safe workmanship practices 3. Surrounding areas/buildings will be occupied throughout the project schedule. 4. OSHA Training: Contractor shall provide minimum 10 hour OSHA Training Certification for workman and minimum 30 hour OSHA Training Certification for Working Foreperson or Supervisor to Owner prior to start of work. Reference 01015 General Requirements. 5. Hazardous Materials: Contractor shall coordinate all required ACM removal with Owner. Inspection reports are available in the Owner’s office and will be posted to the MM FY15 website. 6. Parking; Parking on grass surfaces is strictly prohibited. Parking in driveway of the woodframe is acceptable. Off street parking is available. Additional parking is available at the Vine Street parking lot. 7. It is the contractors’ option to a flash drive or CD to obtain available AutoCAD drawings. 8. Contractors are encouraged to check the major maintenance website frequently for new and updated information. Addenda, specifications and additional project work will be posted to the website as it becomes available. 9. If out of office message is received when contacting R. Sillasen by phone or email, contractor is directed to call Steve Formica at 860-865-3778 or sformica@wesleyan.edu. Major Maintenance FY16 Project Number 2016000026 ADDENDUM # 1 Pre-Bid Conference -Page 1 5/27/15 10. A bond is not required. Builder’s Risk insurance is not required. 11. Umbrella insurance requirements is $5,000,000.00. Insurance Certificate must name Wesleyan University as additional insured. Construction documents dated 5/22/15. Summary of work provided to contractors at the pre-bid meeting. Documents and Contractor sign in sheet has been posted to the MM FY16 website http://www.wesleyan.edu/construction/majormaint/FY_16/FY_16.html. Major Maintenance FY16 project specifications are a part of this contract. Reference the project specifications reference box on the website. The Work shall include but not be limited to the following: 1. Coordination with the University and University Schedule 2. Site security / Traffic control 3. Coordination with other contractors 4. Test pits 5. Materials testing-paid by Owner 6. Excavation 7. Shoring 8. De-watering 9. Installation of filter fabric and geo-textiles 10. Drainage pipe installation 11. Yard drain installation 12. Catch basin installation 13. Domestic water service 14. Gas coordination / excavation 15. Sanitary excavation 16. Installation of drainage stone 17. Backfill 18. Compaction 19. Grading 20. Trench drains 21. Fine grading / landscaping & plantings 22. Installation of concrete and concrete curbing 23. Stamped Concrete-Bomanite – Tom Lockwood Major Maintenance FY16 Project Number 2016000026 ADDENDUM # 1 Pre-Bid Conference -Page 2 5/27/15 a. Running bond Belgium block b. Brick Red with autumn highlights 24. Curing 25. Paving 26. Road repair 27. Installation of retaining walls 28. Installation of site rails 29. Excavation for electrical 30. Electrical site lighting coordination 31. Coring 32. Tactile surfaces and coordination with City of Middletown 33. Coordination with the City of Middletown and Eversource is required 34. Concurrent project work will be taking place at the Exley Loading Dock 35. The surrounding dormitories and academic buildings will be occupied 36. Summer camps and Admission’s tours will require signage to reroute pedestrians to the north side of the street Where it is noted to remove existing privet hedge and replace with lawn, Contractor shall maintain to the extent possible privet hedge on the Pine Street elevation to the new sidewalk. Include the following additional plantings in the planting schedule: Boxwood, 5 gallon container, qty: 25. Locate in line with existing hedge to remain and plant to follow curve of concrete sidewalk to start of asphalt sidewalk. Substitute Pachysandra terminalis, qty. 396, in lieu of Rhus Aromatic ‘Grow Low’ Provide 2” mulch to cover all soil around all new plantings between new concrete and asphalt walks. Lawn restoration to be performed in all areas adjacent to new asphalt sidewalk. The owner has a meeting scheduled with Eversource for gas coordination –Thursday, 9:00 am, 5/28/15 Additional documents provided on the major maintenance website and made a part of this addendum, included in this submission and uploaded to the major maintenance website. http://www.wesleyan.edu/construction/majormaint/FY_16/FY_16.html Design drawings dated 5/22/2015 Design specifications dated 5/2015 Proposal form dated 5/27/15 Existing water elevations in basements of 107 Cross, 109 Cross and 113 Cross. Existing sewerage plan by City of Middletown water department Major Maintenance FY16 Project Number 2016000026 ADDENDUM # 1 Pre-Bid Conference -Page 3 5/27/15