Controls Southeast, Inc. Mailing: Post Office Box 7500, Charlotte, NC 28241 Shipping: 12201 Nations Ford Road, Pineville, NC 28134 www.csiheat.com Phone: Fax: 704-644-5000 704-644-5100 CONTROTRACE DATA SHEET Client Information Company: Contact Name: Phone Number: Email: Date completed: Drawings provided? Line list provided? P&ID’s provided? YES YES YES NO NO NO N/A N/A N/A Thermal Objective (Check one) 1. Maintain bulk process temperature? 2. Maintain pipe/tank/vessel wall temperature to prevent condensation? 3. Maintain above 32°F / 0°C for freeze protection? 4. CSI to recommend 5. Other: Process 6. Chemical Name: 7. Normal Operating Temperature: 8. Target Maintenance Temperature: 9. Upper Limit Temperature: 10. Lower Limit Temperature: 11. Density (ρ): 12. Viscosity (μ): 15. Process flow rate: F / F / F / F / Heating Medium 16. Media Type: Steam 17. Operating Temperature: F / 18. Operating Pressure: psig / 19. Type of steam trap to be used: Bucket 20. Maximum expected condensate return pressure: Vapor Liquid (Check one) C C C C 13. Thermal Conductivity (k): 14. Specific heat of process (Cp): Hot Oil Other: (Check one) C barg Float Disc Thermostatic Other: psig / barg (Check one) Environment/Other 21. Standard ControTrace is constructed from ASME SA-178 Gr.A carbon steel boiler tubing. (Other materials may be available.) Is this material acceptable for your application? YES NO (Check one) 22. Standard ControTrace pressure/temperature rating is 150 psig at 400F. Is this rating acceptable for your application? YES NO (Check one) 23. Is the ControTrace for Indoor or Outdoor use? Indoor Outdoor (Check one) 24. Ambient Design Temperature? F / C 25. Other comments: Rev.1 19-Feb-2010 Tank Design (if applicable) NOTE: If the information requested below is contained in documentation submitted within the RFQ, it is not required to complete these additional fields. 26. Tank Details: a. b. c. d. e. f. g. h. i. j. k. l. m. n. o. p. Tank diameter (D): Tank height (H): Tank material: Roof thickness (tRoof): Upper side wall thickness (t1): Middle side wall thickness (t2): Lower side wall thickness (t3): Insulation material: Insulation thickness (t4): Vent Stack diameter: Number of Inlet Stacks: Inlet Stack diameter: Stack height difference (hStack): High liquid level (HLL): Normal liquid level (NLL): Low liquid level (LLL): 27. How is the vessel vapor space being handled? (natural convection, forced air movement via ejector or blower, nitrogen blanket, etc) 28. What is the rate of vapor exchange in the vapor space (sweep air)? 29. At what temperature does the sweep air enter the vapor space? 30. Are insulation support rings located on the outside of the tank? If so, please indicate on above sketch. 31. Is the roof constructed of ‘pie-shaped’ plate pieces or ‘rectangular’ plate pieces? 32. Are the side wall plates lapped or butt-welded? 33. Are the roof plates lapped or butt-welded? 34. Are the roof rafters internal or external to the tank? 35. Are nozzles to be jacketed by CSI using ControHeat/ControTrace? If not, are they already jacketed? Additional Notes / Comments 36. 37. 38. 39. 40. Rev.1 19-Feb-2010