Kingdom of Saudi Arabia Ministry of Higher Education Majmaah University College of Engineering Department: Mechanical and Industrial Engineering Max Marks: 20 Home Assignment Subject: Computer aided manufacturing (ME 415) Submission: April25, 2014 Attempt all the questions: QN1. Write the part program G and M codes using multiple turning cycle G71 for the turned part as shown below. [5] The Billet is of 80mm length and 50 mm diameter. The radius of curve R is 25 mm R 40 R 20 15 30 20 10 20 15 QN2. Write the single turning cycle Code and taper turning codes for the final shape of work piece turned from turned from cylindrical billet of 80 mm length and 40mm diameter. [5] 40 20 40 20 20 QN3. An automobile factory operates 8 hrs a day and 4days in a week. There is 40 minutes break during each shift. There is production demand of 1500 units per week. The tasks and precedence constraints are given below. [5] Task Activity a b c d e f Fix front Axle Fix Engine Frame Place engine body Insert rear axle wheels Insert Hood Fix windows Time of element (Seconds) 20 sec 06 05 21 08 35 work precedence a b - g h i j k l Assemble gear assembly Insert spacers Secure front wheel Insert cooling system Attach sheet metal cover Add safety devices 15 c, d 10 15 05 46 g e, h c f, i, j 16 k Based on largest candidate rule, How many work stations are required? ii) What work elements each work station constitute? iii) Calculate balance delay. Q.4 a) Explain the followings; i) PEDIT command, Ortho mode, offset, polar array, face rotate, and slice [2] b) A transfer line is used to produce valves. The ideal cycle time is 1.0 minutes. The frequency of failures of transfer line is 10 break downs /hr. The down time per break down is 15 minutes. The estimated scrap rate is 5%. The operating cost of transfer line is $200/hr. The cost of tooling and disposables per product is $ 0.25. The cost of input raw material is $ 1.5. Compute: i) Production rate [3] ii) Transfer line efficiency iii) Cost of unit production