ECE 480 – Fall, 2009 Project/Team Preference Ranking Name (please print)___________________________ PID_________________ Major (EE or CPE) _____________ Rank the project titles below in the order of your preference to work on them (1 = highest, 6 = lowest***). ***NOTE: The projects marked with a “***” on the left will require that students sign an agreement of confidentiality and an agreement assigning any rights in intellectual property developed by students to the sponsor. You DO NOT have to work on a project requiring these agreements. If you do not wish to be assigned to a project requiring such agreements to be signed, rank the “***” projects as “NO.” If you assign any number to starred projects, you are explicitly AGREEING to sign the confidentiality and IP assignment agreements. Mark your preference rankings below, 1-6 (or fewer, if you say “NO” to any starred projects). Rank at least ALL UNSTARRED projects. HUMANITARIAN PROJECTS: _____ Team 1. MSU RCPD, Body Temperature Regulation Jacket for Quadriplegic Wearer – Phase II _____ Team 2. MSU Adv. Microsys./Controls Res. Gp., Low-Cost Electrochem. Sensor Sys. for Glucose OTHER PROJECTS: ***___ Team 3. Texas Instruments, Power over Ethernet for Wireless Home Automation _____ Team 4 Norfolk Southern, Cracked Rail Spike Detector ***__ Team 5. Whirlpool Corporation, Proximity Detector for Appliances _____ Team 6. Air Force Res. Lab, Small, Lightweight Speed/Distance Sensor for Skiers/Snowboarders If there are students in the 480 class with whom you would like to be teamed, write their names below (it will also help if they write your name on their preference sheets). Most teams will have 5 members; you do not need to fill in any names below, and 4 persons is the maximum number that will be teamed with you in any case. If you wish: Possible Team Member ____________________ Possible Team Member ____________________ Possible Team Member ____________________ Possible Team Member ____________________ (Highly optional – use with care): If there are any students with whom you have worked before as a partner, and with whom you do NOT want to be teamed again, indicate their names below: Former Team Member to Avoid ____________________ Former Team Member to Avoid _____________________ Ranking of Non-Technical Roles on Team (1=most preferred, 5=least preferred): Management_____ Webmaster______ Document Prep______ Presentation Prep____ Lab Coordinator______ Your preference for type of technical involvement in a project -- rank 1 (highest) to 5 (lowest): ____digital/microprocessor ____embedded systems software/robotic control ____analog circuits/power/sensors ____wireless/network ____Linux systems configuration/sys admin Check the following courses taken (or concurrent) and skills: ___ECE 313 ___ECE 320 ___ECE 366 ___ECE 405 ___ECE 416 ___ECE 420 ___ECE 474 ___ CSE 232 ___ CSE 355 ___ CSE 450 ___ Linux(sys builds) ___JAVA What is your planned graduation date? _____ F’09 _____Sp’10 _____Su’10 __________Other (specify) I cannot guarantee that you will be assigned to work with the team members you designate (if any), nor on the projects you ranked at or near the top, nor in the roles/technical activities you ranked highest. Many of you will pick the same attractive projects as your top ranked ones, and only a few can be assigned to them! I will try to accommodate your preferences as well as I can, while assuring that all students have a project and that all teams are balanced as well as I can. Return this form to Prof. Goodman, in person, in mailbox, or electronically, by Wednesday, September 2, 5pm, or your participation on a 480 team is in jeopardy.