ECE 480 – Spring, 2010 Project/Team Preference Ranking

advertisement

ECE 480 – Spring, 2010

Project/Team Preference Ranking

Name (please print)___________________________ PID_________________ Major (EE or CPE) _____________

Rank the project titles below in the order of your preference to work on them (1 = highest, 8 = lowest***).

***NOTE: The projects marked with a “***” on the left will require that students sign an agreement of confidentiality and an agreement assigning any rights in intellectual property developed by students to the sponsor. You DO NOT have to work on a project requiring these agreements. If you do not wish to be assigned to a project requiring such agreements to be signed, rank the “***” projects as “NO.” If you assign any number to starred projects, you are explicitly AGREEING to sign the confidentiality and IP assignment agreements.

Mark your preference rankings below, 1-8 (or fewer, if you say “NO” to any starred projects). Rank at least ALL

UNSTARRED projects.

HUMANITARIAN PROJECTS: Sponsor: George and Vickie Rock and Dow

Chemical Co.

_____ Team 1. SAiNT: Synchronized Audio INTerface for Text Annotation of Lectures

Sponsor: MSU Resource Center for Persons

_____ Team 4: Time-Sharing Computer System

Upgrades Adding Sound Management with Disabilities

_____ Team 2. Accessible Home Energy Audio

Sponsor: George and Vickie Rock and Dow

Chemical Co.

Dashboard (AHEAD) OTHER PROJECTS:

Sponsor: MSU Resource Center for Persons with Disabilities

_____ Team 5. Small, Lightweight Speed/Distance

Sensor for Skiers/Snowboarders

NOTE: Students should not rank Teams 3 or 4 at

Sponsor: Air Force Research Laboratory

***__ Team 6. Capacitive Rain Sensor priority 1 or 2 unless they are interested and available to go on the Tanzanian Study Abroad

Sponsor: Hyundai Automotive Technology

Center (Ann Arbor) trip in May, 2010, just after the end of the semester, as described in the earlier email and

***__ Team 7: Ethernet Integrity Analyzer (EIA)

Sponsor: Texas Instruments in class. It is open whether or not you graduate in May, 2010.

***__ Team 8: Roadrailer Air Brake Fault Localization

Sponsor: Norfolk Southern Corporation/Triple

_____ Team 3. Solar-Powered “Connect-on-Demand”

Satellite/Radio Link for Tanzanian Schools

Crown Services

If there are students in the 480 class with whom you would like to be teamed, write their names below (it will also help if they write your name on their preference sheets). Most teams will have 5 members; you do not need to fill in any names below, and

4 persons is the maximum number that will be teamed with you in any case. If you wish:

Possible Team Member ____________________ Possible Team Member ____________________

Possible Team Member ____________________ Possible Team Member ____________________

(Highly optional – use with care): If there are any students with whom you have worked before as a partner, and with whom you do NOT want to be teamed again, indicate their names below:

Former Team Member to Avoid ____________________ Former Team Member to Avoid _____________________

Ranking of Non-Technical Roles on Team (1=most preferred, 5=least preferred):

Management_____ Webmaster______ Document Prep______ Presentation Prep____ Lab Coordinator______

Your preference for type of technical involvement in a project -- rank 1 (highest) to 5 (lowest):

____digital/microprocessor ____embedded systems software/robotic control ____analog circuits/power/sensors

____wireless/network ____Linux systems configuration/sys admin

Check the following courses taken (or concurrent) and skills : ___ECE 313 ___ECE 320 ___ECE 366 ___ECE 405

___ECE 416 ___ECE 420 ___ECE 474 ___ CSE 232 ___ CSE 355 ___ CSE 450 ___ Linux(sys builds) ___JAVA

What is your planned graduation date?

_____Sp’10 _____Su’10 _____ F’10 ________Other (specify)

I cannot guarantee that you will be assigned to work with the team members you designate (if any), nor on the projects you ranked at or near the top, nor in the roles/technical activities you ranked highest. Many of you will pick the same attractive projects as your top ranked ones, and only a few can be assigned to them! I will try to accommodate your preferences as well as

I can, while assuring that all students have a project and that all teams are balanced as well as I can.

Return this form to Prof. Goodman, in person, in mailbox, or electronically, by Monday, January 11, 2010, 5pm, or your participation on a 480 team is in jeopardy.

Download