19558 version 2 Page 1 of 5 Troubleshoot and rectify faults on an advanced gas pressure reducing and metering station Level 4 Credits 30 Purpose People credited with this unit standard are able to: locate and interpret procedures, documentation, and equipment for troubleshooting and rectifying faults on an advanced gas pressure reducing and metering station; prepare site for troubleshooting and rectifying faults on an advanced gas pressure reducing and metering station; troubleshoot and rectify faults on an advanced gas pressure reducing and metering station and ancillary equipment; recommission and test a pressure reducing and metering station and ancillary equipment; reinstate site; and complete reporting and documentation. Subfield Gas Industry Domain Gas Network Operations Status Registered Status date 20 November 2006 Date version published 20 November 2006 Planned review date 31 December 2011 Entry information Prerequisites: Unit 19559, Perform maintenance on an advanced gas pressure reducing and metering station, and Unit 19560, Troubleshoot and rectify faults on a standard gas pressure reducing and metering station; or demonstrate equivalent knowledge and skills. Accreditation Evaluation of documentation and visit by NZQA and industry. Standard setting body (SSB) NZ Motor Industry Training Organisation (Incorporated) (MITO) Accreditation and Moderation Action Plan (AMAP) reference 0114 This AMAP can be accessed at http://www.nzqa.govt.nz/framework/search/index.do. New Zealand Qualifications Authority 2016 19558 version 2 Page 2 of 5 Special notes 1 This unit standard is intended for but is not limited to assessment by simulation, attestation, and work records. The range statements relate to enterprise specific equipment, procedures, and processes. 2 The current version of the following documents must be complied with: Health and Safety in Employment Act 1992; NZS 5258:2003 Gas distribution networks available at http://www.standards.co.nz; NZS 5259:2004 Gas measurement available at http://www.standards.co.nz. 3 All work practices must comply with regulations and codes of practice pertaining to the gas industry. A full list of applicable regulations and codes is available from the NZ Motor Industry Training Organisation (Incorporated) (MITO). 4 Definitions Advanced gas pressure reducing and metering stations include pilot-operated regulators, and active monitor and automatic stream selection configurations. Company procedures means the documented methods for performing work activities and include health and safety, environmental, and quality management requirements. They may refer to manuals, codes of practice, or policy statements. Elements and performance criteria Element 1 Locate and interpret procedures, documentation, and equipment for troubleshooting and rectifying faults on an advanced gas pressure reducing and metering station. Performance criteria 1.1 Company procedures for the troubleshooting and rectifying of faults in advanced pressure reducing and metering stations are located and interpreted in relation to specified job requirements. 1.2 Job instructions are confirmed in accordance with company procedures. Range may include but is not limited to – location, condition, size, position, pressure settings, liaison, authorisation, manufacturer’s information, equipment operating manuals, station operating manuals. 1.3 Potential environmental and safety hazards are identified in accordance with company procedures. 1.4 Equipment and materials for troubleshooting and rectifying faults in an advanced pressure reducing and metering station are identified and described in terms of type and function. Range includes but is not limited to – leak detection, test equipment, spare parts, lubrication. New Zealand Qualifications Authority 2016 19558 version 2 Page 3 of 5 1.5 Equipment is described in terms of potential hazards of incorrect application and operation, and the steps to avoid them are described in accordance with company procedures. 1.6 Resource requirements are identified and sourced in accordance with company procedures. Range plant, tools, materials, documentation, system components, personnel, communication equipment. Element 2 Prepare site for troubleshooting and rectifying faults on an advanced gas pressure reducing and metering station. Performance criteria 2.1 Safety hazards are identified, and isolated, removed, or minimised in accordance with company procedures. Range 2.2 may include – signage, barriers, personal protective equipment, safe access and egress, gas escape, fire, explosion, asphyxiation, other utilities, temporary traffic control, environmental protection, excavations. Equipment and materials for troubleshooting and rectifying faults in an advanced pressure reducing and metering station are prepared, handled, and positioned in accordance with company procedures and manufacturer’s instructions. Element 3 Troubleshoot and rectify faults on an advanced gas pressure reducing and metering station and ancillary equipment. Performance criteria 3.1 Troubleshooting and rectifying of faults on an advanced pressure reducing and metering station comply with manufacturer's requirements and company procedures. Range may include but is not limited to – no gas, high and low pressure, reliefs passing, leakage, seat failure, blocked filter, volume/flow requirements, orifice sizes, hunting, oscillation, settings, freezing. 3.2 Components and component parts are repaired, fitted and adjusted in accordance with manufacturer's specifications and instructions. 3.3 Troubleshooting and rectifying faults comply with company safety procedures. New Zealand Qualifications Authority 2016 19558 version 2 Page 4 of 5 Element 4 Recommission and test a pressure reducing and metering station and ancillary equipment. Performance criteria 4.1 Pressure reducing and metering station is purged and recommissioned where required in accordance with company procedures and site requirements. 4.2 Regulator and ancillary equipment are tested for soundness and integrity in accordance with company procedures and manufacturer's instructions. Range pressure settings, soap test, valves, bypass, gauges, reliefs, flow, settings, regulators. Element 5 Reinstate site. Performance criteria 5.1 Equipment and materials left temporarily on site are stored safely and securely, or arrangements are made for their collection in accordance with company procedures. 5.2 Tools, equipment, and materials are removed from site in accordance with job requirements and company procedures. 5.3 Worksite is reinstated and made safe in accordance with company procedures. Element 6 Complete reporting and documentation. Performance criteria 6.1 Information is communicated to other parties, both internal and external, in accordance with company procedures. Range 6.2 may include but is not limited to – special conditions, completion notice, additional work. Records and documents are completed and processed in accordance with company procedures. Please note Providers must be accredited by the Qualifications Authority, or an inter-institutional body with delegated authority for quality assurance, before they can report credits from assessment against unit standards or deliver courses of study leading to that assessment. New Zealand Qualifications Authority 2016 19558 version 2 Page 5 of 5 Industry Training Organisations must be accredited by the Qualifications Authority before they can register credits from assessment against unit standards. Accredited providers and Industry Training Organisations assessing against unit standards must engage with the moderation system that applies to those standards. Accreditation requirements and an outline of the moderation system that applies to this standard are outlined in the Accreditation and Moderation Action Plan (AMAP). The AMAP also includes useful information about special requirements for organisations wishing to develop education and training programmes, such as minimum qualifications for tutors and assessors, and special resource requirements. Comments on this unit standard Please contact the NZ Motor Industry Training Organisation (Incorporated) (MITO) info@mito.org.nz if you wish to suggest changes to the content of this unit standard. New Zealand Qualifications Authority 2016