A/E Supplemental Instructions

advertisement
A/E Supplemental Instructions
Wright State University Standard Requirements for Public Facility Construction
Supplemental Instruction Number:
Project Number:
Date of Issuance:
Project Name:
Owner:
Address:
To Contractor:
Address:
Contractor For:
Contract Date:
From Architect/Engineer (“A/E”):
Address:
A/E Project Number:
«insert number»
«insert number»
«insert date»
«insert name»
Wright State University
3640 Colonel Glenn Highway
Dayton, Ohio 45435
«insert name»
«insert street address»
«insert city, state zip code»
«insert contractor type»
«insert date of contract»
«insert name»
«insert street address»
«insert city, state zip code»
«insert number»
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance
with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in
accordance with these instructions indicates your acknowledgement that there will be no change in the Contract
Sum or Contract Time.
DESCRIPTION: «insert a written description of the Work»
ATTACHMENTS: «list attached documents that support description»
Page 1 of 2
«insert project number»
«insert project name»
ISSUED BY A/E:
Signature
Printed name and title
Page 2 of 2
Download