Risk Management Manual(2).doc

advertisement

XXX SDN.BHD.

Doc. No.:

TABLE OF CONTENTS

DOCUMENT TITLE

RISK MANAGEMENT MANUAL

Revision: 0 Page: 1 of 21

PAGE

NUMBER

PREFACE

A) Company Profile

B) Scope and Field of Application

C) Field of Application

1. SCOPE

2. DEFINITION

3. HACCP SYSTEM REQUIREMENTS

XXX SDN BHD Organization Chart Appendix I

Assemble RISK MANAGEMENT Team Member Appendix II

XXX Documents & ISO 14971: 2001 Cross References Appendix III

XXX SDN.BHD.

Doc. No.:

PREFACE

A) COMPANY PROFILE

Pls add in your company profile

RISK MANAGEMENT MANUAL

Revision: 0 Page: 2 of 21

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 3 of 21

C) SCOPE AND FIELD OF APPLICATION

This manual describes system requirements for contracts between XXX SDN BHD and her customer, and demonstrates XXX SDN BHD’s capability to control the processes that determine the acceptability of product supplied at the location of specified below :-

General Information

Company : XXX SDN BHD

: Pls add in your company address. Address

Telephone No. :

: Facsimile No.

Website

E-mail

Factory Size

:

:

: 11.16 Acres.

: xxx persons No of Employee

Shift Operation : Not applicable

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 4 of 21

1.

SCOPE

Standard for Certification

ISO 13485 : 2003

Guidance Standard

ISO 14971: 2000

Scope of Registration

Safe processing of product as below from the time of receiving, processing and delivery of finished products. The hazards addressed are biological, environmental, physical, mechanical hazards and etc.

Products Registered:

XXX SDN.BHD.

2.

Doc. No.:

DEFINITION

2.1 Terms and Definition

Terms

RISK MANAGEMENT MANUAL

Revision: 0 Page: 5 of 21

Definition

Harm Physical injury or damage to the health of people, or damage to property or the environment.

Hazard

Hazardous

Situation

Residual Risk

Potential source of harm.

Circumstance in which people, property or the environment are exposed to one or more hazard(s).

Risk remaining after protective measures have been taken.

Risk

Risk Analysis

Combination of the probability of occurrence of harm and the severity of that harm.

Systematic use of available information to identify hazards and to estimate the risk.

Risk Assessment Overall process comprising a risk analysis and risk evaluation.

Risk Control Process through which decisions are reached and protective measures are implemented for reducing risks to, or maintaining risk within, specified levels.

Risk Evaluation Judgment, on the basis of risk analysis, of whether a risk which is acceptable has been achieved in a given context based on the current values of society.

Risk Management Systematic application of management policies, procedures and practices to the tasks of analyzing, evaluating and controlling risk.

Risk Management

File

Set of records and other documents, not necessary contiguous, that are produced by a risk management process.

Safety

Severity

Principle 1

Freedom from unacceptable risk.

Measure of the possible consequences of a hazard.

Carry out Risk Analysis to identify hazard(s) associated with a medical devices

Principle 2

Principle 3

Carry out Risk Evaluation to estimate and evaluate the associated risk.

Carry out Risk Control to control the risks and monitor in the effectiveness of the control.

Compiling the post-production information. Principle 4

Principle 5 Establish documentation concerning all procedures and records appropriate to these principles and their application.

Based on EN ISO 14971: 2000 Annex D

XXX SDN.BHD.

Doc. No.:

2.2 Type of Hazards

Types

Biological hazards

RISK MANAGEMENT MANUAL

Revision: 0 Page: 6 of 21

Environmental hazards

Physical & Mechanical hazards

Others

Example

These include bio-contamination, bio-incompatibility, incorrect formulation

(chemical composition), toxicity, allergenicity, mutagenicity, oncogenicity, teratogenicity, carcinogenicity, re-and/or cross-infection, pyrogenicity, inability to maintain hygienic safety, degradation.

These include electromagnetic fields, susceptibility to electromagnetic interface, emissions of electromagnetic interference, inadequate supply of power, inadequate supply of coolant, storage or operation outside prescribed environmental conditions, incompatibility with other devices with which it is intended to be use, accidental mechanical damage, contamination due to waste products and/ or medical device disposal.

Hazards arising from functional failure, maintenance and ageing and contributory factors. These include erroneous data transfer, lack of, or inadequate specification for maintenance including inadequate specification of post-maintenance functional checks, inadequate maintenance, lack of adequate determination of the end of life of the medical device, loss of electrical/ mechanical integrity, inadequate packaging (contamination and/ or deterioration of the medical device), re-use and/ or improper re-use, deterioration in function

(e.g. gradual occlusion of fluids/ gas path, or change in resistance to flow, electrical conductivity) as a result of repeated use.

Hazards resulting from incorrect output of energy and substances. These include electricity, radiation, volume, pressure, supply of medical gases, and supply of anaesthetic agents.

Hazards related to the use of the medical device and contributory factors. These include inadequate labeling, use by unskilled/ untrained personnel, sharp edges or points etc

Energy hazards. These include electricity, heat, mechanical force, vibration, magnetic fields etc.

Hazards due to inappropriate, inadequate or over-complicated user interface

(man/ machine communication). These include mistakes and judgment errors, complex or confusing control system, ambiguous or unclear device state, insufficient visibility, audibility or tactility etc.

Based on EN ISO 14971: 2000 Annex D

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 7 of 21

3.0 General Requirements for Risk Management

3.1 National or Regional Regulatory Requirements

XXX shall establish, document and maintain a Quality Management System to ensure that all known potential risks within the field of Application of Risk Management to Medical Devices are identified and that all relevant risks are controlled in such a manner that the products of our company do not harm the user

/ consumer. Cross-references of the XXX procedures & ISO 14971 Clauses shall refer to Appendix III.

Where appropriate, the XXX shall comply to relevant national or regional regulatory requirements which applicable to the manufactured medical devices.

3.2 Risk Management Process

The XXX shall establish and maintain a process for identifying hazards associated with medical devices, estimating and evaluating the associated risks, controlling these risks and monitoring the effectiveness of the control. The XXX shall documented the risk management process which include:

(a) Risk Analysis

(b) Risk Evaluation

(c) Risk Control

(d) Post-production Information

The XXX shall also document the new product design/ development process and shall incorporate the appropriate parts of the risk management process.

Related Quality Procedures: -

1.

UGM-P19 Risk Management Process Analysis

3.3 Management Responsibilities

3.3.1 Policy

The top management of our company is committed with regard to identification, evaluation and control of risks related to product safety. The following Risk Management Policy is being established to provide a direction to all employees to achieve our Organisation Risk Management Objective, its also provide a framework for establishing and reviewing Risk Management objectives: -

PLS ADD IN YOUR RISK MANAGEMENT POLICY

In order to achieve the Risk Management Policy, employee at all levels throughout the organization shall

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 8 of 21 declare, implement and maintain the following Risk Management Objectives: -

 PLS ADD IN RISK MANAGEMENT OBJECTIVES

The Risk Management Policy & Objectives are communicated and ensures its being understood within the organization by: a) Displayed it at various strategic area; b) Existing members briefed by their respective Heads on the policy; c) New members are to be briefed during their induction/orientation.

The company’s management shall review the continuing suitability and effectiveness of the Quality

Management System at defined intervals to fulfill the requirement of customers and authorities and to satisfy the company’s stated Risk Management Policy and meet the company’s Risk Management objective. At least once a year the management review shall be conducted to ensure the system is effective and up-to-date.

Related Quality Procedures: -

1. UGM-P05 Management Review

3.4 Qualification of Personnel

3.4.1 Task, Responsibilities & Authorities

The Managing Director is the leader responsible for overall Quality Management System, Risk

Management Policy and Risk Management Objective of XXX Sdn. Bhd. He shall appoint personnel who need the organisational freedom and authority to: a) Initiate action to prevent the occurrence of any non-conformities relating to the product, process and

Quality Management System. b) Identify and record any problems relating to the product, process and Quality Management System. c) Initiate, recommend or provide solutions through designated channels. d) Verify the implementation of solutions. e) Control further processing, delivery of non-conforming product until deficiency or unsatisfactory condition has been corrected.

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 9 of 21

To achieve the above purpose, the top management shall identify resource requirements and provide adequate resources, including the assignment of trained personnel for management, performance of work and verification activities including internal audits.

Respective department Job Descriptions have been identified and communicated to relevant employees to facilitate implementation of the Quality Management System. The Company Organisation Chart is set out on Appendix I.

Related Quality Procedures: -

1. UGM-Jxx Relevant departmental Job Description

3.4.2 Risk Management Team

XXX has set up the Risk Management Team to develop, establish, maintain and review the Quality

Management System. The Risk Management Team members’ working experience and qualification are defined in Appendix II.

The Managing Director has appointed the Technical Manager as Quality Management Representative, who, irrespective of other responsibilities, shall have the defined authority for: a) Ensuring that a Quality Management System is established, implemented and maintained in accordance with Quality Management System. b) Reporting on the performance of Quality Management System to the management for review and as a basis for improvement of the Quality Management System. c) Liasing with external parties on matters relating to Quality Management System.

3.5 Risk Management Plan

XXX shall prepare a risk management plan in accordance with the risk management process for the particular medical device or accessory being considered. The risk management plan shall be part of the risk management file.

This plan shall include the following: a) The scope of the plan, identifying and describing the medical device and the life cycle phases for which the plan is applicable; b) A verification plan; c) Allocation of responsibilities; d) Requirements for review of risk management activities; and e) Criteria for risk acceptability

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 10 of 21

XXX shall maintain the record of the plan changes during the life cycle of the medical device in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

3.6 Risk Management File

XXX shall record and maintain the result of all risk management activities in the risk management file for the particular medical device or accessory being considered.

Related Quality Procedures: -

1. UGM-P02 Control of Quality Record

4.0

Risk Analysis

4.1

Risk Analysis Procedure

XXX shall maintain the record of the risk analysis record in the risk management file.

The conduct and result of the risk analysis shall include at least the following: a) A description and identification of the medical device or accessory that was analysed; b) Identification of the person(s) and organization which carried out the risk analysis; c) Date of the analysis

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

4.2

Intended Use/ Intended Purpose and Identification of Characteristic Related to the Safety of the Medical

Device

XXX shall describe the intended use/ intended purpose and any reasonably foreseeable misuse for the particular medical device or accessory being considered. XXX shall list those entire qualitative and quantitative characteristics that could affect the safety of the medical device and, where appropriate, their defined limits.

4.2.1 Product Information

A complete description of our product should be made to assist in the identification of all possible risks associated with the product. The following should be taken into consideration: - a) Information on raw materials.

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 11 of 21

E.g. Delivery method, packaging & storage conditions, preparation before use and etc. b) Information on each product / product category.

E.g. Raw materials used, sensitive chemical identified, storage and distribution conditions.

Potential users and consumers shall be identified for each product / product category. Consumer groups known to be especially vulnerable shall be indicated. The intended use with regard to storage, preparation and serving. To ensure optimum consumer safety, below conditions shall be taken into consideration: - a) Product storage, preparation and serving where applicable. b) Distinctive product labelling, if any. c) Product with specific requirement. d) Product shelf life and etc.

Related Quality Procedures: -

1.

- Respective Product Description

2.

- Respective Raw Material &Packaging material Profile

4.2.2 Process Information

XXX product flow diagrams shall be prepared for all products / product categories covered by the scope of the Quality Management System. The Risk Management Team shall periodically (at least once annually) verify the product flow diagram in order to timely identify, document the changes/modifications of the process and to be able to assess the risks for the safety in time.

The flow diagram shall include the following: - a)

The sequence of all steps in the manufacturing process including critical buffer and interim storage’s, transport pipes, distribution valves and etc. b) Where raw materials and intermediate product (input) join the flow (including subcontracted work). c) Where loops for reworking and recycling take place. d) Where intermediate products, by-products and waste (output) are removed where necessary e) Provisions for cleansing and disinfections of machines, equipment and tools. f) Provisions with start-up, shutdown, emergency, stops and etc.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

2. UGM-P11 Product Realization and Production Provision Control

XXX shall maintain the records in the risk management file.

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 12 of 21

4.3

Identification of Known or Foreseeable Hazards

XXX shall compile a list of known or foreseeable hazards associated with the medical device in both normal and fault conditions. XXX shall also identify the previously recognized hazards.

XXX shall maintain and record the list and the foreseeable sequences of events may result in a hazardous situation in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

4.4

Estimation of the Risk (s) for each hazard

XXX shall use the available information and data to estimate the risk (s) in both normal and fault conditions for each identified hazard. A listing of the possible consequences for the hazards, which the probability of the occurrence of harm cannot be estimated, shall be prepared.

XXX shall record the estimation of the risk in the risk management file.

XXX shall record any system used for qualitative or quantitative categorization of probability estimates or severity level in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

5 Risk Evaluation

XXX shall using the criteria defined in the risk management plan to estimate the each identified hazard.

XXX shall maintain and record the results of this risk evaluation in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

6 Risk Control

6.1 Risk Reduction

When risk reduction is required, XXX shall follows the process specified in 6.2 to 6.7 to control the risk (s) so that the residual risk (s) associated with each hazard is judged acceptable.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

XXX SDN.BHD.

Doc. No.:

2.

RISK MANAGEMENT MANUAL

Revision: 0 Page: 13 of 21

UGM-P15 Monitoring and Measurement of Product and Non-conformity Control

6.2 Option Analysis

XXX shall identify risk control measure(s) that are appropriate for reducing the risk(s) to an acceptable level. Risk control shall consist of an integrated approach in which the XXX shall use one or more of the following in the priority order listed: a) Inherent safety by design; b) Protective measures in the medical device itself or in the manufacturing process; c) Information for safety

XXX shall maintain and record the selected risk control measures in the risk management file.

XXX shall conduct a risk/ benefit analysis of the residual risk for the further risk reduction had determined impractical during option analysis. Otherwise, XXX shall proceed to implement the selected risk control measures.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

2. UGM-P15 Monitoring and Measurement of Product and Non-conformity Control

6.3 Implementation of Risk Control Measure(s)

XXX shall implement the risk control measure(s) selected in Option Analysis and maintain the relevant record in the risk management file.

XXX shall verify the effectiveness of the risk control measures and maintain the record of the result of the verification in the risk management file.

XXX shall also verify the implementation of the risk control measure and maintain the verification results in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

2. UGM-P15 Monitoring and Measurement of Product and Non-conformity Control

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 14 of 21

6.4 Residual Risk Evaluation

XXX shall using the criteria defined in the risk management plan to evaluate any residual risk that remains after the risk control measure(s). XXX shall apply further risk control measures if the residual risk does not meet the criteria.

XXX shall document all relevant information necessary to explain the residual risk(s) if the residual risk is judged acceptable.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

6.5 Risk / Benefit Analysis

XXX shall gather the and review data and literature on the medical benefits of the intended use/ intended purpose to determine whether the residual risk had been outweigh, especially if the residual risk is judged unacceptable by using the criteria established in the risk management plan and further risk control is impractical. If this evidence does not support the conclusion that the medical benefits outweigh the residual risk, then the risk shall remain unacceptable. If the medical benefits outweigh the residual risk, XXX shall generate all the relevant hazards.

XXX shall maintain all the relevant information necessary to explain the residual risk and the record of the results of this evaluation in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

6.6 Other Generated Hazards

XXX shall review periodically on the risk control measures to identify if other hazards are introduced.

XXX shall assess the associated risk(s) if any new hazards are introduced by any risk control measures. XXX shall maintain and record the result of this review in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

2.

3.

4.

UGM-P05

UGM-P06

UGM-P08

Management Review

Internal Audit

Continual Improvement

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 15 of 21

6.7 Completeness of Risk Evaluation

XXX shall assure that the risk(s) from all identified hazards have been evaluated. XXX shall maintain and record the result of this assessment in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

2. UGM-P05 Management Review

7 Overall Residual Risk Evaluation

XXX shall decide if the overall residual risk posed by the medical device is acceptable using the criteria defined in the risk management plan after all risk control measure have been implemented and verified.

XXX shall gather the and review data and literature on the medical benefits of the intended use/ intended purpose to determine whether the residual risk had been outweigh. If this evidence does not support the conclusion that the medical benefits outweigh the residual risk, then the risk shall remain unacceptable.

XXX shall maintain and record the results of the overall residual risk evaluation in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

2. UGM-P05 Management Review

8 Risk Management Report

XXX shall maintain the record of results of the risk management process in a risk management report. The risk management report shall provide traceability for each hazard to the risk analysis, the risk evaluation, the implementation and verification of the risk control measures, and the assessment that the residual risk (s) is acceptable. The risk management report shall form a part of the risk management file.

9 Post- Production Information

XXX shall establish and maintain a systematic procedure to review information gained about the medical device or similar devices in the post-production phase. XXX shall evaluate the information for possible relevance to safety, especially the following: a) If previous unrecognised hazards are present; b) If the estimated risk(s) arising from a hazard is no longer acceptable; c) If the original assessment is otherwise invalidated.

If any of the above conditions is satisfied, the results of the evaluation shall be fed back as an input to the risk management process

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 16 of 21

XXX shall carry out a periodically for the risk management process. If there is a potential that the residual risk(s) or its acceptability has changed, the impact on previously implemented risk control measures shall be evaluated.

XXX shall maintain and record the result of this evaluation in the risk management file.

Related Quality Procedures: -

1. UGM-P19 Risk Management Process Analysis

2.

3.

4.

UGM-P10 Customer Requirement, Communication and Satisfaction

UGM-P05 Management Review

UGM-P06 Internal Quality Audit

5. UGM-P08 Continual Improvement

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 17 of 21

XXX SDN BHD ORGANIZATION CHART

XXX SDN.BHD.

Doc. No.:

#

1

Name

RISK MANAGEMENT MANUAL

Revision: 0 Page: 19 of 21

ASSEMBLE RISK MANAGEMENT TEAM MEMBER

Department Responsibility Risk Management

Job Function

Academic Qualification

XXX SDN.BHD.

Doc. No.:

RISK MANAGEMENT MANUAL

Revision: 0 Page: 20 of 21

XXX Documents & ISO14971: 2000 Cross-References

ISO

14971

Clause

Ref.

ISO 14971:2000 System

Element

Related

Document No.

Document Title

3 General Requirements for

Risk Management

UGM-RM

UGM-QM

3.1 UGM-RM

3.2

National or Regional

Regulatory Requirements

Risk Management Process

3.3

3.4

3.5

Management Responsibilities

Qualification of Personnel

Risk Management Plan

UGM-P19

UGM-RM

UGM-QM

UGM-RM

UGM-P05

UGM-QM

UGM-RM

UGM-Jxx

UGM-RM

UGM-P19

3.6

4

4.1

4.2

Risk Management File

Risk Analysis

Risk Analysis Procedure

UGM-RM

UGM-P19

UGM-RM

UGM-P19

UGM-RM

UGM-P19

-

-

Respective Product Description

Respective Raw Material &Packaging material

Profile

4.3

4.4

5

6

6.1

6.2

Intended Use/ Intended

Purpose and identification of

Characteristics Related to the

Safety of the Medical Device

Identification of Known or

Foreseeable Hazards

Estimation of the Risk (s) for each Hazard

Risk Evaluation

Risk Control

Risk Reduction

Option Analysis

UGM-P19

UGM-P19

UGM-P19

UGM-P19

UGM-P19

UGM-P15

UGM-P19

UGM-P15

XXX SDN.BHD.

Doc. No.:

6.3 Implementation of Risk

Control Measure(s)

6.4

6.5

6.6

Residual Risk Evaluation

Risk/ Benefit Analysis

Other Generated Hazards

6.7

7

8

9

Completeness of Risk

Evaluation

Overall Residual Risk

Evaluation

Risk Management Report

Post-Production Information

RISK MANAGEMENT MANUAL

Revision: 0 Page: 21 of 21

UGM-P19

UGM-P15

UGM-P19

UGM-P19

UGM-P05

UGM-P06

UGM-P08

UGM-P19

UGM-P19

UGM-P05

UGM-P19

UGM-P05

UGM-RM

UGM-P19

UGM-P10

UGM-P05

UGM-P06

UGM-P08

Download
Study collections