Office Building-G EASTERN UNITED STATES Carl Hubben – Structural Option Ae senior thesis - 2011 Outline Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Office Building-G Eastern United States Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Project Information Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Project Information Owner Restrictions: Occupancy Type: Square Footage: Project Cost: Number of Stories: Project details cannot be disclosed Mixed use office 649,641 sf $70,000,000 14 levels of office space 4 levels of parking below grade Office Building-G Eastern United States Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure • Foundation • Superstructure Project Goals Structural Depth Architectural Breadth Conclusions Existing Structure Carl Hubben Structural Option Office Building-G Eastern United States Foundation Project Information Key Points Existing Structure • Foundation • Superstructure Spread Footings • Up to 3100 axial kips Parking garage and superstructure Project Goals Structural Depth Architectural Breadth Conclusions Perimeter Foundation Wall Figure 8 Carl Hubben Structural Option Project Information Existing Structure • Foundation • Superstructure Project Goals Structural Depth Architectural Breadth Conclusions Office Building-G Eastern United States Superstructure Existing Core Key Points • Cast in place reinforced concrete • Post-tensioned girders with 7” thick one-way slab • Structural depth of 18” • Exposed round and rectangular columns • 10” thick shear wall core Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Project Goals Carl Hubben Structural Option Project Goals Project Information Existing Structure • Column Free Space Project Goals • Remove Shear Wall Core • Maintain Floor to Floor Height • Determine Architectural Impacts Structural Depth Architectural Breadth Conclusions Office Building-G Eastern United States Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Structural Depth Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Loads Wind: Seismic: Flexible Structure Reduced Dead Load New Lateral System Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Office Building-G Eastern United States Floor System Floor Slab Composite metal decking • 4 ½” total thickness Framing Plan Composite and Composite Castellated Beams Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Office Building-G Eastern United States Floor System Castellated Beam Design Spans range between 45’ – 65’ Vierendeel Bending • Primary and secondary forces Primary Forces Secondary Forces Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Floor System Existing Design Redesign Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Office Building-G Eastern United States Columns General 12 Lateral Columns 23 Gravity Columns Located on the façade or around vertical transportation ~40’ between columns on exterior W14 Sizes Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Office Building-G Eastern United States Lateral System North Elevation General Concentrically Braced 8 Chevron Frames Span 2 floors V and inverted V design Symmetrical Design Carl Hubben Structural Option Office Building-G Eastern United States Lateral System Yellow Brace Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Green Brace Design HSS14X14 Braces: 1/2 5/16 Load Combination: 1.2D + 0.5L + 0.5Lr + 1.0E Beam Size: W27X161 3/8 5/16 1/2 3/8 1/2 5/16 5/8 1/2 1/2 1/2 5/8 5/8 Overstrength and redundancy factor: Ωo = 2.0, ρ = 1.0 Beam Size: W27X94 Top Floor Deflection: H/400, 5.2” < 5.3” Inherent Torsion: CM-CR = 6.7’ Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth • Loads • Floor System • Columns • Lateral System • Connections Architectural Breadth Conclusions Office Building-G Eastern United States Connections Limit States Brace Limit States: • Tension Yielding • Tension Rupture Brace/Gusset Limit States: • Weld Rupture • Base Metal Strength • Brace • Gusset Gusset Limit States: • Tension Yielding • Tension Rupture • Local Buckling Gusset/Beam Limit States: • Weld Rupture • Base Metal Strength • Gusset • Beam Beam Limit States: • Web Tension Yielding • Web Crippling • Web Buckling Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Architectural Breadth Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Office Building-G Eastern United States Architecture Breadth Floor Section Plan View Exterior Office Building-G Eastern United States Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Conclusions Carl Hubben Structural Option Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Office Building-G Eastern United States Conclusions Goals: Disadvantages: • Column Free Space More Coordination • Remove Shear Wall Core Increased Cost • Maintain Floor to Floor Height Foundation Impacts • Determine Architectural Impacts Carl Hubben Structural Option Acknowledgements Turner Construction Company: Project Information Existing Structure Project Goals Structural Depth Architectural Breadth Conclusions Carlos Flores Ryan-Biggs Associates: Chris Latreille The Pennsylvania State University: Dr. Ali Memari Dr. Linda Hanagan Dr. Louis Geschwindner Robert Holland Kevin Parfitt I would also like to give a special thanks to my friends and family for their help and support throughout the year. Office Building-G Eastern United States Carl Hubben Structural Option Questions Office Building-G Eastern United States Yellow Brace Green Brace HSS14X14 Braces: Beam Size: W27X161 1/2 5/16 3/8 5/16 1/2 3/8 1/2 5/16 5/8 1/2 1/2 1/2 5/8 5/8 Beam Size: W27X94 Brace Limit States: Tension Yielding Tension Rupture Brace/Gusset Limit States: Weld Rupture Base Metal Strength Brace Gusset Gusset Limit States Tension Yielding Tension Rupture Local Buckling Gusset/Beam Limit States Weld Rupture Base Metal Strength Gusset Beam Beam Web Tension Yielding Web Crippling Web Buckling Shear Yielding Beam/End Plate Weld Rupture Base Metal Strength Beam End Plate End Plate Limit States Gross Shear Net Shear Block Shear Angle Limit States Prying Effects Shear Yielding Shear Rupture Block Shear Bolt Shear Tension Bearing and Tear Out Gusset/Plate Weld Rupture Base Metal Strength Gusset Plate Plate Plate bending Plate/Column Weld Rupture Base Metal Strength Plate Column Column Local Flange Yielding Local Flange Bending Local Flange Crippling