Art 328 Watercolor - Schedule Fall 2015 The following schedule is a preliminary schedule for the term. Always bring paint supplies unless otherwise noted. Yellow = due date Green = reading assignment quiz Blue = homework Blue Text = Lecture Date Activity Paper Purpose __________________________________________________________________________________________________________ 1) 1/29 • Review syllabus and supplies Introduction • PP - on watercolor • Due - 328B Students Only - Project form, bring 10 examples of your work 328B – proposals __________________________________________________________________________________________________________ 2) 2/5 • First day to paint in class – have supplies • Lecture - C Theory • Demo and paint - C wheel with primary, secondary, tertiary Global C mixing, use 3 properties of color Global C mixing and control of color Lunch • How to mix black – demo and practice • Grey scale of black and of each color from tube • Secondary C mixing, 1 p each – O, P, G • PP - World of Shape • Homework – finish all work from today drawing for World of Shape on Arches __________________________________________________________________________________________________________ 3) 2/12 • Quiz - “Day 3 World of Shape” textbook p 32 – 35 • Demo - Complimentary C mixing – R G, B O, Y P • Intensity chart - prim & second c + H20, + blk, + comp c • Jewel c with neutral grey around it • Show me your drawing for world of shape Global 3 properties of c, properties of pt Lunch • Paint on world of shape in class Arches Shapes, scale, do not adhere to local c, let it become abstract comp, intensity vary hue and intensity abstraction, c have full value range 0% – 100% pattern c by repeating it throughout comp • PP - Texture • Homework – finish all work from today Bring supplies for Texture, boards and materials __________________________________________________________________________________________________________ 4) 2/19 • Due - World of Shape • Quiz - “Day 10 Texture” textbook p 72 – 79 • Texture, have all texture supplies, see syllabus Lunch • Texture, have all texture supplies, see syllabus • PP - Washes • Homework – finish all work from today Bring images for wash painting Boards texture tech __________________________________________________________________________________________________________ 5) 2/26 • Due - Texture Boards • Quiz - “Day 6 Washes” textbook p 50 – 55 • Demo - 8 washes (2 per page) Flat wash – wet on dry, slant Flat wash – wet on wet, clear H2O first Graded wash dark to light – wet on dry, slant Graded wash dark to light – wet on wet, clear H2O first Graded wash color to color – wet on dry, 2 c Graded wash color to color – wet on wet, clear H2O first, 2 c Graded wash color to color – wet on wet or dry pt flat wash 1st, let dry, pt grade wash on top w 2nd c Any one of your choice Arches (4) c mixing, wash tech. Lunch • Paint over a wash, subject – use objects or photo Arches apply wash, • PP - Wet-in-wet see shift bg • PP - Gouache • Homework – finish all work from today Bring objects and light for still life next class and images of master works __________________________________________________________________________________________________________ 6) 3/4 • Due – Wash Painting • Due – Wash practice pieces (eight) • Quiz - “Day 7 Wet-in-wet” textbook p 56 – 67 • Quiz - “Gouache” textbook p 116 - 121 • Wet in Wet - Paint (2 per p) of the following same still life Direct wet in wet Wet in wet with pencil line Wet in wet with ink line Wet in wet with shapes, float clear H20 Arches (2) wet in wet techniques Lunch • Gouache painting influenced by master works Arches gouache • Lecture – Still life setups • PP – Color Plans • Homework – finish all work from today Bring objects and light for still life next class, warm and cool __________________________________________________________________________________________________________ 7) 3/11 • Due – Wet-in-wet Painting • Due –Gouache Painting • Quiz - “Day 4 Color Plans” textbook p 36 – 43 • Four color plans in Global book • Warm color plan still life w light source, pt w full palette Global Arches hue shift, c plan, c mixing Lunch • Cool color plan still life w light source, pt w full palette Arches hue shift, c plan, • PP - Rendering c mixing • Homework – finish all work from today Bring natural organic object for rendering __________________________________________________________________________________________________________ 8) 3/18 • Due – Warm Color Plan Paintings • Due – Cool Color Plan Paintings • 328B Students Only – Midterm review, bring all work done to date • Enrich the shadows, light and shadow patterns • Demo - B&W sphere w light on it (7 elements of light and shade) • pt geometric solids with enriched shadows & reflect lights use sphere, cube, cylinder &/or cone Object Shadow Reflected Lights 1. white cool warm 2. warm cool warm 3. cool cool warm 4. warm warm cool 5. cool warm cool 6. your choice of a mixture we have not yet done Note: p 46 in Steps to Success in Watercolor by Swenson Global c variation, Shadow & light patterns Lunch • Rendering Arches blending tech, • Demo - blending = soft edges (wet in wet, blot, blow dry layering, washes or watch it, glaze c/layer); thin layers = luminous; use small brush for details; think in veils, frisquet or save whites by painting around them • PP – Skin Tones • PP – Self Portrait • Homework – finish all work from today Bring four photos of heads w different skin tones and a mirror __________________________________________________________________________________________________________ 3/25 • Spring Break, no class __________________________________________________________________________________________________________ Brk) 9) 4/1 • Due - Rendering Painting • Quiz - “2nd Half of bk, Day 4 Self Portrait” textbook p156 – 161 • Demo - skin tone practice, 4 eggs/heads Global skin tone, c layering, washes Lunch • Self Portrait looking in a mirror, no working from photos Arches observational • PP – Fortune Cookie ptg, head study, • Homework – finish all work from today Prepare board for Fortune Cookie project __________________________________________________________________________________________________________ 10) 4/8 • Due - Self Portrait • Fortune cookie project and thumbnails Global composition Lunch • Painting - 7” x 20” with 1” boarder taped off all around, leaving Board concept 5” x 18” surface to paint – Fortune Cookie put it all tog. • Homework – finish all work from today __________________________________________________________________________________________________________ 11) 4/15 • Due - Fortune Cookie Painting • PP – What is abstraction • Abstraction thumbnails for abstract ptg. noted below Lunch Global composition • Abstraction painting Arches c as concept Choose from one of the following titles to paint an abstraction formal elements Fall, Winter, Thunder Storm, Swing Music, Me & the Moon, Cows in Pasture, Fog Horns, Seagull Motif • PP – Plein Air and Repoussoir, supplies and protocol • Homework – finish all work from today Bring all plein air supplies for next week Review Final Project information and begin researching and writing _______________________________________________________________________________________________________ 12) 4/22 • Quiz – “Day 13 Landscape Components” textbook p 90 - 95 • Quiz – “Day 12 Three Zones of Landscape” textbook p 84 - 89 • Botanical Gardens – practice Landscape Components and thumbnails Global technique Lunch • Botanical Gardens - Paint a Repoussoir composition Arches composition • Homework – finish all work from today put it all tog. Bring in ideas, materials and reference for final project, be ready to draw Continue research and writing for Final Project __________________________________________________________________________________________________________ 13) 4/29 • Due - Abstraction • Due – Plein Air Repoussoir Painting • Sketches and thumbnails for Final Project Global composition Lunch • Begin work on Final Project Arches or show me all • Homework – work on Final Project Board you can do __________________________________________________________________________________________________________ 14) 5/6 • Work on Final Project Arches or Board Lunch • Work on Final Project • PP – Careers in the Arts • Homework – work on Final Project Color copy any good thumbnails for Final from Global __________________________________________________________________________________________________________ 15) 5/13 • Due – Global Book (make sure you copied Final Project comps) • Work on Final Project Arches or Board Lunch • Work on Final Project • Homework – Finish Final Project __________________________________________________________________________________________________________ • 328A Due – Final Project • 328B Due – Final Portfolio bring in all the work you did this term __________________________________________________________________________________________________________ F) 5/20 8 – 10 a.m.