Massachusetts Department of Elementary and Secondary Education 350 Main Street, Malden, Massachusetts 02148-5023 Telephone: (781) 338-3700 TTY: N.E.T. Relay 1-800-439-2370 February 7, 2007 Andrew Pollock Executive Director New Directions School Cutchins Programs for Children and Families 78 Pomeroy Terrace Northampton, MA 01060 Re: Onsite Follow-up Monitoring Report: Program Review Corrective Action Plan Verification and Mid-cycle Review Dear Mr. Pollock: Enclosed is the Department's Program Review Follow-up Monitoring Report together with findings regarding your private school’s Mid-Cycle Program Review. This report contains the Department's findings based on the onsite activities conducted in your school to verify the implementation status and effectiveness of corrective steps taken in response to your Program Review Report issued on July 14, 2003. This report also includes a report on the status of implementation for new state or federal special education requirements enacted since your school’s last Program Review. While the Department of Education found certain noncompliance issues to be resolved, others were partially corrected, not addressed at all and/or new issues were identified by the Department’s onsite team. Therefore, the Department is issuing a “Provisional Approval” status effective from the date of this letter and indicated on your approval certificate. Your “Provisional Approval” will expire on (DATE). The reasons for the “Provisional Approval” are clearly indicated on the attached Corrective Action Plan Implementation Checklist. In areas where the private school has failed to implement fully its approved Corrective Action Plan, the Department views these findings to be serious. As the Department previously informed you, in cases where a private school fails to fully and effectively implement a Corrective Action Plan which was proposed by your school and approved by the Department, the Department must then prepare a Corrective Action Plan for the New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Page 1 of 2 school which must be implemented without further delay. You will find these requirements for corrective action and further progress reporting included in the attached report together with any steps that must be taken by the school to fully implement new special education requirements. Please provide the Department with your written assurance that the Department's requirements for corrective action will be implemented by your private school within the timelines specified. Your statement of assurance must be submitted to the Department's Onsite Chairperson by February 26, 2007. Your staff's cooperation throughout these follow-up monitoring activities is appreciated. Should you require additional clarification of information included in our report, please do not hesitate to contact the Onsite Team Chairperson at 413- 858-4591. Sincerely, Sandra K. Hanig, Educational Specialist Program Quality Assurance Services Darlene Lynch, Director Program Quality Assurance Services c: David P. Driscoll, Commissioner of Elementary and Secondary Education Benjamin Barnes, Chairperson, Board of Directors Encl.: Follow-up Monitoring Report Provisional Private School Approval Certificate, Expiration Date: July 25, 2007 2 MASSACHUSETTS DEPARTMENT OF EDUCATION PRIVATE SCHOOL MID-CYCLE PROGRAM REVIEW Cutchins Programs for Children and Families New Directions Day School ONSITE VERIFICATION OF CORRECTIVE ACTION PLAN IMPLEMENTATION AND/OR IDENTIFICATION OF ADDITIONAL FINDINGS REQUIRING CORRECTIVE ACTION Action Plan Submitted on July 14, 2003 Progress Reports Submitted on November 6, 2003 Onsite Visit Conducted on July 18 & 19, 2006 Date of this Report February 7, 2007 Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance 2.2 Approvals, Licenses, Certificates of Inspection 28.09 (2)(b)4-5 28.09(5) 28.09(6) 18.04(1) 2.3 OCCS Licensure (Not Applicable Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that this criterion continues to be fully implemented. Not Applicable New Directions School is a Day Program. New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Page 1 of 41 Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting to Day Schools) 3.1 Policies and Procedures Manuals Documentation review 28.09(11)(b) (formerly 3.1, 3.2, 3.3) The concern at the time of the 2003 Program Review was that the school had not consistently notified parents of enrolled students in writing of their right to review the school’s policies and procedures. During the July 2006 Mid-cycle Review, the Department found that the letter notifying parents of their right to request a copy of policies and procedures states that admissions policies and procedures are available to parents, but does not indicate that other special education policies and procedures in the school’s Policies and Procedures Manual are available for review at any time. New Directions School’s Policies and Procedures Manual is not clearly labeled. 2 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Copy of letter sent to parents informing them of their right to review the Policy and Procedures Manual Statement of assurance that the Policies and Procedures Manual is clearly labeled List of locations where Policy and Procedure Manual is available for public view Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 3.2 Health Care Manual 18.05 (9)(d) Documentation review (formerly 3.1, 3.2, 3.3) The concern at the time of the 2003 Program Review was that the school had not consistently notified parents of enrolled students in writing of their right to request copies of the school’s policies and procedures. See comment under 3.1 regarding notification letter to parents of right to review all policies and procedures, including health care policies and procedures. Submit the following documents to the Department of Education by April 2, 2007: Copy of letter sent to parents informing them of their right to review the Health Care Manual at any time Statement of assurance that the Health Care Manual is clearly labeled List of locations where Health Care Manual is available for public view New Directions School’s Health Care Manual is not clearly labeled. 4.4 Advanced Notice of Program/ Facility Change 28.09(5)(c) 4.5 Immediate Notification Documentation review The Department found this criterion implemented at the time of the 2003 Program Review. During the July 2006 Mid-cycle Review, the Department found that the school has a written policy on advanced notice of program or facility change that includes all required elements. Documentation review The concern at the time of the 2003 Program Review was that the school had not notified the 3 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 18.03(10) 18.05(7) 28.09(12) 5.1 Student Admissions 28.09(11) Documentation review and interview 18.05 (1) and (2) Department of a student injury, resulting from a restraint, which required medical attention. A review of the school’s policy on immediate notification of critical incidents does not indicate that the school will also notify other state agencies if applicable and parents or guardian. A review of incident reports submitted to the Department of Education indicates that these reports do not always document that the school notified the sending public school district of the incident. Incident reports submitted to the DOE will indicate that the public school was notified of each incident. The concern at the time of the 2003 Program Review was that the school’s admissions policy did not included information on how copies of the school’s policies and procedures are distributed to students, parents and public school districts. Submit the following documents to the Department of Education by April 2, 2007: Revised admissions policy that clearly states the role of the private school when it believes an IEP Team meeting may need to be held. A review of the school’s admissions policy during the July 2006 Mid-cycle review includes a statement that seems to imply that the private special 4 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Revised policy on immediate notification of critical incidents Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting education school rather than the sending school district is organizing IEP Team meetings, as required. Interview indicates that the private special education school understands its responsibility to notify the public school if staff members believe an IEP Team meeting may need to be called by the sending school district. 5.2 Policies and Procedures for Coordination/ Collaboration with Public School Districts & Content requirements policies/ procedures for Coordination/ Collaboration with Public Student record review In addition, the school’s policy does not state that students, if appropriate, and public school districts will be notified of their right to review the school’s Policies and Procedures Manual. The concern at the time of the 2003 Program Review was that the school had not executed contracts with placing school districts that included mandated components. Student record review at the time of the July 2006 Mid-cycle Review indicates that contracts between New Directions and sending school districts do not contain all information the Department requires. See 603 5 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Copy of 5 contracts between New Directions School and 5 different sending school districts Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting School Districts 28.06(2-3) 28.09(9)(c)&(d) 28.09(2)(b)7 Federal Regulations: 300.349 and 300.400-.401 CMR 28.09 for details on required elements. (Formerly 5.3 and 5.4) 6.1 Daily Instructional Hours 603 C.M.R. 27.00 Review of documentation, student record and observation The Department found this criterion implemented at the time of the 2003 Program Review. Review of the block schedule at the time of the July 2006 Midcycle review indicates that the class schedule does not contain sufficient detail outlining which subject is taught at each hour of the day. Interview and observation indicate that the schedule of class offerings in the summer months is quite different from the academic year schedule and does not contain adequate instructional hours in core subjects in order to enable students to meet IEP goals. 6 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Block schedule for 20062007 academic year Block schedule for summer 2007 Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Many students have a “vocational” or work-study program in summer months but review of student records did not document the need for a vocational course of study. The concern based on observation at the time of the July 2006 program review is that students were not arriving to school on time. See comment under criterion 6.2 regarding documenting the need for work-study on the IEP with specific vocational goals and objectives. Observations during the July 2006 Mid-cycle Review was that work-study opportunities in the summer are not well structured with concrete goals and students who have work study do not receive instruction in all academic subjects. 6.1A Physical Education and Health Curriculum Documentation review Compliance with this regulation was not monitored at the time of the 2003 Program Review. During the July 2006 Mid-cycle 7 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Health curriculum Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting review, the Department found that New Directions School has no written health curriculum. 6.2 School-to-work (Instructional hours) 603 CMR 27.02, 27.04 6.3 Kindergarten (Instructional hours) 603 CMR 27.03(5) 6.4 School Days per Year 28.09(9) Documentation review Compliance with this regulation was not monitored at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that New Directions School has not developed welldefined guidelines detailing supervision of students enrolled in school-to-work classes or how work study opportunities are structured to meet specific individual IEP goals and objectives. Submit the following documents to the Department of Education by April 2, 2007: List of students who participate in vocational programs with name of the type of vocational program Copy of IEP vocational goal and service delivery grid for 5 students who participate in a vocational program Curriculum for each vocational area New Directions School does not serve young students in Kindergarten. Not Applicable Documentation review This criterion was implemented at the time of the 2003 Program Review. 8 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Copy of revised school Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting (Formerly 6.2) Documentation review at the time of the July 2006 Mid-cycle review indicates that the school calendar does not include 5 additional emergency days. 6.5 Early Release of High School Seniors Documentation review Compliance with this regulation was not monitored at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that this criterion is fully implemented. 603 CMR 27.05 7.1 Curriculum 28.09(9)(b) (formerly 1.3) calendar that indicates 5 additional days class will be held in the case that some class days need to be canceled due to emergency. Documentation review The Department found this criterion implemented at the time of the 2003 Program Review. A review of New Direction’s curriculum during the July 2006 Mid-cycle review indicates that the school has not developed a comprehensive curriculum for all subjects at each grade level to be utilized by New Directions School. 9 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Curriculum for 6th grade mathematics, Curriculum for 7th grade English language arts, Curriculum for 8th grade science and Curriculum for 9th grade social studies as representative examples of a fully developed curriculum. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 7.3 State/District Wide Assessments 28.09(9)(d) 8.3 Implementation – Supplementary Aids/Services Documentation and student record review The Department found this criterion to be implemented at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that this criterion continues to be fully implemented. Documentation review 34 CFR 300.28 The concern at the time of the 2003 Program Review was that the school did not provide documentation to indicate the kinds of supplementary aids and services that are available for students in the program. During the July 2006 Mid-cycle review, the school submitted a list of supplementary aids and services it provides to students. It also submitted a copy of the “Assistive Technology Guide for Massachusetts Schools” that describes types of assistive technology tools any school could make available to students. 8.5 Current IEP & Student Roster 28.09 Documentation and student record review The concern at the time of the 2003 Program Review was that the school had not documented its efforts to work with sending public school districts to obtain 10 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: List of IEP pages and related documents that Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting (Formerly 8.4) current, signed IEPs. 8.6 Education Case Manager 28.09 Documentation and student record review (Formerly 8.5) Review of the student records at the time of the July 2006 Midcycle indicate that New Directions School does not have a complete IEP on file for each student and not all IEPs are signed, but the school’s efforts to document attempts to obtain signed IEPs were documented in student records. The concern at the time of the 2003 Program Review was that the school had assigned an educational case manager to each student, but staff members did not always know who that individual was. Submit the following documents to the Department of Education by April 2, 2007: Student roster that indicates the case manager assigned to each student During the July 2006 Mid-cycle review the school submitted a 11 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Cutchins expects to have on file for each student. Report on your review of student files. Submit a copy of the student roster that indicates the dates of each IEP and whether is has been signed by the parent and sending district. For students that do not have a current signed IEP on file, submit documentation of your repeated efforts to contact the sending district to obtain a current signed IEP. This documentation may include copies of letters, emails and/or phone logs. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting blank copy of an “Intake Face Sheet” that contains a line for someone to fill in the name of the student’s case manager, but a student roster with each case manager assigned was not provided to the Department. 8.8 IEP- Progress Reports Documentation and student record review 28.07(3) 20 U.S.C. Chapter 33, Section 1414(d)(1)(A) (viii) 34 CFR 300.347 The concern at the time of the 2003 Program Review was that progress reports did not consistently include written information on student progress toward annual goals in the IEP or includes information on the extent to which progress is sufficient to enable the student to achieve the goals by the end of the IEP period. Review of the student records and policies and procedures manual indicates that, although the written policy meets requirements, progress reports are not being issued four times a year per the school’s policy. (Formerly 8.7) 12 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Copy of memo sent to all staff members who complete progress reports that informs staff members of dates progress reports are due and procedures outlining expectations regarding the content of progress reports and persons responsible for ensuring progress reports are mailed and a copy is filed in the student record. Report on your review of 10 randomly selected student records. Indicate the dates that IEPs were mailed out for each of these students from June 1, 2006 – April 2, 2007. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 8.9 IEP- Revisions and Changes Documentation review and interview 34 CFR 300 (Formerly 8.8) The concern at the time of the 2003 Program Review was that the private school had revised/amended students’ IEPs without the authorization and presence of an administrative representative of the responsible school district. Review of the school’s policy on IEP revisions and changes during the July 2006 Mid-cycle Review indicates that the school continues to have an incorrect understanding of the private special education school’s responsibility regarding IEP revisions and changes. The school’s policy states that either the private special education school or public school representative will contact parents and reconvene the IEP Team. This is clearly the responsibility of the sending public school district. Interviews indicate that it is the private special education school’s practice to contact the sending public school if there are concerns about the appropriateness of an IEP. 13 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Revised policy on IEP revisions and changes that more clearly states the private special education school’s role when there is a concern that changes may need to be made to an IEP or an IEP Team meeting may need to be held. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 8.10 IEP- Less Restrictive Placement 28.09(9(c) (Formerly 8.9) Documentation and student record review The Department found this criterion to be implemented at the time of the 2003 Program Review. Documentation review during the July 2006 Mid-cycle Review indicates that this criterion continues to be implemented. 8.11 IEP- Transition Planning 34 CFR 300.347(b)(1) 34 CFR 300.347(b)(2) The concern at the time of the 2003 Program Review was that neither a vision statement nor a statement of needed transition services was consistently being developed as part of the IEP. For the July 2006 Mid-cyle Review, the school submitted a policy on transition planning that meets requirements. (Formerly 8.10) Submit the following documents to the Department of Education by April 2, 2007: Copy of pages from 10 IEPs that contain the vision statement and documentation of transition planning. Review of student records indicates that not all IEPs were complete so the Department of Education was not able to verify consistent documentation of vision statements and transition planning. 8.12 IEP- Transition The concern at the time of the 2003 Program Review was that the IEP Team was not 14 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Services determining student needs for continuing services from adult human services agencies nor working with the responsible school district to make necessary referrals to the Bureau of Transitional Planning. 28.05(4)(c) (Formerly 8.11) List the names of students and indicate which students have a 688 referral and if a copy is filed in the student record. In July 2006, the Department of Education did not find copies of 688 referrals in the student records randomly chosen for review. 9.1 Policies and Procedures 18.05(5) The concern at the time of the 2003 Program Review was that staff members did not consistently understand the school’s restraint policies or state and federal requirements pertaining to the use of restraint. Review of the In-Service Training calendar during the July 2006 Mid-cycle Review indicates that the school offered refresher restraint training during the last 12 months. Review of staff training log indicates that not all staff members have participated in 15 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Agenda and handouts for restraint training Name and qualifications of presenter Sign-in sheet for restraint training with name, title and signature of all staff members in attendance Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting this mandated training. 9.3 Runaway Students The concern at the time of the 2003 Program Review was that staff members did not consistently understand the school’s runaway policy. 18.03(10) Review of the In-Service Training calendar at the time of the July 2006 Mid-cycle Review indicates that the school offered refresher training on its runaway policy during the last 12 months. Submit the following documents to the Department of Education by April 2, 2007: Agenda and handouts for training on runaway policy Name and qualifications of presenter Sign-in sheet for runaway policy training with name, title and signature of all staff members in attendance Review of staff training log indicates that not all staff members have participated in this training. 9.4 Restraints 18.05 (5)(h) 603 CMR 46.00 The concern at the time of the 2003 Program Review was that the school had not developed a policy on the use of physical restraint in accordance with the requirements of 603 CMR 46.00. A review of the school’s restraint policy during the July 2006 Mid-cycle Review does 16 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Copy of revised restraint policy Agenda and handouts for training on restraint policy Name and qualifications of presenter Sign-in sheet for restraint training with name, title Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting not state that the school notifies parents in writing within 3 school working days of restraints that are over 5 minutes. The school’s policy states that it notifies parents verbally of restraints that last between 6-19 minutes. and signature of all staff members in attendance Review of personnel records in July 2006 indicate that the school is not documenting current staff training in restraint policy for all staff members. The Department found this criterion implemented at the time of the 2003 Program Review. 10.1 Student:Teacher Ratios 28.06(6)(d)&(g) 28.09(7)(e) 10.2 Age Range 28.06(6)(f) Documentation review during the July 2006 Mid-cycle Review indicates that the staff to student ratio falls within guidelines set forth under 603 CMR 28.00 regulations. Documentation review and observation The concern at the time of the 2003 Program Review was that instructional grouping in the summer school program exceeds forty-eight months and the school had not obtained a 17 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Block schedule for all classes with birth date of each student in the class Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting waiver from the Department. indicated Review of block schedules during the July 2006 Mid-cycle Review indicates that instructional groupings during the academic year exceed fortyeight months. Observation in July 2006 indicates that instructional groups exceed the forty-eight month age span and the school had not obtained a waiver from the Department. 10.4 Student: Child Care Ratios 28.09(7) 18.01(2) 11.1 Personnel Policies 28.09(7) 28.09(11)(a) 18.05(11) New Directions School is a day program. Not Applicable Documentation and personnel record review The Department found this criterion to be implemented at the time of the 2003 Program Review. Review of personnel records at the time of the July 2006 Midcycle Review indicates that New Directions School is not always following its policy regarding conducting staff evaluations. Not all employees had an annual evaluation and 18 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Policy on CORI checks Revised policy on reporting abuse and neglect List of all staff members, the date of their last and next scheduled evaluation Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting new employees did not have an evaluation after 90 days. There is no written policy on CORI checks and the policy on reporting abuse and neglect incorrectly states that staff members must report possible abuse or neglect to a supervisor. 11.3 Educational Administrator Qualifications 28.09(7)(a) 603 CMR 44.00 and 44.04 11.4 Teachers Special Education Teachers and Regular Education Teachers 28.09(7)(b)(c) 18.05(11)(f) Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that this criterion continues to be fully implemented. Documentation and personnel record review The concern at the time of the 2003 Program Review was that one teacher was not licensed by the Massachusetts Department of Education. Review of teacher licenses during the Mid-cycle Review in July 2006 indicates that all teachers hold a current Massachusetts Department of Education license or approved waiver. 19 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Report on your review of personnel records for all persons who are required to have a Massachusetts teaching license or approved waiver, including teachers, special education administrator and speech and language pathologists. Indicate whether a copy of the Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 11.4(a) Professional Development Plans 28.09(7)(b)(c) Documentation and personnel record review Review of personnel records indicates that a copy of teaching licenses are not filed in personnel records. DOE license is in each personnel record. Compliance with this regulation was not monitored at the time of the 2003 Program Review. Submit the following documents to the Department of Education by April 2, 2007: Report on your review of personnel records for all persons who are required to have a professional development plan, including professional level teachers, special education administrator and speech and language pathologists. Indicate whether a copy of the professional development plan is in each personnel record. Review of professional development plans for professional level licensed teachers during the Mid-cycle Review in July 2006 indicates that professional development plans contain all required information. 18.05(11)(f) Review of personnel records indicates that a copy of professional development plans are not filed in personnel records. 11.5 Related Services Staff 28.09(7)(d) Not Applicable Documentation review and interview This criterion was found to be “not applicable” at the time of the 2003 Program Review because New Directions was not providing related services as part of its rate. Interview during the July 2006 Mid-cycle Review indicates that the school now hires medical and 20 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting clinical staff who are partially funded through the Operational Services Division, which sets the tuition rate for the school program. 11.6 Master Staff Roster 28.09(7) Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that the private special education school did not have a master staff roster that contained all the information requested by the Department of Education. 11.7 Job Descriptions 18.05(11)(d) Documentation and personnel review The Department found this criterion to be implemented at the time of the 2003 Program Review. For the July 2006 Mid-cycle Review, New Directions School only submitted job descriptions for teachers, teacher assistants and instructors. Job descriptions were not found in 21 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Master Staff Roster containing all information requested by the Department of Education in the Department’s publication, “Application Procedures for Department of Education Approval of a Massachusetts Public or Private Day or Residential Special Education School Program”. Submit the following documents to the Department of Education by April 2, 2007: Report on your review of personnel records for all staff members. Indicate whether a copy of the job description is in each personnel record. Submit a copy of the Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting personnel records. 11.8 Salary Ranges 18.05(11)(e) Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. memo sent to each staff member with a copy of his or her job description as evidence that each staff member understands his or her job duties. Submit the following documents to the Department of Education by April 2, 2007: Salary ranges for all staff positions For the July 2006 Mid-cycle Review, New Directions School submitted information on salary ranges for teaching staff but not administrators. 11.9 Organizational Structure 28.09(7) 28.07(c) Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. For the July 2006 Mid-cycle Review, New Directions School submitted a copy of its organizational structure. The Department found that the private special education school continues to be in compliance with this criterion. The Department found this 11.11 22 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit a copy of the policy on Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Supervision of Students 28.09(7) Documentation review criterion to be implemented at the time of the 2003 Program Review. New Directions School did not submit information to address this criterion at the time of the July 2006 Mid-cycle Review. See comment under criterion 10.1 regarding student to staff ratios during academic classes and field trips. 11.12 Accessibility of Extracurricular Activities Title VI: 42 U.S.C. 2000d; 34 CFR 100.3(a), (b); Title IX: 20 U.S.C. 1681; 34 CFR 106.31, 106.41; Section 504: 29 U.S.C. 794; 34 CFR 104.4,104.37(a), (c); Title II: 42 U.S.C. 12132; 28 CFR 35.130; Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. Documentation review during the July 2006 Mid-cycle Review indicates that New Directions School continues to be in compliance with requirements of this criterion. 23 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 supervision of students to the Department of Education by April 2, 2007. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting NCLB: Title X, Part C, Sec. 721; Mass. Const. amend. art 114; M.G.L. c. 76, s. 5; 603 CMR 26.06 12.1 Staff Orientation Training Documentation and personnel record review 18.05(11)(g) The concern at the time of the 2003 Program Review was that new staff members were not receiving training in all mandated topics prior to assuming direct care duties. Additionally, the school had no written plan describing how newly hired staff would be provided training on all required topics at the time of hire if the required topics had already been covered with existing staff. A review of the of school’s New Staff Orientation procedures during the July 2006 Mid-cycle review indicates that not all mandated topics are covered or required for all staff members during orientation. This policy states that all staff members receive 40 hours of restraint training, which is offered by the school quarterly, CPR within 6 months and First 24 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Revised policy on training of new staff that indicates that newly hired staff receive training in all Department of Education mandated topics before working directly with children. Description of the private school’s new system to accurately document training that each staff member attends. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Aid within 3 months of employment. This indicates that some staff members may not have completed all mandated trainings before being assigned direct care duties with students. Review of staff training records confirms that new staff members are not receiving training in all mandated topics before working directly with students. 12.2 Annual InService Training Plan and Calendar 28.09(7)(f) 18.05(11)(h) Title VI: 42 U.S.C.2000d;34 CFR 100.3;EEOA:20 U.S.C.1730(f); Title IX: 20 U.S.C.1681; 34 CFR 106.31106.42; M.G.L.c.76, s.5; Documentation review The concern at the time of the 2003 Program Review was that attendance at staff orientation and in-service trainings was not consistently documented. A review of the school’s annual inservice training calendar during the July 2006 Mid-cycle review indicates that the school did not offer an average of 2 hours of training per month that included all mandated topics for all staff members in the 2005-2006 academic year, but has scheduled all mandated trainings for all staff members for the 2006-2007 academic year. 25 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance 603 CMR 26.00, esp.26.07(2),(3) At this time it appears that the private special education school has already taken steps to come into compliance with this regulation regarding required staff trainings. 26 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 12.2 (a) Behavior Management and Restraint Training Documentation and personnel record review 28.09(11) 18.05(5) The concerns at the time of the 2003 Program Review were that 1) staff members did not consistently understand the legal requirement of the restraint regulations, 2) the school had no procedure for integrating discipline and behavior data into the IEP TEAM discussion and 3) staff training on this topic was not consistently documented. Review of the In-Service Training calendar at the time of the July 2006 Mid-cycle Review indicates that the school offered refresher training in restraint procedures and its behavior management level system within the past 12 months. Review of staff training log in July 2006 indicates that not all staff members have participated in restraint refresher and behavior management training within the past 12 months. 27 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: List of all staff members who the private special education school requires to be fully restraint trained Indicate the date of the most recent full training or refresher training for each of these staff members Written procedures on how the private special education school will ensure that discussion of each student’s recent behavior and discipline history at each IEP meeting will be documented and placed in the student record. Indicate what data will be brought to the IEP Team meeting and who will be responsible for communicating this information to the IEP Team. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 12.2 (b) Details Child Abuse Reporting Documentation and personnel record review New Directions School did not submit a copy of its procedure to ensure that information on the student’s recent behavior and discipline history is communicated to IEP Team members. Review of student records did not indicate that discussion of a student’s behavior or discipline was documented in the student record. The concern at the time of the 2003 Program Review was that orientation and in-service training on this topic was not consistently documented. 18.05(9)(j) Review of the In-Service Training calendar at the time of the July 2006 Mid-cycle Review indicates that the school offered training in reporting child or adult abuse and neglect within the past 12 months. 12.2 (c) Details Review of the staff training log in July 2006 indicates that not all staff members participated in this training. The concern at the time of the 2003 Program Review was that Documentation 28 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Indicate the date of the most recent training in reporting abuse or neglect for each staff member Description of the private school’s new system to accurately document training that each staff member attends Submit the following documents to the Department Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Emergency First Aid Training and CPR Certification and personnel record review 18.05(9)(e) 12.2 (f) Emergency Procedures Training orientation and in-service training on this topic was not consistently documented. Review of the In-Service Training calendar at the time of the July 2006 Mid-cycle Review indicates that the school offered training in CPR but did not offer training in Emergency First Aid within the past 12 months. Documentation and personnel record review 18.05(10) Review of the staff training log in July 2006 indicates that not all staff members participated in these trainings. The CPR or first aid training for some staff members had expired. The concern at the time of the 2003 Program Review was that staff members were not trained in the use of the alarm system and equipment such as fire extinguishers. Review of the In-Service Training calendar at the time of the July 2006 Mid-cycle Review indicates that the school offered training in evacuation and emergency procedures and policies within the past 12 29 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 of Education by April 2, 2007: Indicate the date of the most recent training in CPR and First Aid for each staff member Description of the private school’s new system to accurately document training that each staff member attends Submit the following documents to the Department of Education by April 2, 2007: Indicate the date of the most recent training in evacuation and emergency procedures and policies for each staff member Description of the private school’s new system to accurately document training that each staff member attends Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting months. Review of the staff training log in July 2006 indicates that not all staff members participated in this training. 12.2 (i) Staff Evaluations 18.05(11)(c)1. Documentation and personnel record review The concern at the time of the 2003 Program Review was that written performance evaluations were not maintained on all staff. Review of personnel records during the Mid-cycle Review in July 2006 indicates that staff members are not all receiving an evaluation after 90 days of employment and annually as written in the personnel policy manual. 30 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: List of staff members hired after July 1, 2006 and the date of their most recent written performance evaluation Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance 13.3 Comparability of Facilities Observation Title VI: 42 U.S.C. 2000d; 34 CFR 100.3(b)(2); Title IX: 20 U.S.C. 1681; 34 CFR 106.33,106.40(b) (3); Section 504: 29 U.S.C. 794; 34 CFR 104.34(c); Mass. Const. amend. art. 114; 603 CMR 28.03(1)(b) The Department found during the July 2006 Mid-cycle Review that this criterion continues to be fully implemented. 13.4 Physical Facility/ Architectural Barriers 18.04(8) Section 504: 29 U.S.C. 794;34 CFR 104.21. 104.22; Title II: 42 U.S.C. 12132; 28CFR 35.149, The Department found this criterion to be implemented at the time of the 2003 Program Review. Documentation review and observation The concern at the time of the 2003 Program Review was that the school building bathroom was not accessible. Observation at the time of the July 2006 Mid-cycle review is that the “Carriage House” classroom building is not handicapped accessible. This is where the younger students have classes. Documentation review indicates that New Direction School’s plan is to move a classroom from the 31 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 35.150; Mass. Const. amend. art. 114 Carriage House building to the Montgomery school building to hold classes for younger students there if a student that required a handicapped accessible classroom were enrolled at Cutchins School. (Formerly 13.3) 13.5 Observation Kitchen, Dining, Bathing/ Toilet, and Living Areas The concern at the time of the 2003 Program Review was that school buildings were not always clean or well maintained. Submit the following documents to the Department of Education by April 2, 2007: Plan for scheduled building maintenance Observation at the time of the July 2006 Mid-cycle review indicates that, although school buildings seem to be clean, floors are old and some walls need to be painted. 18.04(2, 3, 4, 5) (Formerly 13.4) 13.7 Observation Library/ Resource Room The concern at the time of the 2003 Program Review was that the school did not have a library or resource room in addition to the regular instructional area. 18.04(6)(b) Observation during the July 2006 Mid-cycle review indicates that although the school has identified a location for the library space within the computer room, it does not (Formerly 13.6) 32 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Plan for increasing the number of books and other materials in the library Description for cataloging library materials Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance contain a variety of materials appropriate to the age of students served at New Directions School. 33 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 13.8 Observation Indoor Space 18.04(7)(a) The concern at the time of the 2003 Program Review was that overhead lighting fixtures in the Carriage House building were not covered and may present a potential safety hazard. Observation at the time of the July 2006 Mid-cycle review indicate that classroom in the basement of the Carriage House smelled musty, was not well ventilated and had potential electrical hazard with the easily accessible fuse box and surrounding electrical equipment. The timeout room in the Carriage House is located in a former garage and has many hazards such as protruding springs and metal garage door mechanisms. In addition, classroom spaces were cluttered and disorganized. Classroom space for individualized reading in the Carriage House is located in a small room off of the art room that is inappropriate because it is dark, cluttered and located in 34 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Timeline for moving classroom from the basement or plan to cover fuse box and modify this classroom so that it is properly ventilated. Timeline for moving the timeout room in the Carriage House or modifying it so that it does not have protruding objects. Plan to ensure that extraneous items in classrooms are removed or properly stored. Include staff member who will be responsible for monitoring this. Memo to staff members Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting a space that is adjacent to the open space where art classes are held as well as the time-out room. 15.1 Parental Involvement and Parents’ Advisory Group 18.05(4)(a) 15.2 Orientation Procedures Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that this criterion continues to be fully implemented. Documentation review 28.09(11) The concern at the time of the 2003 Program Review was that the school had not developed or implemented orientation procedures for parents upon student admission to the program. The Department found during the July 2006 Mid-cycle Review that this criterion is fully implemented. 15.3 Information to be translated into Languages other Documentation review Compliance with this regulation was not monitored at the time of the 2003 Program Review. The Department found during the 35 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 about the need to maintain clean and organized classroom spaces. Plan to move location of individualized reading to another location. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting than English July 2006 Mid-cycle Review that this criterion is fully implemented. Title VI; EEOA: 20 U.S.C. 1703(f); M.G.L. c. 76, s. 5; 603 CMR 26.02(2) 15.6 Student Involvement Documentation review The concern at the time of the 2003 Program Review was that the school did not have a written policy in place regarding student participation in TEAM meetings. 34 CFR 300.344 The Department found during the July 2006 Mid-cycle Review that New Directions School has a policy on student involvement that meets the requirements. (Formerly 15.5) 15.7 Consent at Age of Majority Documentation and student record review The concern at the time of the 2003 Program Review was that the school did not have a policy in place regarding student consent. 28.07(5) The Department found during the July 2006 Mid-cycle Review that New Directions School has a policy on student consent at age of majority that meets requirements. (Formerly 15.6) 36 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Memo sent to all staff members on how the private special education will ensure that when the student turns 17 years old, the requirement for the student to sign the IEP at age 18 and the student’s wishes about parental involvement in Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting Review of student records indicates that discussion of consent at age of majority is not always documented in student records. 15.8 Registering Complaints Documentation review The Department found this criterion to be implemented at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that New Directions School continues to fully implement this criterion. 18.05(1)(b)16 Title IX: 20 U.S.C. 1681; 34 CFR 106.8; Section 504: 29 U.S.C. 794; 34 CFR 104.7; Title II: 42 U.S.C. 12132; 28 CFR 35.107; NCLB: Title X, Part C, Sec. 722(g)(1)(J)(ii) (Formerly 15.7) 16.9 Students with Comfort Care/Do Not Resuscitate Orders Documentation review Compliance with this regulation was not monitored at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that 37 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 educational decisionmaking after age 18 is documented in student records. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting New Directions School has developed a policy on Comfort Care/Do Not Resuscitate Orders that contains required elements. 16.10 Meningococcal Disease and Vaccination Documentation review Compliance with this regulation was not monitored at the time of the 2003 Program Review. The Department found during the July 2006 Mid-cycle Review that New Directions School has developed a policy on Meningococcal Disease and Vaccination that contains required elements. MGL, Chapter 76, s.15D 105 CMR 220.700 17.1 Transportation Safety Documentation and personnel record review The concern at the time of the 2003 Program Review was that orientation and training of staff is inconsistently documented. 28.09(11)(b) Review of the In-Service Training calendar and sign-in sheet at the time of the July 2006 Mid-cycle Review indicates that the school offered training in transportation procedures and policies within the past 12 months. Review of the written policy on transportation safety, however, 38 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: Submit a revised Transportation Policy Submit a list of all staff members who transport students in their personal vehicles For each staff member who transports students in their personal vehicle, submit a review of their individual personnel record that indicates Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting indicates that the policy does not address the requirement for staff members who transport students to receive in-service training on the individual needs of students they transport. This policy also does not state that New Directions School is required to notify the Department of Education if staff members are involved in a motor vehicle accident while transporting students. Review of personnel records in July 2006 indicates that New Directions School is not keeping a copy of current driver’s license on file for all staff members who transport student in school-owned vans. If staff members ever transport students in their personal vehicles, information on car insurance and registration is not maintained in personnel records. 39 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 whether a current drivers license, vehicle registration and inspection are found in each personnel record. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting 18.2 Student Records 28.09(10) Student record review MGL c. 71, s. 34H 603 CMR 23.00 Family Educational Rights and Privacy Act (FERPA) The concern at the time of the 2003 Program Review was that student records did not contain the following items: Log of access Recent picture Educational assessments Correspondence with the parent and sending school district Face Sheets were not updated annually and they did not contain the following items: Name of Educational Case Manager Information to the transfer of rights upon the student reaching eighteen years of age Information on other state agency involvement Date of the student’s last physical exam 40 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Submit the following documents to the Department of Education by April 2, 2007: A statement that assures the Department that all student record face sheets have been reviewed and revised to include all required elements. Submit a random sample of the face sheets of ten students. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Review of student records at the time of the July 2006 Mid-cycle Review indicates that New Directions School maintains a current log of access and recent picture and correspondence with parent and sending school district in each student file. Face Sheets have been revised to contain a space for staff members to record information on Educational Case Manager, transfer of rights, other state agency involvement, and date of physical exam, but information on face sheets is not always completed with all required information or updated annually. 41 New Directions School Cutchins Program Mid-cycle Review Report February 7, 2007 Further Corrective Action Ordered by the Department of Education and Timelines for Implementation and Further Progress Reporting