Massachusetts Department of Elementary and Secondary Education 75 Pleasant Street, Malden, Massachusetts 02148-4906 Telephone: (781) 338-3700 TTY: N.E.T. Relay 1-800-439-2370 February 4, 2011 Jane-Elisabeth Jakuc Broccoli Hall Corwin-Russell Day Program 142 North Street Sudbury, MA 01776 Re: Mid-cycle Review and Verification of previous Program Review Corrective Action Plan Dear Ms. Jakuc: Enclosed is the Department of Elementary and Secondary Education’s (“Department”) Mid-cycle Report based upon the Mid-cycle review conducted in your private school program in December 2010. This Mid-cycle Review Report contains the Department's findings regarding the implementation status and effectiveness of corrective steps taken in response to your previous Program Review Report issued on August 20, 2008. This report also includes a report on the status of implementation for new state or federal special education requirements enacted since your program’s last Program Review. While the Department found certain noncompliance issues to be resolved, others were partially corrected, not addressed at all and/or new issues were identified by the Department’s onsite team. Therefore, the Department is issuing a “Provisional Approval” status effective from the date of this letter and indicated on your approval certificate. Your “Provisional Approval” will expire on June 24, 2011. The reasons for the “Provisional Approval” are clearly indicated on the attached Mid-cycle Review Report. As the Department previously informed you, in cases where a program fails to fully and effectively implement a Corrective Action Plan which was proposed by your program and approved by the Department, the Department must then prepare a Corrective Action Plan for the program which must be implemented without further delay. You will find these requirements for corrective action and further progress reporting included in the attached report, together with any steps that must be taken by the program to fully implement new special education requirements. Please provide the Department with your written assurance that the Department's requirements for corrective action will be implemented by your program within the timelines specified. Your statement of assurance must be submitted to the Department's Onsite Chairperson by February 18, 2011. Page 1 of 2 Please be advised that the attached Department Approval Certificate must be conspicuously posted in a public place within the program as required by 603 CMR 28.09. Your staff's cooperation throughout these follow-up monitoring activities is appreciated. Should you require additional clarification of information included in our report, please do not hesitate to contact the Onsite Team Chairperson at 781-338-3713. Sincerely, Helen M. Murgida, Mid-cycle Review Chairperson Program Quality Assurance Services Darlene Lynch, Director Program Quality Assurance Services c: Mitchell D. Chester, Ed.D., Commissioner of Elementary and Secondary Education Encl.: Mid-cycle Review Report Provisional Private School Approval Certificate, Expiration Date: June 24, 2011 Page 2 of 2 MASSACHUSETTS DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION PRIVATE SCHOOL MID-CYCLE REVIEW BROCCOLI HALL CORWIN-RUSSELL DAY PROGRAM MID-CYCLE REVIEW REPORT Previous Program Review Corrective Action Plan Submitted on May 15, 2009 Progress Reports Submitted on June 10, 2009 Mid-cycle Onsite Visit Conducted on December 7 and 8, 2010 Date of this Report February 4, 2011 Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 1 of 19 Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Selected Approved Private School Program Mid-cycle Review Criteria 2.2 Approvals, Licenses, Certificates of Inspection Observation 18.04(1); 28.09(2)(b)(5); 28.09(5)(b); 28.09(6)(b, c) 2.3 EEC Licensure Documentation Not Applicable Corwin-Russell Day Program has on file all required approvals, licenses, and certificates of inspection. At the time of the March 2008 Program Review, Broccoli Hall did not have a copy of the final approval from the Sudbury School Committee. The program has located and submitted the final approval from the school committee in August 1997 as required. Corwin-Russell Day Program is approved as a Day School Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 2 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation 102 CMR 3.00 (Residential Schools only) 8.5 Current IEP & Student Roster Program and therefore this criterion is not applicable. Documentation Student Record Review 28.09(5)(a) Interviews 11.3 Educational Administrator Qualifications 28.09(5)(a); 28.09(7)(a); 603 CMR 44.00 Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Personnel Record Reviews The Program has on file a current IEP for each enrolled Massachusetts student that has been issued by the responsible school district and consented to and dated by the student’s parent(s) (or student, when applicable). Corwin-Russell Day Program has designated a staff member as the Educational Administrator who meets the qualifications to serve in this position. Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 3 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic 11.4 Teachers (Special Education Teachers and Regular Education Teachers) Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Documentation Staff Interviews Personnel Records Through documentation, interviews, and review of records, Broccoli Hall Teacher Roster indicates that all teachers are currently licensed or waivered. At the time of the March 2008 Program Review, Broccoli Hall had two teachers who were not appropriately licensed. All staff are now currently licensed or waivered. 18.05(11)(f); 28.09(5)(a); 28.09(7)(b, c); 34 CFR 300.321 11.5 Related Services Staff Method(s) of Verification Not Applicable Broccoli Hall does not have related services staff. 28.09(7)(d) Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 4 of 19 . Criterion Number and Topic 11.6 Master Staff Roster Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting At the time of the March 2008 Program Review, the master staff roster and last approved budget indicated that the program has a .25 FTE UFR 108 Registered Nurse but interviews indicated that the current nurse was being paid as a consultant. The nurse is listed as UFR #201, Direct Care Consultant, FTE .25. A Form 1 requesting this change was submitted on November 1, 2010 and the Department is By March 4, 2011, Broccoli Hall must submit the required documentation to complete the Form 1 submitted November 1, 2010 stating that the request for changing staffing positions will not result in a request for a rate change and a copy of the written notification that will be sent to funding sources once changes have been approved by ESE. Documentation Interviews 28.09(7) Comments Regarding Corrective Action Plan Implementation At the time of the March 2008 Program Review, Broccoli Hall documentation review indicated that Broccoli Hall had three staff listed under two or three UFR titles and their total full time equivalent (FTE) exceeded one FTE. One staff member is now listed as UFR #130, Counselor, 1.0 FTE and as UFR #138, Program Support 1.0 FTE. The explanation for this arrangement is that this staff performs all program support services before school, after school, on weekends and in the summer, not during school hours where he functions as Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 5 of 19 Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Counselor (Time Out Coordinator). Documentation review and interviews indicated that Broccoli Hall has an assistant teacher position, which was not included in the ESE approved budget. Broccoli Hall reports this staff as UFR #130 Counselor, .4 FTE on the master staff roster; however, this person does not provide counseling services and functions as Project FEAT Coordinator. still waiting for requested required documentation as of February 2, 2011. Also, a staff member was listed incorrectly as UFR #115, 1 FTE and has been moved to UFR #116, 1 FTE. Another staff member was listed on the master staff roster Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 6 of 19 Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified as .5 FTE Admission Counselor under UFR position #130 Counselor. This staff is supporting the program’s admissions process and is not providing therapeutic or instructive counseling to program clients as this position is defined by the Operational Services Division. Additionally, this position was not approved by ESE. This position, UFR #130 Counselor is now listed as 1.0 FTE Academic Support/Instructive Counseling. Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 7 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic 19 Anti-Hazing Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Documentation M.G.L. c. 269, §§ 17 through 19 Broccoli Hall submitted an Anti-Hazing Policy and documented that it is distributed yearly and is included in the student handbook as required. Identified Areas of Non-Compliance During the Program Review or Other Areas of Concern 1.2 Program & Student Description, Program Capacity 28.09(2)(a)(2); 28.09(2)(b)(2, 3, 7) Documentation Interviews The documentation submitted by Broccoli Hall now includes a description of pre-vocational, vocational, career education services or English language support services that would be provided if a limited English proficient student was enrolled in the program. Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 8 of 19 Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic 4.5 Immediate Notification Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Documentation Interviews Documentation Interviews 603 CMR 27.05(2); 28.09(9)(a) Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Student Record Review 18.03(10); 18.05(7); 28.09(12) (a, b) 6.4 School Days Per Year Method(s) of Verification Broccoli Hall submitted procedures regarding immediate notification that includes all instances when notification is required. The procedure now includes filing of a 51A report with the Department of Children and Families (DCF) against the school or a school staff member for abuse or neglect of a student. Broccoli Hall submitted the 2010-2011 school calendar that shows 180 school days and includes five additional days to account for unforeseen circumstances as required. Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 9 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation 28.07(3); 34 CFR 300.320(a)(3)(i, ii) Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting At the time of the March 2008 Program Review, review of student records indicated that IEP progress reports are not written narratives but one sentence summaries and that students continue to receive a letter indicating progress for each objective. Also, some IEPS were missing Placement pages and Administrative Data sheets. This was also found during the By March 4, 2011 Broccoli Hall must submit a summary of all students that indicates that each student’s current IEP contains an Administrative Data Sheet and Placement Page, and/or documentation of efforts to receive this documentation. 8.8 IEP – Progress Reports Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Student Record Review Broccoli Hall sends reports to parents on a weekly and monthly basis, if needed, and sends all parents a written report on their child’s academic and behavioral status two times a year. Student record review indicated that information on the student's progress toward the annual goals in the IEP is now sent as often as indicated in the program’s policy. Documentation review indicated that the program sends reports including information on the student's progress toward the annual goals in the IEP to parents and Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 10 of 19 By June 3, 2011 Broccoli Hall must submit IEP progress for ten randomly selected students that contain written narratives reporting progress on each Goal and Objective in the IEP specific to each student as required. Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation the district quarterly. Documentation Student Record Review 18.05(6) Interviews 12.2 In-Service Training Plan and Calendar 28.09(7)(f); Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance 9.5 3-5 Day Suspensions Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Personnel Record Review December 2010 Midcycle Review. Broccoli Hall’s policy on 3-5 day suspensions now includes that the Program abides by a doctor’s order requiring a student not to attend school for any medical reason and the duration of the absence is dictated by the physician, not Broccoli Hall. This policy is also included in the parent handbook. Documentation and interviews indicated that staff who administer medications now receive training annually on how to appropriately Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 11 of 19 Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation 28.09(9)(b); 28.09(10); 18.03(3); 18.05(9)(e)(1); 18.05(10); 18.05(11)(h) Title VI: 42 U.S.C. 2000d; 34 CFR 100.3; EEOA: 20 U.S.C. 1703(f); Title IX: 20 U.S.C. 1681; 34 CFR 106.31-106.42; M.G.L. c. 76, § 5; 603 CMR 26.00, esp. 26.07(2, 3) Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Interviews administer medications. Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 12 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic 15.1 Parental Involvement and Parents’ Advisory Group Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Student Record Review revealed that there were no yearly required Permission to Restrain forms signed by parents/guardians as required. By March 4, 2011 Broccoli Hall must submit a copy of their Consent to Restrain which must be distributed annually and copies of signed Restraint Forms for all students. Documentation Interviews Broccoli Hall submitted copies of notices and agendas for the Parents’ Advisory Group. 18.05(4)(a) 15.5 Parent Consent and Required Notification 18.05(5)(c); 18.05(8); 18.05(9)(f)(1); 18.05 (9)(j); M.G.L. c. 71, § 32A Documentation Student Record Review Interviews At the time of the 2008 Program Review, documentation review indicated that Broccoli Hall’s policy regarding parental consent did not describe the school’s procedures to obtain parent consents and did not include experimentation, fundraising or observation. These elements have been Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 13 of 19 Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified added as required. Additionally, Broccoli Hall removed the statement in the Parent/Student Handbook that if a parent does not sign the consent for photographs for The Play, “continued enrollment is effected” since enrollment at Broccoli Hall cannot be contingent on giving consent for photographs or publicity. 15.8 Registering Complaints and Grievances – Parents, Documentation Personnel Record Review Student Record The grievance procedure developed by Broccoli Hall now directs students and parents who believe they have been discriminated against if dissatisfied with the school’s Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 14 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Review Students and Employees 18.05(1)(b) (16); Title IX: 20 U.S.C. 1681; 34 CFR 106.8; Section 504: 29 U.S.C. 794; 34 CFR 104.7; Title II: 42 U.S.C. 12132; 28 CFR 35.107 16.5 Administration of Medication 18.05(9)(f)(8) Personnel Record Review Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Documentation Interviews Civil Rights officer’s decision to contact the U. S. Department of Education, Office of Civil Rights that investigates allegations of discrimination in schools. This policy has been added to the faculty handbook and the Student/Parent handbook. Broccoli Hall now keeps its medications in a locked, secure cabinet and medications that require refrigeration are kept in the business office, in an area Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 15 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified that Broccoli Hall reports is not accessible to students. 16.7 Preventive Health Care 18.05(9)(g)(1); 105 CMR 200.100(B)(1); 105 CMR 200.400(B); 105 CMR 200.400(C); G.L. c. 71, § 57; and G.L. c. 111, § 111. Documentation Student Record Review Interviews During the 2008 Program Review, documentation review indicated that Broccoli Hall had a plan to ensure that vision, hearing and postural screenings are conducted in accordance with MGL c 111, s. 111,.Student record reviews now indicate that all students have received vision, hearing screenings annually or postural screenings during grades 5-9 In accordance with the following required schedule: Vision The vision of each student Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 16 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified in the program is to be screened in the year of program entry; annually through grade 5 (or by age 11 in ungraded classrooms); once in grades 6 through 8 (or ages 12 through 14 in ungraded classrooms); and once in grades 9 through 12 (or ages 15 through 18 in ungraded classrooms). 105 CMR 200.400(C) Hearing The hearing of each student in the program is to be screened in the year of program entry; annually through grade 3 (or by age Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 17 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified 9 in the case of ungraded classrooms); once in grades 6 through 8 (ages 12 through 14 in the case of ungraded classrooms); and once in grades 9 through 12 (ages 15 through 18 in the case of ungraded classrooms). G.L. c.71, § 57 Posture Tests ascertaining postural defects shall be administered at least once annually in grades 5 through 9. 18.1 Confidentiality of Student Documentation Student Record Student record review indicated that the log of access used by Broccoli Hall now Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 18 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Criterion Number and Topic Implementation Status of Requirements or Corrective Action Plan Determined to be Substantially Implemented Method(s) of Verification Comments Regarding Corrective Action Plan Implementation Corrective Action Plan Determined to be Not Fully Implemented or Additional Issues Identified Records Review 28.09(5)(a); 28.09(10); 23.07(1); M.G.L. c. 71, § 34H Interviews includes all required information, including the name, position and signature of the person releasing the information, or the position, and, if a third party, the affiliation if any, of the person who is to receive the information as required. Broccoli Hall Corwin-Russell Day Program Mid-cycle Review Report February 4, 2011 Page 19 of 19 Findings Regarding Incomplete Implementation of Approved Corrective Action Plan or Identification of Additional Issues of Noncompliance Further Corrective Action Ordered by the Department of Elementary and Secondary Education and Timelines for Implementation and Further Progress Reporting Commonwealth of Massachusetts Department of Elementary and Secondary Education BROCCOLI HALL CORWIN RUSSELL DAY PORGRAM A PRIVATE SPECIAL EDUCATION PROGRAM OPERATED PURSUANT TO 603 CMR 18.00 AND 28.09 142 North Road Sudbury, MA 01776 Program Rate Based on: 55 Students Approved Enrollment: 55 Students X Day Program Summer Program Residential Program X 10 month program 11 month program 12 month program APPROVED STUDENT:LICENSED EDUCATOR RATIO: 7:1 APPROVED STUDENT:LICENSED EDUCATOR:AIDE RATIO: Not Applicable APPROVAL STATUS PROVISIONAL APPROVAL Expires on: June 24, 2011 The current approval is a result of a Mid-cycle Review conducted in the 2010-2011 school year and the next review is scheduled for the 2013-2014 school year. HELEN M. MURGIDA, EDUCATIONAL SPECIALIST, PROGRAM QUALITY ASSURANCE SERVICES NINA M. MARCHESE, SUPERVISOR, PROGRAM QUALITY ASSURANCE SERVICES DARLENE A. LYNCH, DIRECTOR, PROGRAM QUALITY ASSURANCE SERVICES DATE ISSUED: 2/4/11